Miscellaneous Orders: Year-2018 and 2017

Date of Order

Details of the orders

Download
09.11.2018

In the matter of:

Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2018 to 31.12.2018.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

31.10.2018

In the matter of:

Application seeking approval of the Commission on the Draft Power Purchase Agreement for short term power purchase between Uttarakhand Power Corp. Ltd. and M/s Mittal Processors (P) Ltd. (MPPL), M/s PTC India Ltd., M/s Tata Power Trading Company Ltd. (TPTCL), M/s Sembcorp Gayatri Power Ltd. (SGPL) and M/s GMR Energy Trading Ltd.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of:

M/s Mittal Processors (P) Ltd.

M/s PTC India Ltd.

M/s Tata Power Trading Company Ltd.

M/s Sembcorp Gayatri Power Ltd.

M/s GMR Energy Trading Ltd. … Respondents

26.10.2018

Petition No. 34 of 2018

In the matter of:

Application seeking approval of the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Aglar Power Ltd. for Rayat SHP.

Petition No. 35 of 2018

In the matter of:

Application seeking approval of the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Aglar Power Ltd. for Lagrasu SHP.

In the matter of:

Uttarakhand Power Corporation Limited …Petitioner

AND

In the matter of:

M/s Aglar Power Ltd. for Rayat SHP and Lagrasu SHP ……Respondent

24.09.2018

In the matter of:

Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.07.2018 to 30.09.2018.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

17.09.2018

In the matter of:

Petition under section 94(1)(f) of the Electricity Act, 2003 read with Regulation 54 of the UERC (Conduct of Business) Regulations, 2014 for review of the Order dated 17.05.2018 passed by the Commission in the Petition filed by M/s Him Urja Pvt. Ltd. seeking adjustment of tariff.

In the matter of:

M/s Him Urja (P) Ltd. …Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. … Respondent

13.09.2018

In the matter of: Suo-moto proceedings in the matter of Show Cause Notice issued to PTCUL under the provisions of Section 142 read with Section 149 of the Electricity Act, 2003, relating to construction of 132 kV line for M/s Gold Plus Glass Industry Ltd., Roorkee.

And

 In the matter of:

1. Power Transmission Corporation of Uttarakhand Limited (PTCUL)

2. Uttarakhand Power Corporation Limited (UPCL)

3. M/s Gold Plus…………Respondents

12.09.2018

In the Matter of:

Application seeking approval for the investment on the project covering the construction of 01 No. 66/33 kV Substation & its 0.60 Km associated 66 kV line.

And

In the Matter of:

Uttarakhand Power Corporation Limited. (UPCL), VCV Gabar Singh Urja Bhawan, Kanwali Road, Dehradun. …Petitioner.

And

1) Managing Director, Power Transmission Corporation of Uttarakhand Ltd., Vidyut Bhawan, Majra, Dehradun.

2) Managing Director, UJVN Limited, "UJJWAL", Maharani Bagh, GMS Road, Dehradun. ...Respondents.

29.08.2018

In the matter of:

Application seeking permission to setup Solar Power Plant of capacity 40 MW at Haripura Dam (27.34 MW) and Tumaria Dam (13.50 MW) in District Udham Singh Nagar, Uttarakhand, on Net Metering basis for captive consumption by Department of Irrigation, Government of Uttarakhand.

In the matter of:

Irrigation Department, GoUK … Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd.

Uttarakhand Renewable Energy Development Agency (UREDA) … Respondents

28.08.2018

In the matter of:

Application seeking approval of the Commission on the Draft Power Purchase Agreement for short term power purchase between Uttarakhand Power Corp. Ltd. and M/s Tata Power Trading Company Ltd. (TPTCL), M/s NTPC Vidyut Vyapar Nigam Ltd. (NTPC VVN Ltd.) and M/s PTC India Ltd.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of:

M/s Tata Power Trading Company Ltd.

M/s PTC India Ltd.

M/s NTPC Vidyut Vyapar Nigam Ltd. … Respondents

28.08.2018

In the matter of:

Application seeking approval of the Commission on the Power Purchase Agreement executed between Uttarakhand Power Corporation Limited and Uttarakhand Renewable Energy Development Agency (for 10 nos. of Small Hydro Power Plants).

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of:

Uttarakhand Renewable Energy Development Agency (UREDA) … Respondent

21.08.2018

In the Matter of:

Petition seeking determination of project specific tariff for 12.6 MW Small Hydro Power Project under Section 62 and 86 of the Electricity Act, 2003 read with Regulation 13 of Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Nonconventional and Renewable Energy Sources) Regulations, 2013.

In the matter of:

Uttar Bharat Hydro Power Pvt. Ltd. …Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. …Respondent

14.08.2018

In the matter of:

Application seeking relaxation in UERC (The Electricity Supply Code) Regulations 2007 and in UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013.

And

In the matter of:

Uttarakhand Power Corporatin Ltd.

Victoria Cross Vijeta Gabar Singh Urja Bhawan,

Kanwali Road, Dehraudn ………Petitioner

13.08.2018

In the Matter of:

Review Petition on the Commission’s Order dated 21.03.2018 on "True-Up of FY 2016-17, ARR for FY 2017-18 and AFC for FY 2018-19 for UJVN Ltd."

