In the Matter of: Investment approval for Construction of Colony at 132 kV Substation Majra Campus, Dehradun.

 In the Matter of: Power Transmission Corporation of Uttarakhand Ltd., Vidyut Bhawan, Majra, Dehradun. …………Petitioner

27.12.2016

In the Matter of: Investment approval for procurement and stringing of 132 kV Roorkee-Laksar line by replacing existing wolf/panther conductor with HTLS Conductor.

In the Matter of: Power Transmission Corporation of Uttarakhand Ltd., Vidyut Bhawan, Majra, Dehradun. …………Petitioner

27.12.2016

In the Matter of: Investment approval for procurement and stringing of 132 kV Roorkee-Manglore line by replacing existing wolf/panther conductor with HTLS Conductor.

In the Matter of: Power Transmission Corporation of Uttarakhand Ltd., Vidyut Bhawan, Majra, Dehradun.

27.12.2016

In the matter of:

Review Petition filed under Regulation 54 of the UERC (Conduct of Business) Regulations, 2014 for review of the Order dated 28th Oct., 2016 passed by the Commission in the matter of Adjudication of dispute under Section 86(1)(f) between Uttar Bharat Hydro Power (P) Ltd. & Uttarakhand Power Corporation Ltd. in respect of 10.5 MW Sarju-III Small Hydro Power Project.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of:

M/s Uttar Bharat Hydro Power (P) Ltd. … Respondent

22.12.2016

In the matter of:

Application seeking approval of the Commission on the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Uttar Bharat Hydro Power Pvt. Ltd.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of:

M/s Uttar Bharat Hydro Power Pvt. Ltd. ... Respondent

09.12.2016

In the matter of:

Application seeking approval of the Commission on the Power Purchase Agreement between Uttarakhand Power Corp. Ltd. and Khutani Hydro Power Project.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of:

M/s Khutani Power Company Pvt. Ltd. ... Respondent

09.12.2016

In the matter of: Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corp. Ltd. and M/s Beta Infratech Pvt. Ltd.

In the matter of: Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of: M/s Beta Infratech Pvt. Ltd. … Respondent

15.11.2016
In the matter of: Waiver and refund of penalty imposed by the Commission vide its Order dated 01.09.2005. &
Show Cause Notice issued by the Commission vide its letter dated 18.04.2016.
And
In the matter of: Uttarakhand Power Corporation Ltd. (UPCL) …... Petitioner
15.11.2016
In the matter of: Petition to determine the project specific Tariff of Chamoli Extension Mini Hydro Power Project of Capacity of 3 MW on cost plus approach.
In the matter of: Uttarakhand Renewable Energy Development Agency … Petitioner AND
In the matter of: Uttarakhand Power Corporation Ltd. ... Respondent
04.11.2016

In the Matter of: Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence for Investment approval for Augmentation of Transformation capacity from 2x40 MVA (132/33 KV) to 3x40 MVA (132/33 KV) by commissioning of 01 No. additional 132/33 KV 40 MVA T/F, HV & LV bay & oil pit for NIFPES & construction of 03 Nos. new 33 KV feeder Bays at 132 KV S/s Jashodharpur, Kotdwar (Pauri Garhwal).

 In the Matter of: Power Transmission Corporation of Uttarakhand Ltd., Vidyut Bhawan, Majra, Dehradun. …………Petitioner

18.10.2016

In the Matter of: Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence for Investment approval for Augmentation of 132 KV Substation Bindal from 2x40 MVA (132/33 kV) to 3x40 MVA (132/33 kV) by procurement, Installation & Commissioning of 132/33KV, 40 MVA Transformer at 132 kV Substation Bindal, Dehradun.

In the Matter of: Power Transmission Corporation of Uttarakhand Ltd., Vidyut Bhawan, Majra, Dehradun. …………Petitioner

18.10.2016

In the Matter of: Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence for Investment approval for Shifting of 132 kV lines in Dev Sanskriti Vishvavidyalaya Campus for Shri Ved Mata Gayatri Trust Shantikunj Haridwar.

In the Matter of: Power Transmission Corporation of Uttarakhand Ltd., Vidyut Bhawan, Majra, Dehradun. …………Petitioner

18.10.2016

In the matter of:

Petition seeking determination of provisional tariff in anticipation of completion of Tanga Small Hydro Power Project (5 MW) of Himalaya Hydro Pvt. Ltd., as per Regulation 13, Sub-Clause (2) and Regulation 10, Sub-Clause (2) (option for fixation of "Project Specific Tariff") of UERC (Tariff and Other Terms for Supply of Electricity from non-conventional and Renewable Energy Sources) Regulations, 2013.

In the matter of:

M/s Himalaya Hydro Pvt. Ltd. … Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. ... Respondent

05.10.2016

In the Matter of:

Investment Approval for Construction of Separate Building for SLDC at 132 KV Substation, Majra Campus, Dehradun.

In the Matter of:

Power Transmission Corporation of Uttarakhand Ltd., Vidyut Bhawan, Majra,  Dehradun.

…………Petitioner

20.09.2016

In the matter of:

Petition seeking approval of Business Plan for the Control Period starting from FY 2016-17 to FY 2018-19 for 214 MW Gas based Kashipur Combined Cycle Power Plant of Gama Infraprop Private Ltd. at Mahukhedaganj, Kashipur, District Udhamsingh Nagar, Uttarakhand.

In the matter of:

M/s Gama Infraprop (P) Ltd. …Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. ...Respondent

07.09.2016

In the matter of:

Show Cause Notice–cum–Notice for Personal Hearing:-

1. Offence of misleading the electricity consumers of the State by publishing wrongful interpretation of the provisions of the UERC (Release of new LT Connections, Enhancement and Reductions of Loads) Regulations, 2013.

2. Contravention of Regulation 7 of UERC (Release of new LT Connections, Enhancement and Reductions of Loads) Regulations, 2013.

In the matter of:

1. S.S Yadav,

Managing Director, UPCL, Dehradun.

2. A.K Agarwal,

Director (Operations), UPCL, Dehradun.

3. H.K Gururani,

Chief Engineer (Distribution), UPCL, Kumaon Zone, Haldwani.

4. Navin Mishra,

Executive Engineer, UPCL, Haldwani (Urban)

5. Nitin Singh Garkhal,

Executive Engineer, UPCL, Ramnagar   ....Respondents

06.09.2016

In the Matter of:

Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence for:

1. Augmentation of 220 kV S/s Roorkee by adding of 220/33 kV, 2x50 MVA Transformers.

2. Increasing Capacity of 132/33 kV S/s Jaspur from 2x40 MVA to 3x40 MVA including

construction of associated 01 No. 132 KV bay and 01 No. 33 kV bay and bisection of 132 kV

& 33 kV Bus.

3. Stringing of Second Circuit of 132 kV D/C Satpuli-Kotdwar Transmission Line.

4. Augmentation of 132/33 kV transformer capacity at 220 kV substation Haldwani from 2x40

MVA to 3x40 MVA including construction of associated 01 no. 132 kV bay and 01 no. 33 kV

bay and extension & bisection of 132 kV & 33 kV bus.

5. Augmentation of 132/33 kV transformer capacity at 132 kV substation Pithoragarh from

2x20 MVA + 2x3x5 MVA to 1x20 MVA + 1x40 MVA + 2x3x5 MVA.

In the Matter of:

Power Transmission Corporation of Uttarakhand Ltd., Vidyut Bhawan, Majra, Dehradun.……Petitioner

06.09.2016

In the Matter of:

Petition filed under Regulation 37(1)of the UERC (Conduct of Business Regulations),

2014, clause 3.2 and 14A of the Transmission license read with section 18 of the Electricity

Act and other relevant provisions of the Electricity Act, 2003 for amending the terms

and condition of the Transmission License of Power Transmission Corporation of

Uttarakhand Ltd.

In the Matter of:

Power Transmission Corporation of Uttarakhand Ltd.,

Vidyut Bhawan, Majra, Dehradun………Petitioner

06.09.2016

In the matter of:

Petition on Relaxation in RE Regulations, 2013 in respect to Sarju-II & Sarju-III SHPs of M/s UBHP Ltd. for restriction of any claim under deemed generation on account of the restraint in evacuation system caused due to allowance of evacuation of power from Sarju-II SHP, till the under constructed 33 kV line between Bageshwar and Kapkote on panther conductor is completed.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of:

M/s Uttar Bharat Hydro Power (P) Ltd. … Respondent

09.08.2016

In the matter of:

Suo-moto proceedings initiated by the Commission in accordance with the Agreement dated 21.11.1972 between Govt. of Himachal Pradesh and Govt. of Uttar Pradesh.

In the matter of:

Uttarakhand Power Corporation Ltd.

UJVN Ltd. … Respondents

09.08.2016

In the matter of:

Application seeking removal of difficulty in implementing the Prepaid Metering system provided in Tariff Order for FY 2016-17 dated 5th April, 2016 and accordingly modifications and deviations in provisions of the said Order.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

Petition: UPCL’s Application seeking removal of difficulty in implementing the Prepaid metering system provided in Tariff Order for FY 2016-17 dated 5th April 2016 and accordingly modifications and deviations in provisions of the said order.

02.08.2016 Daily order

 

Petition:

In the matter of:

Application seeking approval of the Commission on the Model Power Purchase Agreement between Uttarakhand Power Corp. Ltd. & Grid Interactive Rooftop and Small Solar PV Power Plant.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

02.08.2016

In the matter of:

Review petition filed under Regulation 54 of the UERC (Conduct of Business) Regulations, 2014 for review of the Order dated 5th April, 2016 passed by the Commission in the matter of Petition for approval of Business Plan and determination of Multi Year Tariff Petition for Second Control Period 2016-17 to 2018-19, True up of FY 2014-15 and Annual Performance Review for FY 2015-16 of Power Transmission Corporation of Uttarakhand Ltd.

In the matter of:

Power Transmission Corporation of Uttarakhand Ltd. … Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. ... Respondent

21.06.2016

In the matter of:

Petition seeking adjustment of tariff of Vanala Small Hydro Project (15 MW) of M/s Him Urja Pvt. Ltd. as per Section 61 and 62 of the Electricity Act, 2003 read with Regulation 16(3) & 25 of UERC (Tariff and Other Terms for supply of Electricity from RE Sources and Non-fossil fuel based Co-generating Station) Regulations, 2010, as amended from time to time and Regulation 3 & 4 (4) of the UERC (T&C for truing up of Tariff) Regulations, 2008.

In the matter of:

M/s Him Urja Pvt. Ltd. … Petitioner

21.06.2016

In the matter of:

Application seeking prior approval of the Commission on the Draft Power Purchase Agreement for short term between Uttarakhand Power Corp. Ltd. and M/s Tata Power Trading Company Ltd. (TPTCL), M/s PTC India Ltd. & M/s Adani Enterprises Ltd.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

21.06.2016

In the matter of:

Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s Sravanthi Energy Pvt. Ltd.

In the matter of:

M/s Sravanthi Energy Pvt. Ltd. … Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. ... Respondent

21.06.2016

In the matter of:

Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and Sh. Rakesh Kumar.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of:

Sh. Rakesh Kumar ... Respondent

21.06.2016

In the matter of:

Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s Dans Energy Pvt. Ltd.

In the matter of:

Uttarakhand Power Corporation Limited … Petitioner

AND

In the matter of:

M/s Dans Energy Pvt. Ltd. ... Respondent

21.06.2016

In the matter of: Investment approval for Procurement, Erection & Commissioning of 01 No. 40 MVA 132/33 kV Transformer complete with 132 kV & 33 kV Bay for increasing capacity of 132 kV Substation Laksar.

And In the matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) Vidyut Bhawan, Near ISBT Crossing, Saharanpur Road, Majra, Dehradun ........Petitioner

07.06.2016

In the matter of: Petition for prior approval of "Capital Investment for Renovation & Modernization" of Dhakrani (3x11.25 MW) HEP of UJVN Ltd.

And In the matter of: UJVN Ltd. "UJJWAL", Maharani Bhagh, GMS Road, Dehradun …Petitioner

07.06.2016

In the matter of: Investment Approval of Revised DPR for Construction of 132 kV S/C Over head line on Double Circuit Tower from 220 kV S/s SIDCUL Haridwar to 132 kV S/s Jwalapur Haridwar.

And In the matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) Vidyut Bhawan, Near ISBT Crossing, Saharanpur Road, Majra, Dehradun ........Petitioner

07.06.2016

In the matter of: Investment Approval for Balance work of "Diversion of 220 kV Rishikesh-Dharasu and Chamba-Dharasu line in THDC submerged area."

And In the matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) Vidyut Bhawan, Near ISBT Crossing, Saharanpur Road, Majra, Dehradun ........Petitioner

07.06.2016

In the matter of:

Application seeking approval of Hon’ble UERC on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Tata Power Trading Co. Ltd. & M/s Shree Cement Ltd.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of:

M/s Tata Power Trading Co. Ltd. ... Respondent No. 1

M/s Shree Cement Ltd. ... Respondent No. 2

07.06.2016

In the matter of:

Application seeking approval of Hon’ble UERC on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. & Grid Interactive Rooftop & Small Solar PV Plant under Suryodaya Swarozgar Yozna.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of:

Uttarakhand Renewable Energy Development Agency ... Respondent

07.06.2016

In the matter of:

Application seeking approval of Hon’ble UERC on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Avani Bio Energy Pvt. Ltd. (33 kV Grid Sub-station at Kunatta, Pithoragarh, Uttarakhand).

&

Application seeking approval of Hon’ble UERC on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Avani Bio Energy Pvt. Ltd. (33 kV Grid Sub-station at Raiagar, Tripuradevi, Pithoragarh, Uttarakhand).

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of:

M/s Avani Bio Energy Pvt. Ltd. ... Respondent

07.06.2016

In the matter of:

Petition for seeking carry forward of Renewable Purchase Obligation for FY 2015-16 amounting to 699.6 MU (Non-Solar) and 8.1 MU (Solar) as per the provisions of UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of:

Uttarakhand Renewable Energy Development Agency ... Respondent

07.06.2016

In the matter of:

Application seeking approval of Hon’ble UERC on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and UJVN Ltd. (4.5 MW Canal Bank Grid connected Solar PV Plant).

&

Application seeking approval of Hon’ble UERC on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and UJVN Ltd. (1 MW Canal Top Grid connected Solar PV Plant).

&

Application seeking approval of Hon’ble UERC on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and UJVN Ltd. (7.5 MW Canal Bank Grid connected Solar PV Plant).

&

Application seeking approval of Hon’ble UERC on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and UJVN Ltd. (7 MW Canal Bank Grid connected Solar PV Plant).

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of:

UJVN Ltd. ... Respondent

07.06.2016

In the matter of:

Petition under Sections 62 and 86(1)(a) of the Electricity Act, 2003 read with the relevant provisions of UERC (Terms & Conditions for Determination of Tariff) Regulations, 2011, UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations, 2015 for determination of tariff for supply of power from the Petitioner’s 70 MW Hydro - electric power project to UPCL & approval of Business Plan from FY 2016-17 to FY 2018-19.

In the matter of:

M/s Greenko Budhil Hydro Power Pvt. Ltd. … Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. … Respondent

07.06.2016

In the matter of:

Petition to approve the ‘Date of Commercial Operation’ (CoD) of the damaged/non-functional 8 Small Hydro Power Plants (SHPs) on the date when these SHPs will start operating after renovation & modernization works.

In the matter of:

Uttarakhand Renewable Energy Development Agency . … Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. ... Respondent

19.04.2016

In the matter of:

Adjudication of dispute under Section 86(1)(f) between Uttar Bharat Hydro Power Pvt. Ltd. and Uttarakhand Power Corporation Ltd. in respect of 10.5 MW Sarju III Small Hydro Power Project.

In the matter of:

M/s Uttar Bharat Hydro Power Pvt. Ltd.  . … Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. ... Respondent

19.04.2016

In the matter of:

Adjudication of dispute under 86(1)(f) between Uttar Bharat Hydro Power Private Limited and Uttarakhand Power Corporation Limited in respect of 12.6 MW Sarju II Hydro Power Project.

In the matter of:

M/s Uttar Bharat Hydro Power Pvt. Ltd.  . … Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. ... Respondent

19.04.2016

In the matter of:

Construction of 132 kV GIS Substation Araghar and LILO of 132 kV Majra-Laltappar at 132 kV S/s Araghar line through laying of 132 kV Cable.

In the matter of:

Power Transmission Corporation of Uttarakhand Ltd.  . … Petitioner

19.04.2016

In the matter of:

Petition seeking the payment for Deemed Generation of 5 MW Debal Small Hydro Project for the years 2012-13, 2013-14 & 2014-15.

In the matter of:

M/s Chamoli Hydro Power Pvt. Ltd. … Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. ... Respondent

16.03.2016

In the matter of:

Petition seeking approval of the Business Plan U/s 62 & 86 (1)(a) of the Electricity Act, 2003 read with the Regulation 8 of UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations, 2015 and as per Commission’s order dated 20.11.2015 & Determination of tariff for supply of power from the Petitioner’s 70 MW Hydro–electric power project to UPCL.