And

In the Matter of:

UJVN Ltd., "UJJWAL", Maharani Bagh, GMS Road, Dehradun …Petitioner

13.08.2018

In the matter of:

Petition for review of the Commission’s Order dated 21.03.2018 on True up for FY 2016-17, Annual Performance Review for FY 2017-18 and Annual Revenue Requirement for FY 2018-19.

In the matter of:

Uttarakhand Power Corporation Ltd. …Petitioner

07.08.2018

In the matter of:

Petition seeking approval of the Commission for advance banking of power with M/s PTC India Limited, M/s Mittal Processors (P) Ltd and M/s Arunachal Pradesh Power Corporation Pvt. Ltd. under a banking arrangement with the Uttarakhand Power Corporation Ltd.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of:

M/s PTC India Ltd.

M/s Arunachal Pradesh Power Corporation Pvt. Ltd.

M/s Mittal Processors (P) Ltd. … Respondents

06.08.2018

In the matter of:

Suo-Moto proceedings initiated by the Commission against non-compliance by UPCL of the provisions of UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010 and directions issued by the Commission vide Order dated 15.09.2017 regarding procurement of unmet Solar and Non-Solar RPO for FY 2016-17 alongwith the RPO for FY 2017-18 latest by March, 2018.

In the matter of:

Sh. B. C. K. Mishra

Managing Director,

Uttarakhand Power Corporation Ltd.,

Dehradun. …Respondent

23.07.2018

In the matter of:

Application seeking prior approval of Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s Tata Power Trading Company Ltd. for procuring Non-Solar RE Energy on short term basis.

In the matter of:

Uttarakhand Power Corporation Limited … Petitioner

AND

In the matter of:

M/s Tata Power Trading Company Ltd. …Respondent

12.07.2018

In the matter of:

Petition filed under Section 86(1)(f) of the Electricity Act, 2003 read with Article 23 of the PPAs, seeking payment of outstanding dues from Uttarakhand Power Corporation Limited for the common evacuation infrastructure constructed for 4x12.5 MW solar projects of ACME Solar Holdings Private Limited, in terms of the power purchase agreements executed between the parties.

In the matter of:

M/s ACME Solar Holdings (P) Ltd.

M/s Devishi Solar Power (P) Ltd.

M/s Devishi Renewable Energy (P) Ltd.

M/s Eminent Solar Power (P) Ltd.

M/s Sunworld Energy (P) Ltd. … Petitioners

AND

In the matter of:

Uttarakhand Power Corporation Ltd. (UPCL)

Power Transmission Corporation of Uttarakhand Ltd. (PTCUL) … Respondents

28.06.2018

In the matter of:

Application seeking prior approval of Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s Manikaran Power Limited, M/s Tata Power Trading Company Ltd. & M/s PTC India Ltd. for procuring Non-Solar RE Energy on short term basis.

In the matter of:

Uttarakhand Power Corporation Limited … Petitioner

AND

In the matter of:

M/s. Tata Power Trading Company Ltd.

M/s PTC India Ltd.

M/s Manikaran Power Ltd. …Respondents

27.06.2018

In the matter of:

Application under Regulation 50 of the UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2013.

In the matter of:

M/s Distributed Solar Power Association

M/s Amplus Solar Power Pvt. Ltd. … Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd.

Uttarakhand Renewable Energy Development Agency (UREDA) … Respondent

20.06.2018

In the matter of:

Petition seeking clarification with regard to the UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2013 or, in the alternative, a specific order of relaxation or permission for establishment of a grid interactive roof-top solar plant with installed solar capacity of 3600 KW on captive consumption basis by M/s Amplus Solar Power Pvt. Ltd. and M/s Asahi India Glass Ltd.

In the matter of:

M/s Amplus Solar Power Pvt. Ltd.

M/s Asahi India Glass Ltd. … Petitioners

AND

In the matter of:

Uttarakhand Power Corporation Ltd.

Uttarakhand Renewable Energy Development Agency (UREDA) … Respondents

20.06.2018

In the Matter of:

Application seeking amendment in UERC (The Electricity Supply Code) Regulations, 2007.

And

In the Matter of:

Uttarakhand Power Corporation Limited. (UPCL),

Victoria Cross Vijeyta Gabar Singh Urja Bhawan, Kanwali Road, Dehradun. …...Petitioner

19.06.2018

In the matter of:

Petition for submission of Draft Metering Communication & Data Acquisition Requirements (MCDAR) for Intra-State Transmission System of Uttarakhand developed in pursuance to Regulation 8.1 of UERC (State Gird Code) Regulations, 2016 and Regulation 10 of UERC (Conduct of Business) Regulations, 2014 for approval of the Commission.

And

In the matter of:

Power Transmission Corporation of Uttarakhand Ltd.,

‘Vidyut Bhawan’, Majra, Dehradun....Petitioner.

15.06.2018

In the matter of:

Suo-moto proceedings in the matter of request made by Mr. Digambar Singh Bisht for issuance of appropriate directions for releasing Grant/Subsidy sanctioned by Central Government, payment in accordance with solar Tariff fixed for FY 2015-16 and immediate grid connectivity for allocated solar power plant to Mr. Digambar Singh Bisht.