And

In the matter of:

M/s Greenko Budhil Hydro Power Pvt. Ltd.  ...Petitioner

And

In the matter of:

Uttarakhand Power Corporation Ltd.   ... Respondent

26.02.2016

In the matter of:

Petition to extent the benchmark capital cost and generic tariff as declared by UERC vide its order dated 23.07.2015, i.e. upto 30 Oct., 2016 for 23 Solar PV Power Plants (cumulative capacity 181.40 MW).

And

In the matter of:

Uttarakhand Renewable Energy Development Agency ...Petitioner

And

In the matter of:

Uttarakhand Power Corporation Ltd.  ... Respondent

26.02.2016

In the matter of:

Suo-Moto proceedings on non-compliance of Renewable Purchase Obligation (RPO) by UPCL in accordance with UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010 & UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2013.

And

In the matter of:

1. Sh. S.K. Tamta,

Chief Engineer Level-1 (Comml.),

Uttarakhand Power Corporation Ltd.

Dehradun.

2. Sh. A.K. Singh,

Chief Engineer (Pro. & Comml.),

Uttarakhand Power Corporation Ltd.

Dehradun.

3. Sh. Sunil Vaid,

Suprerintending Engineer (Comml.),

Uttarakhand Power Corporation Ltd.,

Dehradun.

4. Sh. Pravesh Kumar,

Executive Engineer (Comml.),

Uttarakhand Power Corporation Ltd.,

Dehradun.

5. Sh. Munish Chandra,

Executive Engineer (Attached to MD),

Uttarakhand Power Corporation Ltd.,

Dehradun.

6. Ms. Sandhya Ojha,

Assistant Engineer (Comml.),

Uttarakhand Power Corporation Ltd.,

Dehradun.

                     ... Respondents

26.02.2016

In the matter of:

Investment Approval for Projects covering the construction of 16 Nos. 33/11 kV substation and their associated lines of 131.34 Km.

And

In the matter of:

Uttarakhand Power Corporaton Ltd. (UPCL) Victoria Cross Vijeta Gabar Singh Bhawan, Kanwali Road, Dehradun. …....Petitioner

19.01.2016

In the matter of:

Petition for determination of levelised tariff for Rooftop and Small Solar PV Power Plant as per the revised subsidy.

In the matter of:

Uttarakhand Renewable Energy Development Agency … Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. ... Respondent

19.01.2016

In the matter of:

Application seeking approval of UERC on the Draft Power Purchase Agreement between UPCL & Gamma Infraprop (P) Ltd.

In the matter of:

Uttarakhand Power Corporation Ltd. …Petitioner

M/s Gamma Infraprop (P) Ltd.  ...Respondent No. 1

Power Transmission Corporation of Uttarakhand Limited  ...Respondent No. 2

08.01.2016

In the matter of:

Petition under Section 62 & Section 86(1)(a) of the Electricity Act, 2003, read with the UERC (Terms & Conditions for Determination of Tariff) Regulations, 2011 and UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations, 2015 for determination of tariff for FY 2015- 16 & for the control period from FY 2016-17 till FY 2018-19 for supply of power to UPCL from 214 MW Gas based Kashipur Combined Cycle Power Plant of Gama Infraprop Pvt. Ltd. At Mahukhedaganj, Kashipur, Dist. Udhamsingh Nagar.

In the matter of:

M/s Gamma Infraprop (P) Ltd.  …Petitioner

Uttarakhand Power Corporation Ltd. ...Respondent No. 1

Power Transmission Corporation of Uttarakhand Limited  ...Respondent No. 2

08.01.2016

In the matter of:

Application seeking approval of UERC on the Draft Power Purchase Agreement between UPCL & Selected bidders for setting of Grid Connected Solar PV Power Projects.

In the matter of:

Uttarakhand Power Corporation Ltd. …Petitioner

Uttarakhand Renewable Energy Development Agency  ...Respondent

08.01.2016
2015

In the matter of:

Suo-Moto proceedings on non-compliance of Renewable Purchase Obligation (RPO) by UPCL in accordance with UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010 & UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2013.

In the matter of:

Uttarakhand Power Corporation Ltd. …Respondent

08.12.2015

In the matter of:

Petition for seeking carry forward of Renewable Purchase Obligation of FY 2014-15 amounting to 526.8 MU (Non-Solar) and 2.5 MU (Solar) as per the provisions of UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010.

In the matter of:

Uttarakhand Power Corporation Ltd. …Petitioner

AND

In the matter of:

Uttarakhand Renewable Energy Development Agency ...Respondent

08.12.2015

In the Matter of: Petition filed under Regulation 27(2) and 41 of the UERC (Terms and Conditions of Intra-State Open Access) Regulations, 2015 read with Regulations 59 of UERC (Conduct of Business) Regulations, 2014 for seeking approval for fixing the cost of ABT check meters.

And

 In the matter of: Uttarakhand Power Corporation Ltd. (UPCL) …..…Petitioner

&

1. M/s BST Textile Mills Pvt. Ltd., Udham Singh Nagar

2. M/s Rukmani Iron Pvt. Ltd., Haridwar

3. M/s Alps Industries Ltd., Haridwar …..… Respondents

08.12.2015

In the matter of: Investment Approval for increasing capacity of 220 kV Sub-station Chamba from 2x25 MVA (220/33kV) to 1x50 MVA +1x25 MVA (220/33 kV).

And

In the matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) ....Petitioner Vidyut Bhawan, Near ISBT Crossing, Saharanpur Road, Majra, Dehradun

08.12.2015

In the matter of:

Petition under Sections 62 and 86(1)(a) of the Electricity Act, 2003 read with the relevant provisions of UERC (Terms & Conditions for Determination of Tariff) Regulations, 2011, UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations, 2015 for determination of tariff for supply of power from the Petitioner’s 70 MW Hydro - electric power project to UPCL.

In the matter of:

M/s Greenko Budhil Hydro Power Pvt. Ltd. … Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. … Respondent

20.11.2015

In the matter of: Prior approval of ‘Capital Investment for Renovation & Modernization’ of Dhalipur (3x17 MW) HEP of UJVN Ltd. And

 In the matter of: UJVN Ltd. ....Petitioner "UJJWAL", Maharani Bhagh, GMS Road, Dehradun

17.11.2015

In the matter of: Petition for review of the Hon’ble UERC’s order dated 30.07.2015 on "Petition for prior approval of Capital Investment for Renovation & Modernization of 3 x 30 MW MB-I HEP of UJVN Ltd". And

 In the matter of: UJVN Ltd., Dehradun ……...Petitioner

17.11.2015

In the matter of: System strengthening of 132 kV S/s Kichha Comprising of:

a. Augmentation of 132/33 kV transformer capacity at 132 kV S/s Kichha from 2x40 MVA to 3x40 MVA including construction of associated 01 no. 132 kV bay and 01 no. 33 kV bay and bisection of 33 kV main bus.

b. Construction of 01 no. Bus Coupler bay using hybrid switchgear and bisection of existing 132 kV main bus.

c. Proposal for ampacity increment of 132 kV Pantnagar-Rudrapur circuit (7.6 Kms.) by replacing for existing ACSR Panther conductor with high capacity ACCC Casablanca conductor.

And In the matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) ....Petitioner Vidyut Bhawan, Near ISBT Crossing, Saharanpur Road, Majra, Dehradun

17.11.2015

In the matter of: Investment Approval for Augmentation of Transformer capacity of 132 kV substation Bhupatwala Haridwar from 2x40 MVA to 3x40 MVA by procurement, erection & commissioning of 01 No. 132/33 kV 40 MVA Transformer and construction of 03 Nos. 33 kV Bays at 132 kV substation Bhupatwala Haridwar. And

 In the matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) ....Petitioner Vidyut Bhawan, Near ISBT Crossing, Saharanpur Road, Majra, Dehradun

17.11.2015

In the matter of: Investment Approval for Augmentation of 220 kV Substation Jhajhra from 2x40 MVA to 2x80 MVA. And

In the matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) ....Petitioner Vidyut Bhawan, Near ISBT Crossing, Saharanpur Road, Majra, Dehradun

17.11.2015

In the matter of: Investment Approval for Increasing capacity of 220 kV Substation Virbhadra Rishikesh from 2x160 MVA (220/132 kV) to 3x160 MVA (132/33 kV). And

 In the matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) ....Petitioner Vidyut Bhawan, Near ISBT Crossing, Saharanpur Road, Majra, Dehradun

17.11.2015

In the matter of: Petition for Review of the UERC’s Order dated 11.04.2015 on "True-up of FY 2013-14, Annual Performance Review for FY 2014-15 and Annual Fixed Charges for FY 2015-16 for UJVN Ltd". And