In the matter of:

Mr. Digambar Singh Bisht ("Developer")

Uttarakhand Power Corporation Ltd. ("UPCL")

Uttarakhand Renewable Energy Development Agency ("UREDA") … Respondents

15.06.2018

In the matter of:

Suo-moto proceedings in the matter of request made by Mr. Dhirendra Singh Rawat for issuance of appropriate directions to release Grant/Subsidy sanctioned by Central Government and payment in accordance with solar Tariff fixed for FY 2015-16 for supply of solar energy from allocated grid connected Solar Rooftop power plant.

In the matter of:

Mr. Dhirendra Singh Rawat ("Developer")

Uttarakhand Power Corporation Ltd. ("UPCL")

Uttarakhand Renewable Energy Development Agency ("UREDA") … Respondents

29.05.2018

In the matter of:

Suo-moto proceedings in the matter of applicability of tariff for the purpose of incentive on account of revised O&M norms in UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2013 and UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations), 2010.

21.05.2018

In the Matter of:

Approval for the Capital Investment on the Implementation of Phase-II of IT enablement projects under Integrated Power Development Scheme (IPDS), Ministry of Power (MoP), Government of India (GoI).

And

In the Matter of:

Uttarakhand Power Corporation Limited. (UPCL), Victoria Cross Vijeyta Gabar Singh Urja Bhawan, Kanwali Road,

Dehradun. …...Petitioner

17.05.2018

In the matter of:

Petition seeking adjustment of tariff for Vanala Small Hydro Power Project (15 MW) unit of M/s Him Urja Pvt. Ltd. as per Section 61 and 62 of the Electricity Act, 2003 read with Regulation 14 & 15 of UERC (Tariff and Other Terms for supply of Electricity from Renewable Energy Sources and Non fossil fuel based Co- generating Stations) Regulations, 2010, as amended from time to time seeking revision of tariff.

In the matter of:

M/s Him Urja Pvt. Ltd. … Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. … Respondent

12.04.2018

In the Matter of:

Suo-moto proceedings initiated by the Commission on the representation of M/s India Glycols Ltd. regarding illegal demand of Cross Subsidy from Medium Term Open Access (MTOA) consumers by UPCL.

And

In the matter of

1. M/s India Glycols Ltd., A-1, Industrial Area Bazpur Road, Kashipur. .…..Respondent No. 1

2. M/s Hindustan National Glass Ltd. Malviya Nagar, Virbhadra Rishikesh. .…..Respondent No. 2

3. M/s Ester India Ltd. Sohan Nagar, Charubeta, Khatima, U.S. Nagar. …..Respondent No. 3

4. Uttarakhand Power Corporation Limited (UPCL). …..Respondent No. 4

02.04.2018

In the matter of:

Application seeking approval on the Surcharge Waiver Scheme for the Domestic, Non-domestic, Private Tubewell and L.T. Industry Category Consumers.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

23.03.2018

In the Matter of:

Petition filed under Regulation 13 of UERC (Deviation Settlement Mechanism and related matters) Regulations, 2017 for seeking relaxation of one year in Regulation 1(2) for implementation of Intra State ABT and Deviation Settlement Mechanism.

And

In the Matter of:

State Load Despatch Centre (SLDC), Power Transmission Corporation of Uttarakhand Ltd., Vidyut Bhawan, Majra, Dehradun. …….…...Petitioner

And

In the matter of:

1. Uttarakhand Power Corporation Ltd. (UPCL), Victoria Cross Vijeta Gabar Singh Urja Bhawan, Kanwali Road, Dehradun

2. Power Transmission Corporation of Uttarakhand Ltd. (PTCUL), Vidyut Bhawan, Majra, Dehradun

3. UJVN Ltd., “UJJWAL”, Maharani Bag, GMS Road, Dehradun.

4. Uttarakhand Renewable Energy Development Agency (UREDA), Urja Park Campus, Industrial Area, Patel Nagar, Dehradun.

& Others. ……...Respondents

23.03.2018

In the matter of:

Petition seeking approval for increase in existing transaction charges per electricity bill, collected by VLEs (Village Level Entrepreneurs) through M/s CSC e-Governance Service India Ltd and introduction of incentive scheme to VLEs.

AND

In the matter of:

Uttarakhand Power Corporatin Ltd., Victoria Cross Vijeta Gabar Singh Urja Bhawan,  Kanwali Road, Dehraudn ………Petitioner

13.03.2018

In the Matter of: Petition for approval of "Additional Capital Works amounting to Rs. 44.05 Crore of 4X76 MW Maneri Bhali-II HEP".

And

In the Matter of: UJVN Ltd., "UJJWAL", Maharani Bagh, G.M.S, Road, Dehradun. …………Petitioner

13.03.2018

In the matter of: Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.01.2018 to 31.03.2018.

In the matter of: Uttarakhand Power Corporation Ltd. … Petitioner

08.03.2018

In the Matter of: Approval of Capital Investments under Para 11 of the Transmission Licence for laying of OPGW cable under the project "Reliable Communication & Data Acquisition System for 132 kV & above Substations" in PTCUL under PSDF Scheme. And In the Matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) …...Petitioner

23.01.2018

In the matter of: Application seeking approval of the Power Purchase Agreement between M/s Himalaya Hydro Pvt. Ltd. and Uttarakhand Power Corporation Ltd.