In the matter of: UJVN Ltd. Dehradun …..Petitioner &

1. Uttarakhand Power Corporation Ltd. (UPCL)

2. Himachal Pradesh State Electricity Board Ltd. (HPSEB Ltd.)

Vidyut Bhawan, Kumar House, Shimla (H.P.) …..Respondents

17.11.2015

In the matter of: Review filed by UJVN Ltd. on Commission’s Order dated 13.03.2015 issued in the matter of prior approval of Capital Investment for Renovation & Modernization of 3x10 MW Kulhal HEP. And

In the matter of: UJVN Ltd. …....Petitioner

17.11.2015

In the matter of:

Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2015 to 31.12.2015.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

17.11.2015

In the matter of:

Application seeking approval of UERC on the Draft Power Purchase Agreement between UPCL & M/s Greenko Budhil Hydro Power Pvt. Ltd.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of:

M/s Greenko Budhil Hydro Power Pvt. Ltd. … Respondent

15.10.2015

In the matter of:

Application seeking approval of the Commission on the Draft Power Purchase Agreement between UPCL & M/s GMR Chhattisgarh Energy Ltd.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of:

M/s GMR Chhattisgarh Energy Ltd. … Respondent

15.10.2015

In the matter of:

Petition seeking the approval of the Commission for advance banking of power by the UPCL from Haryana Power Purchase Centre/Northern Region Utility, through a trader.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

24.09.2015

In the matter of:

Petitions filed under section 61 and 86 of the Electricity Act, 2003 read with the relevant regulations and guidelines of the Commission by UJVN Ltd. for approval of Capital investment for:

1. Special Repair Works of Civil & Hydro Mechanical Structures for Yamuna Hydel Scheme Stage-I, II Part-I & IV

2. Refurbishing of Ichari Dam

3. Refurbishing of Dakpathar Barrage

4. Refurbishing of Asan Barrage

And

In the matter of:

UJVN Limited …Petitioner

&

Uttarakhand Power Corporation Ltd. (UPCL) … Respondent No. 1

Himachal Pradesh State Electricity Board Ltd. (HPSEBL) … Respondent No. 2

Vidyut Bhawan, Kumar House, Shimla, (H.P.)

22.09.2015

In the matter of:

Petition filed under Regulation 27(2) and 41 of the UERC (Terms and Conditions of Intra-state open access) Regulations, 2015 read with Regulation 59 of UERC (Conduct of Business) Regulations,2014 for seeking approval for fixing the cost of ABT Check Meter.

And

In the matter of:

Uttarakhand Power Corporation Limited (UPCL) ....Petitioner

22.09.2015

In the matter of:

Petition seeking adjustment of Tariff for Motighat SHP (5 MW) due to Additional Capitalization incurred on account of damages due to natural calamity as per UERC Tariff Regulations, 2010.

In the matter of:

M/s Himalaya Hydro Pvt. Ltd. … Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. ... Respondent

22.09.2015

In the matter of:

Application seeking approval of the Commission on the Power Purchase Agreement between UPCL and Generators.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

1. M/s Parvatiya Power Pvt. Ltd.

2. M/s S.R. Solar Energy Park.

3. M/s Om Prakash Agarwal.

4. M/s S.K. Solar Power.

5. M/s Raj Kumar.

6. Shri Ubedur Rehaman-proprietor USA Solar Systems.

7. M/s Sourabh Arora.

8. M/s Ashok Aneja.

9. M/s Anil Kumar Gupta.

10. M/s UJVN Ltd.

11. M/s KLA Foods India Ltd.

12. M/s Puran Chand.

13. M/s Dovetail Woodcrafters Pvt. Ltd. ... Respondents

22.09.2015

In the matter of:

Petition under "UERC (RE) Regulations, 2008" for relief against excess rebate deduction from payment of monthly energy bill of M/s RBNS Sugar Mills Ltd., Laksar, Haridwar by UPCL.

&

Petition under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of the disputes between M/s Swasti Power Ltd. and Uttarakhand Power Corp. Ltd. arising out of the Power Purchase Agreement dated 03.07.2009.

In the matter of:

M/s Rai Bahadur Narain Singh Sugar Mills Ltd.

M/s Swasti Power Ltd. ….. Petitioners

And

In the matter of:

Uttarakhand Power Corporation Ltd. ..... Respondent

18.08.2015

In the matter of:

Application seeking approval of the Fuel Charge Adjustment (FCA) for the quarter ending June, 2015 and to adjust the same in the FCA computation for the quarter ending September, 2015.

AND

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

18.08.2015

In the matter of:

Petition under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of the

disputes between M/s Swasti Power Ltd. and Uttarakhand Power Corporation Ltd. arising out of the Power Purchase Agreement dated 03.07.2009 being the loss suffered by the Petitioner on account of frequent outages and inadequate transmission line capacity for evacuation of power from the project.

And

In the matter of:

M/s Swasti Power Limited ....Petitioner

111, Road No. 72, Jubilee Hills, Hyderabad

&

In the matter of:

Uttarakhand Power Corporation Limited (UPCL) ....Respondent 1

Victoria Cross Vijeta Gabar Singh Bhawan, Kanwali Road,

Balliwala Chowk, Dehradun

Power Transmission Corporation of Uttarakhand Limited (PTCUL)..Respondent 2

Vidyut Bhawan, Near ISBT Crossing, Saharanpur Road,

Majra, Dehradun

18.08.2015

In the Matter of:

Investment approval for strengthening of 132 kV network (A) Extension of 220

kV substation Piran Kaliyar (B) Construction of 132 kV LILO of Bhagwanpur-

Chudiyala.

And

In the Matter of:

Power Transmission Corporation of Uttarakhand Limited (PTCUL).. Petitioner

04.08.2015

In the Matter of:

Investment approval for construction of 220 kV Pirankaliyar-Puhana (PGCIL)

Line.

And

In the Matter of:

Power Transmission Corporation of Uttarakhand Limited (PTCUL….. Petitioner

04.08.2015

In the Matter of:

Revision filed under Rule 3 Sub-Rule (3) of The Work of Licensee Rule 2006 on the Order dated 02.05.2015 issued by the District Magistrate Udhamsingh Nagar (Uttarakhand), under Rule 3 Sub-Rule 2 of The Work of Licensee Rules, 2006 on the representation of Mr. Suresh Kumar Mittal.

And

In the Matter of:

1. Uttarakhand Power Corporation Ltd., Urja Bhawan, Kanwali Road, Dehradun, Uttarakhand, through its Director (Projects).

2. Executive Engineer (UPCL), EDD, Sitarganj, District-Udhamsingh Nagar, Uttarakhand

….....…….. Revisionists/Petitioners

&

1. District Magistrate/Collector, District-Udhamsingh Nagar, Uttarakhand

2. Suresh Kumar Mittal S/o Late Sh. Mangatram, R/o Ward No. 4, Khatima, Tehsil Khatima, District Udhamsingh Nagar.……….. Respondents

30.07.2015

In the matter of:

Compliance of Commission’s orders dated 07.11.2014 and 10.02.2015 in the matter of approval of Power Purchase Agreements between UPCL and Generators.

In the matter of:

Uttarakhand Power Corporation Ltd. … Applicant

AND

1. M/s Metro Frozen Fruits & Vegetables Pvt. Ltd.

2. M/s Uttam Sugar Mills Ltd.

3. M/s Gunsola Hydro Power Generation (Pvt.) Ltd.

4. M/s RV Akash Ganga Infrastructure Ltd.

5. M/s Jay Ace Technologies Ltd.

6. M/s Regency Aquaelectro & Motelresorts Ltd.

7. M/s Himalaya Hydro Pvt. Ltd. .. Respondents

23.07.2015

In the matter of:

Application seeking approval of the Commission on the PPAs between UPCL and 08 nos. Generators.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

1. M/s R.C. Energy

2. M/s Purshotam Industries Ltd.

3. M/s Purshotam Ispat

4. M/s Vivan Solar Pvt. Ltd.

5. M/s Uttar Bharat Hydro Pvt. Ltd.

6. M/s Root Hydrocarbons Ltd.

7. M/s Madhav Infra Projects Ltd.

8. UJVN Ltd. ... Respondents

AND

Misc. Appl. Nos. 31/2015 to 34/2015

In the matter of:

Application seeking approval of the Commission on the PPAs between UPCL and 04 nos. Generators.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

1. M/s Eastman International

2. M/s Advika Energies Pvt. Ltd.

3. M/s Redwoods Infrastructure Pvt. Ltd.

4. UJVN Ltd. ... Respondents

23.07.2015

In the matter of:

Grid connectivity for 12.6 MW SHP of M/s Uttar Bharat Hydro Power Pvt. Ltd., New Delhi(Suo-moto).

And

In the matter of:

Uttarakhand Power Corporation Limited (UPCL) ....Respondent 1

M/s Uttar Bharat Hydro Power Pvt. Ltd. ….Respondent 2

02.07.2015

In the matter of:

Petition under Section 30, 42(2), 42(3) and 86(1)(c) of the Electricity Act, 2003 read with Regulation 41 of Uttarakhand Electricity Regulatory Commission (Terms and Conditions of Intra-state Open Access) Regulations, 2015 for removal of difficulty in giving effect to the provisions regarding grant of Open Access to the Petitioner.

And

In the matter of:

M/s Shree Cement Limited.

Akbarpur Oud, Laksar, District-Haridwar, Uttarakhand ....Petitioner

&

In the matter of:

Uttarakhand Power Corporation Limited (UPCL) ....Respondent 1

State Load Dispatch Centre (SLDC) ....Respondent 2

02.07.2015

In the matter of:

Implementation of Retail Tariff Order issued by the Commission on 11.04.2015.

AND

In the matter of:

Uttarakhand Power Corporation Ltd. … Applicant

02.06.2015

In the matter of:

Petition seeking extension of generic tariff prescribed under the UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2013 till August 31, 2015 and seeking framing of procedure for promotion of solar plants.

In the matter of:

M/s Amplus Infrastructure Developers Pvt. Ltd.

M/s Avant Garde Power Solutions Pvt. Ltd.

M/s Rishabh Renergy Pvt. Ltd. … Applicants

AND

In the matter of:

Uttarakhand Power Corporation Ltd.

Uttarakhand Renewable Energy Development Agency (UREDA) ... Respondents

02.06.2015

In the matter of:

Misc. Petition under "UERC (Tariff & Other Terms for Supply of Electricity from NRE Sources) Regulation 2008" for relief against Excess Rebate deduction from payment of Monthly Energy Bill by the UPCL.

In the matter of:

M/s Rai Bahadur Narain Singh Sugar Mills Ltd. … Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. … Respondent

12.05.2015

In the matter of:

Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01-04-2015 to 30-06-2015.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

12.05.2015

In the matter of:

Determination of project specific tariff for 10.5 MW Small Hydro Power Project on Sarju River at Kapkot, Bageshwar District, Uttarakhand under Sections 62 and 86 of the Electricity Act, 2003 read with Regulation 13 of Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Non-conventional and Renewable Energy Sources) Regulations, 2013.

In the matter of:

M/s Uttar Bharat Hydro Power Pvt. Ltd. … Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. ... Respondent

07.04.2015

In the matter of:

Petition under Section 86 (1) (f) of the Electricity Act, 2003, for adjudication of the disputes between M/s Swasti Power Ltd and Uttarakhand Power Corporation Ltd. arising out of the Power Purchase Agreement dated 03.07.2009 being the loss suffered by the petitioner on account of frequent outages and inadequate transmission line capacity for evacuation of power from the project.

In the matter of:

M/s Swasti Power Ltd. … Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. ... Respondent-I

Power Transmission Corporation of Uttarakhand Ltd. … Respondent-II

07.04.2015

In the matter of:

Prior approval of “Capital Investment for Renovation & Modernization of 4 x 36 MW Chilla HEP” of UJVN Ltd. under Section 61 and 86 of the Electricity Act, 2003 read with the relevant regulations and guidelines of the Hon’ble Commission.

And

In the matter of:

Managing Director, UJVN Ltd., ....Petitioner.

“UJJWAL”, Maharani Bagh, G.M.S. Road, Dehradun.

07.04.2015

In the matter of:

Misc. App. No. 02 of 2015

1) Investment Approval for construction of 1. (2x25 MVA), 220/33 kV S/s Barham (Jauljivi) and 2. Construction of LILO line of one circuit 220 kV Dhauliganga-Pithoragarh (PGCIL) line at proposed (2x25 MVA), 220/33 kV S/s Barham (Jauljivi)

Misc. App. No. 03 of 2015

2) Investment approval for increasing capacity of 132/33 kV S/s Jwalapur from 2x40 MVA to 3x40 MVA.

Power Transmission Corporation of Uttarakhand Ltd. (PTCUL). ...Petitioner

06.02.2015

In the matter of: Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.01.2015 to 31.03.2015.

In the matter of: Uttarakhand Power Corporation Ltd. … Petitioner

04.02.2015

In the matter of: Petition under Section 86(1)(F) of the Electricity Act, 2003 for adjudication of the disputes between M/s Swasti Power Ltd. and Uttarakhand Power Corp. Ltd. arising out of the Power Purchase Agreement dated 03.07.2009. In the matter of: M/s Swasti Power Ltd. … Applicant

21.01.2015

In the Matter of:

Petition seeking waiver and refund of penalty imposed by the Commission vide its Order dated 01.09.2005.

AND

In the Matter of:

Uttarakhand Power Corporation Limited,

Urja Bhawan, Kanwali Road, Dehradun …Petitioner

21.01.2015

In the matter of:

(i) Increasing capacity of 220 kV sub-station SIDCUL, Haridwar from 2x80 MVA (132/33 kV) to 2x80 MVA (132/33 KV) + 1x50 MVA (220/33 KV).

(ii) Construction of 132 kV overhead line from 220 kV sub-station SIDCUL Haridwar to 132/33 kV sub-station Jwalapur.

(iii) Construction of 132/33 kV sub-station Chudiyala 2x40 MVA and its line, construction of 6 nos. 132 kV bays and 05 nos. 33 kV bays at Chudiyala.

(iv) Construction of colony at 132 kV sub-station Majra Campus Dehradun.

Power Transmission Corporation of Uttarakhand Ltd. (PTCUL). ...Petitioner

20.01.2015

In the matter of:

Petition filed by M/s Bhilangana Hydro Power Ltd. for indemnification on account of loss caused due to delay in commissioning of transmission/evacuation system and the breach of the provisions of the transmission services agreements.

M/s Bhilangana Hydro Power Ltd. (BHPL). ...Petitioner

And

Power Transmission Corporation of Uttarakhand Ltd. (PTCUL). ...Respondent

19.01.2015

In the matter of:

Dispute between UJVN Ltd. and Uttarakhand Power Corporation Limited (UPCL) relating to payments.

And

In the matter of:

Managing Director, UJVN Ltd., ....Petitioner

"UJJWAL", Maharani Bagh, G.M.S. Road, Dehradun

&

Managing Director, Uttarakhand Power Corporation Limited (UPCL) .... Respondent

Victoria Cross Vijeta Gabar Singh Bhawan, Kanwali Road, Dehradun

09.01.2015

In the matter of: Applications seeking approval of UERC on the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and Himalaya Hydro Pvt. Ltd., Regency Yamuna Energy Ltd. & Regency Aquaelectro & Motelresorts Ltd.

AND

 In the matter of: Uttarakhand Power Corporation Ltd. ... Petitioner

AND

 In the matter of:

M/s Himalaya Hydro Pvt. Ltd.

 M/s Regency Yamuna Energy Ltd.

 M/s Regency Aquaelectro & Motelresorts Ltd. … Respondents

09.01.2015

2014

In the matter of:

Filing of petition for re-determination of Generic Tariff for Pathri Small Hydro Generating Station (3x6.8 MW) & Mohammadpur Small Hydro Generating Station (3x3.1 MW) of UJVN Ltd. under Section 62, 86 and 94(1)(f) of the Electricity Act, 2003 read with the relevant Regulations, Orders and Guidelines of the Commission.

AND

In the matter of:

UJVN Ltd. … Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. ... Respondent

22.12.2014

In the matter of:

Petition under Section 86(1)(f) read with Section 142 of the Electricity Act, 2003 for Recovery of deemed generation charges from UPCL for the Financial Year 2012-2013 and Financial Year 2013-2014 in accordance with Regulation 44 of UERC(Tariff and Other Terms for Supply of Electricity from Non-conventional and Renewable Energy Sources) (First Amendment) Regulations, 2012.

AND

In the matter of:

M/s Birahi Ganga Hydro Power Ltd. … Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. ... Respondent

22.12.2014

In the matter of: Proceeding initiated in the Commission’s Order dated 08.07.2014 under section 142 of the Electricity Act, 2003 for non-compliance of the provisions of the section 67 & 68 of the Electricity Act, 2003 in the matter of M/s Birla Tyres, Unit II, Khedimubarakpur, Laksar Haridwar.