In the matter of: M/s Himalaya Hydro Pvt. Ltd. …Petitioner

AND

In the matter of: Uttarakhand Power Corporation Limited. …Respondent

17.01.2018

In the matter of: Show cause Notice-cum-Notice for Personal Hearing issued to MD, UPCL in the matter of Non-compliance of sub-Regulation 14 of Regulation 5 & sub-Regulation 15 of Regulation 5 of UERC (Release of new LT Connections, Enhancement and Reduction of Loads) Regulations, 2013.

And

In the matter of: Managing Director, Uttarakhand Power Corporation of Ltd. (UPCL) ...Respondent

04.01.2018

In the matter of:

Hon’ble ATE Judgment dated 14.11.2017 in Appeal No. 285 of 2016 & IA No. 585 of 2016 setting aside the Commission’s Order dated 20.09.2016 and remand back of the matter to the Commission to consider the case of the Appellant on merits independently and in accordance with law.

In the matter of:

M/s Dans Energy Pvt. Ltd. .... Petitioner

And

In the matter of:

Uttarakhand Power Corporation Ltd. …Respondent

21.12.2017

In the Matter of: Application seeking approval for the investment on the project covering the construction of 01 No. 66/33 KV Substation & 0.60 Km 66 KV Line and 02 No. 33/11 KV Substations & their associated 15.20 Km 33 KV Line.

And In the Matter of: Uttarakhand Power Corporation Limited. (UPCL), Dehradun...Petitioner.

18.12.2017

In the matter of:

Clarification Petition under Regulation 59 and 61 read with Regulation 54 of the UERC (Conduct of Business) Regulations, 2014 and Regulation 103, 104 and 105 of MYT Regulations, 2015 in the matter of Tariff Order dated 30.11.2016 passed by the Commission against Tariff Petition filed by M/s GBHPPL u/s 62 and 86(1)(a) of the Electricity Act, 2003 read with the relevant provisions of UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations, 2015 for determination of tariff for supply of power from their 70 MW Hydro Electric Power Project to UPCL.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of:

M/s Greenko Budhil Hydro Power Pvt. Ltd. ... Respondent

18.12.2017

In the matter of:

Additional Surcharge levied by Uttarakhand Power Corporation Ltd. during the period 01st December 2014 to 31st of March 2017 on Open Access Power Purchased.

In the matter of:

M/s Kashi Vishwanath Textile Mill (P) Ltd. .…...… Petitioner

AND In the matter of: Uttarakhand Power Corporation Ltd. (UPCL) …...... Respondent

12.12.2017

In the matter of:

Suo-moto proceedings in the matter of application seeking revision of tariff of Mohammadpur and Pathri SHPs of UJVN Ltd. determined by the Commission vide its Order dated 30.11.2016 & 25.05.2017 consequent to the amendment in RE Regulations, 2013.

In the matter of:

Uttarakhand Power Corporation Ltd. … Respondent

06.12.2017

In the matter of:

Petition filed under Regulation 59 and 39 of the UERC (Conduct of Business Regulations), 2014 and Regulation 55A, 103, 104 & 105 of MYT Regulation 2015.

In the matter of:

Uttarakhand Power Corporation Limited … Petitioner

AND

In the matter of:

M/s Sravanthi Energy Pvt. Ltd.

M/s Gamma Infraprop Pvt. Ltd.

M/s Beta Infratech Pvt. Ltd. … Respondents

01.12.2017

In the Matter of:

Investment Approval of revised DPR of under Construction 220 kV Piran Kaliyar-Puhana (PGCIL) double circuit Line on double circuit Towers.

And

In the Matter of:

Power Transmission Corporation of Uttarakhand Limited (PTCUL)

Vidyut Bhawan, Near ISBT Crossing, Saharanpur Road,

Majra, Dehradun.

28.11.2017

In the matter of:

Suo-moto proceedings in the matter of non-compliance of Commission’s direction issued vide order dated 16.05.2017 regarding the finalization of Station Heat Rate of Gas based Combined Cycle Power Plant of Gama Infraprop Pvt. Ltd. located at Kashipur, Uttarakhand.

In the matter of:

Uttarakhand Power Corporation Ltd. … Respondent

24.11.2017

In the matter of:

Suo-moto proceedings in the matter of application under Section 62 and 86 of Electricity Act, 2003 seeking modification of the project specific tariff of 10.5 MW Sarju III SHP of M/s Uttar Bharat Hydro Power Pvt. Ltd. as determined by the Commission vide its Order dated 16.03.2017 consequent to the amendment in RE Regulations, 2013.

In the matter of:

Uttarakhand Power Corporation Ltd. … Respondent

22.11.2017

In the matter of:

Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2017 to 31.12.2017.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

22.11.2017

In the matter of:

Application seeking approval of the Commission on the bulk Power Purchase Agreement to be executed between Uttarakhand Power Corporation Limited and M/s UJVN Limited.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of:

UJVN Ltd. …Respondent

22.11.2017

In the matter of:

Petition to extend the benchmark capital cost & generic tariff as decided by the Commission vide Order dated 16.06.2016 upto 31.01.2018 for Grid Interactive Rooftop and Small Solar Power Plants.

In the matter of:

Uttarakhand Renewable Energy Development Agency …Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. ...Respondent

03.11.2017

In the matter of:

Application seeking approval of the Commission on the Draft Power Purchase Agreement executed between Uttarakhand Power Corporation Limited and Uttarakhand Renewable Energy Development Agency.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of:

Uttarakhand Renewable Energy Development Agency (UREDA) … Respondent

01.11.2017

In the matter of:

Application seeking approval of the Commission on the Draft Power Purchase Agreement to be executed between Uttarakhand Power Corporation Limited and M/s Avani Bio Energy Pvt. Ltd.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of:

M/s Avani Bio Energy Pvt. Ltd … Respondent

24.10.2017

In the matter of:

Petition filed under Section 62 & Section 86(1)(a) of the Electricity Act, 2003, read with the UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations, 2015, as amended till date for determination of tariff for the Control Period from FY 2016-17 till FY 2018-19 for supply of power to UPCL from 428 MW Gas based Kashipur Combined Cycle Power Plant of M/s Sravanthi Energy Pvt. Ltd. at Village Khaikhera, Kashipur, District Udhamsingh Nagar.

AND

In the matter of:

Petition seeking approval of Business Plan for the Control Period starting from FY 2016-17 to FY 2018-19 for supply of 214 MW of power to UPCL from 428 MW Gas based Kashipur Combined Cycle Power Plant of Sravanthi Energy Private Ltd. at Village Khaikhera, Kashipur, District Udhamsingh Nagar, Uttarakhand.

In the matter of:

M/s Sravanthi Energy Pvt. Ltd. … Petitioner

AND

Uttarakhand Power Corporation Ltd. ... Respondent

28.09.2017

In the Matter of: Petition seeking investment approval on the project for implementing Integrated Automatic Meter Reading (IAMR) System on 12000 nos. of consumers to be executed on turnkey basis.

And In the Matter of: Uttarakhand Power Corporation Limited. (UPCL), Dehradun. …Petitioner.

15.09.2017

In the matter of:

Petition for seeking carry forward of Renewable Purchase Obligation of FY 2016-17 amounting to 787.68 MU (Non-Solar) and 161.32 MU (Solar) as per the provisions of UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND In the matter of:

Uttarakhand Renewable Energy Development Agency (UREDA) … Respondent

21.08.2017

In the Matter of: Condonation for delay in implementation of online issuance of NoC to Open Access Customers and submission of Action Plan for implementation of same under the provisions of Regulation 10 of UERC (Conduct of Business) Regulation, 2014.

And In the Matter of: State Load Despatch Center, Power Transmission Corporation of Uttarakhand Ltd. (PTCUL) Saharanpur Road, Majra, Dehradun. ……..Petitioner

21.08.2017

In the matter of:

Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.07.2017 to 30.09.2017.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

09.08.2017

In the matter of: Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju-III Small Hydro Power Project of Uttar Bharat Hydro Power Pvt. Ltd.

In the matter of: M/s Uttar Bharat Hydro Power Pvt. Ltd. ..… Petitioner

AND In the matter of: Uttarakhand Power Corporation Ltd. ..... Respondent

03.08.2017

In the matter of:

Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2017-18 and onwards till reviewed/revised by the Commission.

03.08.2017

In the matter of:

Petition for review of the Commission’s Order dated 29.03.2017 on True up for FY 2015-16, Annual Performance Review for FY 2016-17 and Annual Revenue Requirement for FY 2017-18.

In the matter of:

Uttarakhand Power Corporation Ltd. …Petitioner

18.07.2017

In the matter of:

Application seeking approval of the Commission on the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s RV Akash Ganga Solar Power Ltd.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of:

M/s RV Akash Ganga Solar Power Ltd. … Respondent

29.06.2017

In the matter of:

Augmentation of 220 kV Substation SIDCUL Haridwar from 2x80 MVA (132/33 kV)+ 1x50 MVA (220/33 kV) to 2x80 MVA (132/33 kV)+1x50 MVA (220/33 kV)+1x25 MVA (220/33 kV) and construction of 01 No. of 220 kV T/F Bay, 01 No. 33 kV T/F Bay & 02 No. of 33 kV feeder Bay.

And

In the Matter of:

Power Transmission Corporation of Uttarakhand Limited (PTCUL)

       
27.06.2017

In the matter of:

Petition for seeking prior approval of "Capital Investment for Renovation & Modernisation" of Dhakrani HEP (3 X 11.25 MW) of UJVN Ltd.

And

 In the matter of:

 UJVN Ltd., "UJJWAL", Maharani Bag, GMS Road, Dehradun

        
20.06.2017

In the matter of:

Petition seeking approval of the Commission for advance banking of power to Punjab State Power Corporation Ltd. under banking arrangement by Uttarakhand Power Corporation Ltd.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

01.06.2017

In the matter of:

Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.04.2017 to 30.06.2017.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

29.05.2017

In the matter of:

Application seeking approval of the Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and UJVN Ltd.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of:

UJVN Ltd. … Respondent

25.05.2017

In the matter of:

Review Petition filed under Regulation 54 of UERC (Conduct of Business) Regulations, 2014 for review of the order dated 30th October, 2016 passed by the Commission in the matter of Re-determination of generic tariff for Pathri Small Hydro Generating Station (3X6.8 MW) of UJVN Ltd. under Section 62, 86 and 94(1)(f) of the Electricity Act, 2003 read with the relevant Regulations, Orders and Guidelines of the Commission.