And

In the matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) .... Respondent

27.11.2014

In the matter of:

Petition to wave the token Penalty of Rs. 10,000/- imposed under Section 142 of the Electricity

Act, 2003 for non compliance, vide Order dated 9th September, 2014 passed by Hon’ble

Commission in the matter of Notice issued to MD, UPCL under Section 142 of the Electricity

Act, 2003 in the matter of non-compliance of the Commission’s Order dated 24.06.2014 on the

Review Petition filed by UPCL on Commission’s Order dated 05.05.2014 on the application

seeking approval of releasing additional 6 MVA load(Total of 20MVA) on supply voltage of 33

kv to M/s Birla Tyres, Unit-II, Khedimubarakpur, Laksar, Haridwar.

And

In the matter of:

Managing Director, Uttarakhand Power Corporation Limited (UPCL).... Petitioner

27.11.2014

In the matter of:

Petition with regard to Investment Approval for construction of well foundations and tower protection works at different locations of 220 kV DC Twin Zebra transmission line from 220 kV S/s Dehradun (PTCUL) to 400 kV S/s Sherpur, Dehradun of PGCIL.

Power Transmission Corporation of Uttarakhand Limited (PTCUL) ...Petitioner

27.11.2014

In the Matter of:

Petition seeking waiver and refund of penalty imposed by the Commission vide its Order dated 01.09.2005.

AND

In the Matter of:

Uttarakhand Power Corporation Limited, Urja Bhawan, Kanwali Road, Dehradun …Petitioner

27.11.2014

In the matter of:

Petition seeking approval for the Investment on Dehradun Project covering the woks covered under Part-B of R-APDRP of MoP, GoI for reduction of AT&C losses to the extent of 15%.

And

In the matter of:

Uttarakhand Power Corporation Limited (UPCL) .... Petitioner

14.10.2014

In the matter of:

Petition seeking approval for Investment on SCADA/DMS Project of Dehradun town covered under Part-A of R-APDRP of MoP GoI.

And

In the matter of:

Uttarakhand Power Corporation Limited (UPCL) .... Petitioner

14.10.2014

In the matter of:

Petition for in-principle approval of Capital Expenditure for Balance Capital Works of 4x76 MW MB-II HEP of UJVN Ltd.

And

In the matter of:

UJVN Limited .... Petitioner

14.10.2014

In the matter of:

Petition for prior approval of Capital investment for Renovation & Modernization of MB-I (3x30 MW) HEP of UJVN Ltd.

And

In the matter of:

UJVN Limited .... Petitioner

14.10.2014

In the matter of:

Show cause notices dated 28.07.2014 issued to Sh. Kamal Kant, Chief Engineer (C&R) & Sh. A.K. Agarwal, Superintending Engineer (Engg.), PTCUL.

In the matter of:

1. Sh. Kamal Kant, Chief Engineer (C&R), PTCUL

2. Sh. A.K. Agarwal, Superintending Engineer (Engg.), PTCUL …Respondents

14.10.2014

In the matter of:

Application seeking review of the Tariff Order issued by the Hon’ble Commission on 10.04.2014 on the Annual Performance Review and Tariff petition of UPCL for F.Y. 2014-2015.

In the matter of:

Uttarakhand Power Corporation Ltd. ... Petitioner

14.10.2014

In the matter of:

Petition seeking amendments in the PPA dated 30.11.2010 executed between Birahi Ganga Hydro Power Ltd. and UPCL in accordance with the provisions of UERC (Tariff and Other Terms for Supply of Electricity from Non-conventional and Renewable Energy Sources) Regulations, 2010, Removal of Difficulty (First) Order, 2010 and CERC (Terms and Conditions of Tariff) Regulations, 2014.

In the matter of:

M/s Birahi Ganga Hydro Power Ltd. … Petitioner

AND

Uttarakhand Power Corporation Ltd. ... Respondent

AND

Petition No. 21 of 2014

In the matter of:

Uttarakhand Power Corporation Ltd. ... Petitioner

AND

1. M/s Metro Frozen Fruits & Vegetables Pvt. Ltd ... Respondents

2. M/s Birahi Ganga Hydro Power Ltd.

3. M/s Gunsola Hydro Power Generation (Pvt.) Ltd.

4. M/s Chamoli Hydro Power Pvt. Ltd.

5. M/s Swasti Power Ltd.

6. M/s Rai Bhadur Narain Singh Sugar Mills Ltd.

7. M/s Rishiganga Power Corporation Ltd.

8. M/s RV Akash Ganga Infrastructure Ltd.

9. M/s Uttam Sugar Mills Ltd.

10. M/s Lakshmi Sugar Mills Co. Ltd.

11. M/s Jay Ace Technologies Ltd.

13.10.2014

In the matter of:

1. Petition for approval of Capital investment for Refurbishing of Asan Barrage of UJVN Ltd. under section 61 and 86 of the Electricity Act, 2003 read with the relevant regulations and guidelines of the Commission.

2. Petition for approval of Capital investment for Refurbishing of Dakpathar

Barrage of UJVN Ltd. under section 61 and 86 of the Electricity Act, 2003 read with the relevant regulations and guidelines of the Commission.

3. Petition for approval of Capital investment for Special Repair Works of Civil & Hydro Mechanical Structures for Yamuna Hydel Scheme Stage-I, II Part-I & IV of UJVN Ltd. under section 61 and 86 of the Electricity Act, 2003 read with the relevant regulations and guidelines of the Commission.

4. Petition for approval of Capital investment for Refurbishing of Ichari Dam of UJVN Ltd. under section 61 and 86 of the Electricity Act, 2003 read with the relevant regulations and guidelines of the Commission.

And

In the matter of:

UJVN Limited .... Petitioner

01.10.2014

In the matter of:

Application seeking approval of Hon’ble UERC for the investment on the projects covering the construction of 14 No. 33/11 kV Substation and their associated lines of 113.70 Km.

And

In the matter of:

Uttarakhand Power Corporation Limited (UPCL) .... Petitioner

24.09.2014

In the matter of:

Suo-moto proceedings initiated by the Commission for non-issuance of NOC by UPCL for Open Access.

AND

In the matter of:

Petition filed by M/s Kashi Vishwanath Steel Ltd, Narain Nagar Industrial Estate, Kashipur with regard to removal of difficulty under Regulation 58 of UERC (Terms and Condition of Intra-State Open Access) Regulations, 2010. ....Petitioner

And

Uttarakhand Power Corporation Ltd. (UPCL). ...Respondent

12.09.2014

In the matter of:

Notice under section 142 of the Electricity Act, 2003 in the matter of non-compliance of the provisions of Section 67 read with Section 12 of the Indian Electricity Act, 1910, 68 & 164 of the Electricity Act, 2003 (in the matter of M/s Gold Plus).

And

In the matter of:

Managing Director,                                                                                             .... Respondent

Power Transmission Corporation of Uttarakhand Limited (PTCUL)

12.09.2014

In the Matter of: Revision filed under Rule 3 Sub-Rule (3) of The Work of Licensee Rule 2006 on the Order dated 20.05.2014 issued by the District Magistrate Udhamsingh Nagar (Uttarakhand), under Rule 3 Sub-Rule 2 of The Work of Licensee Rules, 2006 on the representation of Mr. Suresh Kumar Mittal.
And
In the Matter of:
1) Uttarakhand Power Corporation Ltd., Urja Bhawan, Kanwali Road, Dehradun, Uttarakhand, through its Managing Director. 2) Executive Engineer (UPCL), EDD, Sitarganj, District-Udhamsingh Nagar, Uttarakhand ... Petitioner

And

1) District Magistrate/Collector, District-Udhamsingh Nagar, Uttarakhand 2) Sh. Suresh Kumar Mittal S/o Late Sh. Mangatram, R/o Ward No. 4, Khatima, Tehsil Khatima, District Udhamsingh Nagar. … Respondents

02.09.2014
 In the matter of :
Application seeking review of the Tariff Order issued by the Hon’ble Commission on 10.04.2014 on the Annual Performance Review and Tariff petition of UPCL for F.Y. 2014-2015.

In the Matter of :
Uttarakhand Power Corporation Limited ….. Petitioner
 
19.08.2014

In the matter of:

Review petition filed under regulation 68 of the UERC(Conduct of Business Regulations,2004 for review of the order dated April10, 2014 passed by the UERC with respect to determination of tariff of M/s Him Urja Pvt. Ltd.’s Vanala Small Hydro Project of 15 MW Capacity

In the Matter of:

Uttarakhand Power Corporation Limited Petitioner

And

In the Matter of:

M/s Him Urja Pvt. Ltd. Respondent

19.08.2014

In the matter of

Petition for clarification on various issues for implementation of “Uttarakhand Grid Interacted Rooftop and Small SPV Power Plants Scheme”.
In the matter of:

Uttarakhand Renewable Energy Development Agency … Petitioner
AND
In the matter of:

Uttarakhand Power Corporation Ltd. ... Respondent

14.08.2014

In the matter of

Notice issued to MD, UPCL under Section 142 of the Electricity Act, 2003 in the matter of

non-compliance of the Commission’s Order dated 24.06.2014 on the Review Petition filed by UPCL on Commission’s Order dated 05.05.2014 on the application seeking approval of releasing additional 6 MVA load (Total of 20 MVA) on supply voltage of 33 kV to M/s BirlaTyres, Unit-II, Khedimubarakpur, Laksar, Haridwar.