AND

In the matter of:

Review Petition filed under Regulation 54 of UERC (Conduct of Business) Regulations, 2014 for review of the order dated 30th October, 2016 passed by the Commission in the matter of Re-determination of generic tariff for Mohammadpur Small Hydro Generating Station (3X3.1 MW) of UJVN Ltd. under Section 62, 86 and 94(1)(f) of the Electricity Act, 2003 read with the relevant Regulations, Orders and Guidelines of the Commission.

In the matter of:

UJVN Ltd. … Petitioner

In the matter of:

Uttarakhand Power Corporation Ltd. … Respondent

25.05.2017

In the Matter of: Misc. Application filed against the shifting of High Tension Line (33 KV) in Prakash Vihar, Haridwar Road, Dehradun under section 67(4) of The Electricity Act, 2003.

And

In the Matter of: Smt. Anita Gupta & Ors. …….............Petitioners Vs

1. Secretary (Energy), GoU, Secretariat, Dehradun

2. Managing Director, UPCL, Dehradun

3. Sr. Superintendent of Police, Dehradun ………….Respondents

23.05.2017

In the matter of:

Suo-moto proceedings in the matter of Office Memorandum issued by UPCL regarding continuation of Continuous Power Supply Surcharge/Additional Surcharge on Power purchased through open access.

In the matter of:

1. Uttarakhand Power Corporation Ltd.

2. M/s India Glycols Ltd.

3. M/s Hindustan National Glass & Industries Ltd.

4. M/s Asahi India Glass Ltd.

5. M/s Vista Alps Industries Ltd.

6. M/s Kashi Vishwanath Textile Mill (P) Ltd.

7. M/s Air Liquid North India Pvt. Ltd. … Respondents

16.05.2017

In the matter of:

Petition to extend the benchmark capital cost & generic tariff as declared by UERC vide its Order dated 16.06.2016, i.e. upto 31.07.2017 for Grid Interactive Rooftop and Small Solar Power Plants.

In the matter of:

Uttarakhand Renewable Energy Development Agency …Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. ...Respondent

16.05.2017

In the matter of:

Application seeking prior approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Mittal Processors Pvt. Ltd. (MPP Ltd.), M/s GMR Energy Trading Ltd. (GMRET Ltd.) and M/s Tata Power Trading Company Ltd. (TPTC Ltd.) for procurement of Non-Solar RE Energy on Short term basis.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

In the matter of:

M/s Mittal Processors Pvt. Ltd.

M/s GMR Energy Trading Ltd.

M/s Tata Power Trading Company Ltd. … Respondents

16.05.2017

In the matter of:

Petition filed under Section 62 & Section 86(1)(a) of the Electricity Act, 2003, read with the UERC (Terms & Conditions for Determination of Tariff) Regulations, 2011 and UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations, 2015 for determination of tariff for FY 2015- 16 & for the Control Period from FY 2016-17 till FY 2018-19 for supply of power to UPCL from 214 MW Gas based Kashipur Combined Cycle Power Plant of M/s Gama Infraprop Pvt. Ltd. at Mahuakhedaganj, Kashipur, District Udhamsingh Nagar.

In the matter of:

Petition seeking approval of Business Plan for the Control Period starting from FY 2016-17 to FY 2018-19 for 214 MW Gas based Kashipur Combined Cycle Power Plant of Gama Infraprop Private Ltd. at Mahuakhedaganj, Kashipur, District Udhamsingh Nagar, Uttarakhand.

In the matter of:

M/s Gama Infraprop Pvt. Ltd. … Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. ... Respondent

15.05.2017

In the matter of: Application seeking approval for the investment for improvement of Bill Collection Facilities of UPCL in lieu of the Order dated 01.09.2005 passed by the Commission.

AND

 In the matter of: Uttarakhand Power Corporation Ltd. (UPCL) ...Petitioner

09.05.2017

In the matter of: Petition to relax or vary the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013 whereby the penalty was imposed in the matter of delay in release of new LT service connections for the period of FY 2008-09 to FY 2015-16.

And

 In the matter of: Uttarakhand Power Corporation of Ltd. (UPCL) ...Petitioner

03.05.2017

In the Matter of: Petition filed under Regulation 37(1) of the UERC(Conduct of Business) Regulations, 2014, Clause 3.2 and 14.A of the Transmission License read with Section 18 of the Electricity Act and other relevant provisions of the Electricity Act, 2003 for amending the terms and condition of the Transmission License of Power Transmission Corporation of Uttarakhand.

And

 In the Matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) Vidyut Bhawan, Near ISBT Crossing, Saharanpur Road, Majra, Dehradun.

01.05.2017

In the matter of:

Approval for Construction of Separate Building of SLDC at 132 kV Sub-Station

Majra Campus, Dehradun.

And

In the Matter of:

Power Transmission Corporation of Uttarakhand Limited (PTCUL)

17.04.2017

In the matter of:

Petition to review/reconsider the Order dated January 25, 2017 passed by the Commission in the matter of petition filed by M/s GIPL for amendment of Clause No. 9 relating to "Billing and Payment", Clause No. 1.1.32 relating to "Due Date" and Clause No. 9.4 relating to "Payment Security Mechanism" of Power Purchase Agreement for procurement of 107 MW of Power on Long Term Basis between 225 MW Gas based Combined Cycle Power Plant of Gama Infraprop Pvt. Ltd. at Mahuakhedaganj, Kashipur & Uttarakhand Power Corporation Ltd. (UPCL).