And

In the matter of:

Managing Director, Uttarakhand Power Corporation Limited (UPCL) .... Respondent

12.08.2014

In the matter of

Notice issued to MD, UPCL under Section 43(3) of the Electricity Act, 2003 in the matter of violation of the provisions of section 43(1) of the Electricity Act, 2003

& Inordinate delay in release of additional 10 MVA load to M/s Birla Tyres, Unit-II,

Khedimubarakpur, Laksar, Haridwar.

And

In the matter of:

Managing Director, Uttarakhand Power Corporation Limited (UPCL) .... Respondent

12.08.2014

In the matter of:

Petition for seeking carry forward of Renewable Purchase Obligation for FY 2013-14 amounting to 387.68 MU (Non-Solar) and 1.08 MU (Solar) as per the provisions of UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010.

AND

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

12.08.2014

 

In the matter of:

Application seeking approval of UERC on the wrongful & impugned decision by Uttarakhand Power Corporation Ltd. (UPCL) regarding cost sharing of Rajstar/Gangani Sub Station as per MoU signed by UPCL & Regency Gangani Energy Pvt. Ltd. on 23rd July, 2009.

AND

In the matter of:

M/s Regency Gangani Energy Pvt. Ltd. … Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. ... Respondent

12.08.2014

In the matter of:

Petition seeking amendments in the PPA dated 30.11.2010 executed between Birahi Ganga Hydro Power Ltd. And UPCL in accordance with the provisions of UERC (Tariff and other Terms for Supply of Electricity from Non-Conventional and Renewable Energy sources) Regulations,2010, Removal of difficulty (First) Order 2010 and CERC (Terms and Conditions of Tariff) Regulations 2014.

AND

In the matter of:

M/s Birahi Ganga Hydro Power Ltd. … Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. ... Respondent

12.08.2014

In the matter of:

Application seeking post facto approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01-07-2014 to 30-09-2014.

AND In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

28.07.2014

In the matter of:

Petition for seeking carry forward of Renewable Purchase Obligation for FY 2013-14 amounting to 387.68 MU (Non-Solar) and 1.08 MU (Solar) as per the provisions of UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010.

AND

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of:

Uttarakhand Renewable Energy Development Agency ... Respondent

24.07.2014

In the matter of:

Application seeking approval of UERC on the wrongful & impugned decision by Uttarakhand Power Corporation Ltd. (UPCL) regarding cost sharing of Rajstar/Gangani Sub Station as per MoU signed by UPCL & Regency Gangani Energy Pvt. Ltd. on 23rd July, 2009.

AND

In the matter of:

M/s Regency Gangani Energy Pvt. Ltd. … Petitioner

AND

Uttarakhand Power Corporation Ltd. ... Respondent

15.07.2014

In the matter of:

Application seeking approval of Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation and M/s Regency Yamuna Energy Ltd. for Badyar SHP. AND

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of:

M/s Regency Gangani Energy Pvt. Ltd. ... Respondent

15.07.2014

In the matter of:

Application under Section 42(2) of the Electricity Act, 2003 read with Regulation 58 of the UERC (Terms and Conditions of Intra-State Open Access) Regulations, 2010 for clarification on the aspect of payment for under-drawal.

AND

In the matter of:

Shree Cement Ltd. Bangur Nagar, Post Box No. 33, Beawar-305901 (Raj) ...Petitioner

&

Managing Director, Uttarakhand Power Corporation Limited (UPCL) …Respondent

Victoria Cross Vijeta Gabar Singh Bhawan, Kanwali Road, Dehradun

10.07.2014

In the matter of: Application seeking approval of the Commission for the investment on the project covering construction of 44.1 km, 33 kV line to connect 7 Nos. 33/11 kV Sub-station to 220/33 kV Sub-station Jhajhra.

And

In the matter of: Uttarakhand Power Corporation Limited (UPCL) .... Petitioner

02.07.2014

In the matter of: Filing of proposal for prior approval of "Capital Investment for Renovation & Modernization of 3 x 10 MW Kulhal HEP" of UJVN Ltd. under Section 61 and 86 of the Electricity Act, 2003 read with the relevant regulations and guidelines of the Hon’ble Commission.

And

 In the matter of: UJVN Ltd., Dehradun ….Petitioner.

01.07.2014

In the matter of:

 Review Petition on the Commission’s Order dated 05.05.2014 under provisions of the Regulation 68 Regulation 74 of UERC (Conduct of Business) Regulations, 2004 read with the relevant provisions of the Electricity Act, 2003 in the matter application seeking approval of releasing additional 6 MVA load (Total of 20 MVA) on Supply Voltage of 33 kV to M/s Birla Tyres, Unit-2, Hardwar.

And In the matter of:

Uttarakhand Power Corporation Limited (UPCL) ....Petitioner

&

1. M/s Birla Tyres, Unit-II, Khedi Mubarakpur, Laksar, Haridwar .... Respondent 1

2. Power Transmission Corporation of Uttarakhand Limited (PTCUL) .... Respondent 2

24.06.2014

In the matter of:

Petition to waive the per day Penalty for non compliance imposed vide order dated 22 January, 2014 passed by the Commission.

AND

In the matter of:

Managing Director, UPCL ….. Petitioner

17.06.2014

In the matter of: Application seeking approval for the investment on the projects covering (i) Replacement of ACSR conductor by AB cable in theft prone areas. (ii) Installation of additional transformers.

AND

MD, UPCL.... Petitioner

10.06.2014

In the matter of:

Petition seeking approval of the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Super Hydro Electric Pvt. Ltd.

AND

In the matter of:

Uttarakhand Power Corporation Ltd. Petitioner

AND

In the matter of:

M/s Super Hydro Electric Pvt. Ltd. Respondent No. 1

Power Transmission Corporation Uttarakhand Ltd. Respondent No. 2

09.06.2014

In the matter of:

Application seeking recovery of claim in respect of Deemed Generation under Section 44 (A) of the UERC (Tariff and Other Terms for Supply of Electricity from Non-conventional and Renewable Energy Sources) Regulations, 2012 and as amended by UERC’s Tariff Regulations of 2013, in accordance with Section 181 of the Electricity Act, 2003.

AND

In the matter of:

M/s Himalaya Hydro Pvt. Ltd. … Petitioner

AND

Uttarakhand Power Corporation Ltd. ... Respondent No. 1

Power Transmission Corporation of Uttarakhand Ltd. ... Respondent No. 2

09.06.2014

In the matter of:

Petition to waive the per day Penalty for non compliance imposed vide order dated 22 January, 2014 passed by the Commission.

29.05.2014

In the matter of:

Dispute between UJVN Ltd. and Uttarakhand Power Corporation Limited (UPCL)

relating to payments.

And

In the matter of:

Managing Director, UJVN Ltd., ....Petitioner

“UJJWAL”, Maharani Bagh, G.M.S. Road, Dehradun

&

Managing Director, Uttarakhand Power Corporation Limited (UPCL) .... Respondent

Victoria Cross Vijeta Gabar Singh Bhawan, Kanwali Road, Dehradun

16.05.2014

In the matter of:

Review Petition on the Order dated 16.01.2014 issued by Hon’ble UERC in the matter of

Non-compliance of UERC (Release of New HT & EHT Connections, Enhancement and

Reduction of Loads) Regulations, 2008 and in the matter of M/s Gold Plus Glass Industry

Ltd. Thithola (Roorkee) and Uttarakhand Power Corporation Ltd.

And

In the matter of:

MD, Power Transmission Corporation of Uttarakhand Limited (PTCUL) .... Petitioner

&

1. M/s Gold Plus Glass Industry Ltd. Thithola (Roorkee) .... Respondent 1

2. MD, Uttarakhand Power Corporation Limited (UPCL) .... Respondent 2

16.05.2014

In the matter of:

Suo-moto proceedings initiated under section 142 of the Electricity Act, 2003 for Non compliance

of the Commission’s Directions

And

In the matter of:

Non-implementation of Order dated 09.10.2012 of the Ombudsman (Electricity) in the

matter of IDPL, Virbhadra, Rishikesh

&

1. MD, Uttarakhand Power Corporation Limited (UPCL) .... Respondent 1

2. General Manager, M/s IDPL, Virbhadra, Rishikesh .... Respondent 2

16.05.2014

In the matter of:

Non-compliance by UPCL in the matter of directives given to it by the Commission on implementation of Scheme of Prepaid Metering vide Tariff Order dated April 11, 2012 for FY 2012-13.