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of:

M/s Gama Infraprop (P) Ltd. … Respondent No. 1

M/s Sravanthi Energy Pvt. Ltd. … Respondent No. 2

M/s Beta Infratech Pvt. Ltd. … Respondent No. 3

12.04.2017

In the matter of:

Petition filed under Regulation 9, 20, 58, 59, 61 and 62 of the UERC (Conduct of Business Regulations), 2014 and Regulation 49 and 50 of UERC RE Regulation, 2013 for adjudication of dispute and other matter between UPCL and 04 Nos. Solar Power Generators.

In the matter of:

M/s Vivan Solar Pvt. Ltd.

M/s Purshotam Industries Ltd.

M/s Purshotam Ispat

M/s Eastman International … Petitioners

AND

In the matter of:

Uttarakhand Power Corporation Ltd. ... Respondent

12.04.2017

In the matter of:

Application seeking approval of the Uttarakhand Electricity Regulatory Commission on the draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Melkhet Power Private Limited.

In the matter of:

Uttarakhand Power Corporation Ltd. … Petitioner

AND

In the matter of:

M/s Melkhet Power Private Ltd. …Respondent-1

Power Transmission Corporation of Uttarakhand Ltd. …Respondent-2

06.04.2017

In the matter of:

Approval of Capital Investments under Para 11 of the Transmission Licence involving

following works:

(a) Procurement and Stringing of 132 kV Roorkee-Laksar line by replacing existing Wolf/Panther conductor with ACCC (HTLS) Casablanca conductor.

(b) Procurement and Stringing of 132 kV Roorkee-Manglore line by replacing existing Wolf/Panther conductor with ACCC (HTLS) Casablanca conductor.

(c) Construction of 132/33 kV sub-station, Patanjali Padartha, Haridwar and LILO of 132 kV Chilla-Nazibabad line at 132/33 kVsub-station, Patanjali Padartha,

Haridwar.

(d) Replacement of ACSR wolf conductor in double circuit of Khatima-Pilibhit line by HTLS conductor.

(e) Replacement of ACSR Panther Conductor in 132 kV Sitarganj (PGCIL)-SIDCUL Sitarganj single Circuit line with HTLS conductor

(f) Replacement of ACSR Panther conductor in first circuit of 132 kV Kichha- Sitarganj Line with HTLS conductor.

And

In the Matter of:

Power Transmission Corporation of Uttarakhand Limited (PTCUL)

06.04.2017

In the Matter of: Capital Investment for the investment on the works covered under centrally funded Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY) of Ministry of Power (MoP), Govt. of India (GoI).

And In the Matter of: Uttarakhand Power Corporation Limited. (UPCL), Victoria Cross Vijeyta Gabar Singh Urja Bhawan, Kanwali Road, Dehradun. …...Petitioner

29.03.2017

In the matter of:

Applicability of Rate Schedule RTS-4A: Agriculture Allied Activities on the connection no. 557 issued to M/s Flex Foods Limited at their Mushroom Farm at Chidderwala, Dehradun.

In the matter of:

Uttarakhand Power Corporation Ltd. … Respondent

23.03.2017

In the matter of:

Installation of 18 kWp capacity Grid Connected Rooftop Solar Power Plant at Uttarakhand Electricity Regulatory Commission (UERC) building, Dehradun sanctioned by M/s PFC Ltd. under IPDS Programme.

In the matter of:

Uttarakhand Power Corporation Limited (UPCL) ...Respondent

16.03.2017

In the Matter of:

Petition seeking determination of project specific tariff for 10.5 MW Small Hydro Power Project under Section 62 and 86 of the Electricity Act, 2003 read with Regulation 13 of Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Nonconventional and Renewable Energy Sources) Regulations, 2013.

In the matter of:

Uttar Bharat Hydro Power Pvt. Ltd. …Petitioner

AND

In the matter of:

Uttarakhand Power Corporation Ltd. …Respondent

10.03.2017

In the matter of:

Petition seeking approval of the Commission on the Power Purchase Agreement proposed to be executed between Uttarakhand Power Corporation Ltd. and M/s K. Ramachandra Rao Transmission & Projects Pvt. Limited.

In the matter of:

Uttarakhand Power Corporation Ltd. …Petitioner

AND

M/s K. Ramachandra Rao Transmission & Projects Pvt. Limited ...Respondent

08.03.2017

In the Matter of: Application seeking approval for the investment on the following projects:

(A) Construction of 9 Nos. 33/11 kV S/s and their associated lines of 109.40 km.

(B) Construction of 06 No. feeders from 132/33 kV S/s Laltappar.

(C) Augmentation of 11 Nos. 33/11 kV Sub-stations.

And In the Matter of: Uttarakhand Power Corporation Limited. (UPCL), Victoria Cross, Vijeta Gabar Singh Urja Bhawan, Kanwali Road, Dehradun. …….…...Petitioner

01.03.2017

In the Matter of: Approval of 09 nos. projects under Capital Investments under Para 11 of the Transmission Licence involving various works of System Improvement. And

In the Matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL)

17.02.2017

In the matter of: Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited & M/s Beta Infratech Pvt. Ltd.

In the matter of: Uttarakhand Power Corporation Ltd. …Petitioner

AND

In the matter of: M/s Beta Infratech Pvt. Ltd. ...Respondent No. 1

Power Transmission Corporation of Uttarakhand Ltd. ...Respondent No. 2

10.02.2017

In the matter of: Petition under Section 62 and Section 86 (1) (a) of the Electricity Act, 2003, read with the UERC (Terms and Conditions for Determination of Tariff) Regulations, 2011 (in short, UERC MYT Regulations, 2011) and UERC (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2015, as amended till date (in short, UERC MYT Regulations, 2015) for determination of tariff for FY 2016-17 and for the Control Period from FY 2016-17, 2017-18 till FY 2018-19 for supply of power to Uttarakhand Power Corporation Limited (UPCL) from 214 MW Gas based Kashipur Combined Cycle Power Plant of Beta Infratech Pvt. Ltd. at Mahuakheraganj, Kashipur, District Udhamsinghnagar, Uttarakhand.

In the matter of: M/s Beta Infratech Pvt. Ltd. … Petitioner

AND

In the matter of: Uttarakhand Power Corporation Ltd. ... Respondent

10.02.2017

In the Matter of: Approval of Capital Investments under Para 11 of the Transmission Licence involving following works of System Improvement:

(a) Augmentation of 132 kV S/s Bindal from 2x40 MVA to 3x40 MVA by procurement, installation & commissioning of 132/33 kV, 40 MVA Transformer at 132 kV S/s Bindal, Dehradun.

(b) Augmentation of Transformation capacity from 2x40 MVA to 3x40 MVA by commissioning of 01 no. additional 132/33 kV, 40 MVA Transformer, HV & LV Bay & Oil pit for NIFDES & Construction of 03 Nos. new 33 kV Feeder Bays at 132 kV S/s Jashodharpur, Kotdwar (Pauri Garhwal).

And In the Matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL)

07.02.2017

In the Matter of: Approval of 09 nos. projects under Capital Investments under Para 11 of the Transmission Licence involving various works of System Improvement. And

In the Matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL)

06.02.2017

In the Matter of: Investment Approval for Shifting of 132 kV lines in Dev Sanskriti Vishvavidyalaya Campus for Shri Vedmata Gayatri Trust, Shantikunj, Haridwar. And

In the Matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) Vidyut Bhawan, Near ISBT Crossing, Saharanpur Road, Majra, Dehradun.

In the matter of: Uttarakhand Power Corporation Ltd. (UPCL) ........Respondent No. 1

Shri Vedmata Gayatri Trust, Shantikunj, Haridwar. .........Respondent No. 2

06.02.2017

In the matter of: Petition seeking determination of provisional tariff in anticipation of completion of Tanga Small Hydropower Project (5MW) of Himalaya Hydro Pvt. Ltd., as per Regulation 13, sub-clause (2) and Regulation 10, sub-clause (2) (option for fixation of "Project Specific Tariff") of UERC (Tariff and other terms for supply of electricity from non-conventional and renewable energy sources) Regulations, 2013.

In the matter of: M/s Himalaya Hydro Pvt. Ltd. …Petitioner AND

In the matter of: Uttarakhand Power Corporation Ltd. ...Respondent

25.01.2017

In the matter of: Petition filed for amendment of Clause No. 9 relating to "Billing and Payment", Clause No. 1.1.32 relating to "Due Date" and Clause No. 9.4 relating to "Payment Security Mechanism" of Power Purchase Agreement for procurement of 107 MW of Power on Long Term Basis between 225 MW Gas based Combined Cycle Power Plant of Gama Infraprop Pvt. Ltd. at Mahuakhedaganj, Kashipur and Uttarakhand Power Corp. Ltd. (UPCL).

In the matter of:  M/s Gama Infraprop (P) Ltd. … Petitioner  AND

In the matter of: Uttarakhand Power Corporation Ltd. ... Respondent

16.01.2017

In the matter of: Application seeking approval of the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Uttar Bharat Hydro Power Private Limited.

In the matter of: Uttarakhand Power Corporation Ltd. … Petitioner AND

In the matter of: M/s Uttar Bharat Hydro Power (P) Ltd. … Respondent

16.01.2017

In the matter of: Application seeking approval of the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Khutani Power Company Private Limited.

In the matter of: Uttarakhand Power Corporation Ltd. … Petitioner AND

In the matter of: M/s Khutani Power Company (P) Ltd. … Respondent

12.01.2017

In the matter of: Petition filed by UPCL to review/reconsider the personal penalty imposed vide Order dated 05th October, 2016 issued by the Commission in the matter of suo-moto proceedings initiated by the Commission against non-compliance by UPCL of the Commission’s Order dated 20.06.2016 for procurement of non-solar RECs equivalent to 7.50% of unmet non-solar RPO up to FY 2015-16.

In the matter of: Uttarakhand Power Corporation Ltd. … Petitioner

11.01.2017

In the matter of: Waiver and refund of penalty imposed by the Commission vide its Order dated 01.09.2005. AND

In the matter of: Uttarakhand Power Corporation Ltd. (UPCL) …Petitioner