AND

In the matter of:

Uttarakhand Power Corporation Ltd. … Respondent

16.05.2014

In the matter of:

Review Petition against the Order dated 16.01.2014 issued by Hon’ble UERC in the matter of Non-compliance of UERC (Release of New HT & EHT Connections, Enhancement and Reduction of Loads) Regulations, 2008 and in the matter of M/s Gold Plus Glass Industry Ltd. Thithola (Roorkee) and Uttarakhand Power Corporation Ltd.

And

In the matter of:

Power Transmission Corporation of Uttarakhand Limited (PTCUL) .... Petitioner

&

1. M/s Gold Plus Glass Industry Ltd. Thithola (Roorkee) .... Respondent 1

2. Uttarakhand Power Corporation Limited (UPCL) .... Respondent 2

06.05.2014

In the matter of:

Application seeking approval of releasing additional 6 MVA load (Total of 20 MVA) on Supply Voltage of 33 kV to M/s Birla Tyres, Unit-2, Hardwar.

And

In the matter of:

M/s Birla Tyres, Unit-II, Khedi Mubarakpur, Laksar, Haridwar ....Petitioner

&

1. Uttarakhand Power Corporation Limited (UPCL) .... Respondent 1

2. Power Transmission Corporation of Uttarakhand Limited (PTCUL) .... Respondent 2

05.05.2014

In the matter of:

Application seeking approval of UERC on the wrongful & impugned decision by Uttarakhand Power Corporation Ltd. (UPCL) regarding cost sharing of Rajstar/Gangani Sub Station as per MoU signed by UPCL & Regency Gangani Energy Pvt. Ltd. on 23rd July, 2009

AND

In the matter of:

M/s Regency Gangani Energy Pvt. Ltd. … Petitioner

AND

Uttarakhand Power Corporation Ltd. ... Respondent

06.05.2014

In the matter of:

Non-compliance by UPCL in the matter of directives given to it by the Commission on implementation of Scheme of Prepaid Metering vide Tariff Order dated April 11, 2012 for FY 2012-13.

AND

In the matter of:

Uttarakhand Power Corporation Ltd. … Respondent

06.05.2014

In the matter of:

Application seeking recovery of claim in respect of Deemed Generation under Section 44 (A) of the UERC (Tariff and Other Terms for Supply of Electricity from Non-conventional and Renewable Energy Sources) Regulations, 2012 and as amended by UERC’s Tariff Regulations of 2013, in accordance with Section 181 of the Electricity Act, 2003.

AND

In the matter of:

M/s Himalaya Hydro Pvt. Ltd. … Petitioner

AND

Uttarakhand Power Corporation Ltd. ... Respondent No. 1

Power Transmission Corporation of Uttarakhand Ltd. ... Respondent No. 2

06.05.2014

In the matter of:

Applications filed by PTCUL seeking approval of Investments/Capital Expenditures with regard to Construction of (2x50 MVA) 220/33 kV S/s at Piran Kaliar, Construction of (6x5 MVA) 132 kV GIS S/s at Bageshwar and Construction of (2x20 MVA) 132 kV GIS S/s at Lohaghat due to change in scope of work.

AND

In the matter of:

Power Transmission Corporation of Uttarakhand Ltd. (PTCUL).           ...Petitioner

23.04.2014

In the matter of:

Application seeking approval of releasing additional 6 MVA load (Total of 20 MVA) on Supply Voltage of 33 kV to M/s Birla Tyres, Unit-2, Hardwar.

And

In the matter of:

M/s Birla Tyres, Unit-II, Khedi Mubarakpur, Laksar, Haridwar ....Petitioner

&

1. Uttarakhand Power Corporation Limited (UPCL) .... Respondent 1

2. Power Transmission Corporation of Uttarakhand Limited (PTCUL) ...Respondent 2

11.04.2014

In the matter of:

Approval of Short term power procurement for the month from April 14 to June 14.

AND

Uttarakhand Power Corporation Ltd. (UPCL).

10.04.2014

In the matter of:

Application filed by M/s Him Urja Pvt. Ltd., New Delhi under UERC (Compliance of Renewable Purchase Obligation) Regulation, 2010 seeking accreditation and issuance of Renewable Energy Certificates for Rajwakti Generating Station.

AND

In the matter of:

M/s Him Urja Pvt. Ltd. … Petitioner

AND

In the matter of:

Uttarakhand Renewable Energy Development Agency

&

Uttarakhand Power Corporation Ltd. .... Respondents

25.03.2014

In the matter of :

Application filed by M/s Swasti Power Ltd. seeking for condonation of delay in filing of the petition for determination of Project Specific Tariff in respect of 22.5 MW Bhilangana HEP in Uttarakhand

AND

In the matter of:

M/s Swasti Power Ltd. ...Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. …Respondent

10.01.2014

         

2013

 In the matter of Suo-moto proceedings initiated by the Commission for non-compliance by UPCL of Section 59 of the Electricity Act, 2003 read with Regulation 5 of UERC (Standard of Performance) Regulations, 2007AND UPCL.

13.11.2013

In the matter of Non-Compliance by UPCL in the matter of directives given to it by the Commission on implementation of Scheme of Prepaid Metering vide Tariff Order dated 11.04.2012 for FY 2012-13.

29.10.2013

In the matter of Application seeking waiver and refund of penalty imposed by the Commission vide its Order dated 01.09.2005 AND UPCL.

11.10.2013

In the matter of:

Non-compliance of UERC (Release of New HT & EHT Connections, Enhancement and

Reduction of Loads) Regulations, 2008.

AND

In the matter of:

M/s Gold Plus Glass Industry Ltd., Thithola (Roorkee) ...Petitioner

Vs.

Uttarakhand Power Corporation Limited (UPCL)

Power Transmission Corporation of Uttarakhand Limited (PTCUL) ...Respondents

11.10.2013

In the matter of:   

Petition filed by UJVN Ltd. for review of the Order on Approval of Business Plan and Multi Year Tariff for FY 2013-14 to FY 2015-16.

AND

In the matter of:

UJVN Ltd.       ….Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd.         ….Respondent

30.07.2013

In the matter of:

Non-Compliance by Obligated Entities under UERC (Tariff and Other Terms for Supply of Electricity from non-conventional and Renewable Energy Sources) Regulations, 2010 and UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010.

AND

In the matter of:

M/s Tata Motors Pvt Ltd., M/s Purti Textiles, M/s Mahalxmi Polypack Ltd., M/s Air Liquide India Ltd., M/s Rana Bar Ltd., M/s Rana Industries Ltd., M/s Bhavani Industries Ltd., M/s Amul Auto Components Pvt Ltd., Haridwar, M/s Mahabal Auto Pvt. Ltd., M/s Amul Auto Components Pvt Ltd., Unit-II, Pantnagar, M/s U.P. Bone Mills Pvt. Ltd., M/s Amul Auto Components Pvt. Ltd., Unit-II, Haridwar, M/s Sundram Fasteners Ltd., M/s Shriram Foundary Ltd., M/s Mantri Metallic Pvt. Ltd., M/s Shri Grinding Cement Ltd., M/s Ganesha Echosphere Ltd., M/s Ambuja Cement, M/s India Glycols Ltd., M/s Rockman Industries Ltd., M/s Asahi India Glass Ltd., M/s Hindustan National Glass and Industries Ltd.,  M/s Jaypee Roorkee Cement, M/s DVS Industries Ltd., M/s Rojee Tasha Stamping Ltd., M/s Bajaj Motors Ltd., M/s Anusuya Auto Press Parts Pvt. Ltd., M/s Autocomp Corporation Panes Pvt. Ltd., M/s Shivani Locks Pvt. Ltd., M/s Dali & Samir Engineering Pvt. Ltd., M/s Everest Industries Ltd., M/s Amul Auto Components Pvt Ltd., Pantnagar, M/s Pashupati Polytex Ltd., M/s Pashupati Laminators Ltd., M/s Syndicate Auto Components, M/s Sona Somic, M/s Time Technoplast Ltd., Unit-I, M/s Time Technoplast Ltd., Unit-II, M/s Hindustan Zinc Ltd., Pantnagar, M/s Hindustan Zinc Ltd., Haridwar

 ...Respondents

30.07.2013