In the matter of:
Suo-moto proceedings in the matter of provision of Green Power Tariff at Airport Authority of
India’s Airports in Uttarakhand.
AND
Suo-moto proceedings in the matter of billing of PTW consumers. In the matter of:
Uttarakhand Power Corporation Ltd.
...........Respondent
25.09.2023
In the matter of:
Determination of additional surcharge in accordance with the provisions of UERC (Terms and
Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising
out of its obligation to supply electricity to the open access consumers for the period October
2023 to March 2024.
AND
Uttarakhand Power Corporation Limited. (UPCL)
...........Petitioner
15.09.2023
In the matter of:
Application seeking approval of the Draft Power Purchase Agreement between Uttarakhand
Power Corporation Limited and UJVN Limited for Madhyamaheshwar Small Hydro Plant (3x5
MW). In the matter of:
Uttarakhand Power Corporation Ltd.
...........Petitioner AND In the matter of:
UJVN Ltd.
...........Respondent
15.09.2023
Petition No. 21 of 2022
In the matter of:
Petition seeking adjustment of tariff for Tanga Small Hydro Power Project (5 MW) of M/s
Himalaya Hydro Power Pvt. Ltd. due to additional capital expenditure necessitated due to the
catastrophic damage caused to the plant, as per Section 61 and 62 of the Electricity Act, 2003 read
with Regulation 14(7) of UERC (Tariff and Other Terms for Supply of Electricity from Renewable
Energy Sources and non-fossil fuel based Co-generating Stations) Regulation, 2018 as amended
from time to time.
Petition No. 22 of 2022
In the matter of:
Petition seeking adjustment of tariff for Motighat Small Hydro Power Project (5 MW) of M/s
Himalaya Hydro Power Pvt. Ltd. due to additional capital expenditure necessitated due to the
catastrophic damage caused to the plant, as per Section 61 and 62 of the Electricity Act, 2003 read
with Regulation 14(7) of UERC (Tariff and Other Terms for Supply of Electricity from Renewable
Energy Sources and non-fossil fuel based Co-generating Stations) Regulation, 2018 as amended
from time to time.
In the matter of:
M/s Himalaya Hydro Pvt. Ltd.
...........Petitioner AND In the matter of:
Uttarakhand Power Corporation Ltd.
...........Respondent
05.09.2023
In the matter of:
Petition seeking approval of capital investment for Supply Installation Testing
and Commissioning (SITC) of 220kV XLPE Armoured Power Cable with all
accessories including dismantling of existing oil filled cable at Chibro
Powerhouse under Section 61 and 86 of the Electricity Act, 2003 read with the
relevant regulations and guidelines of the Commission.
AND In the matter of:
Managing Director,
UJVN Limited,
“UJJWAL”, Maharani Bagh, GMS Road,
Dehradun.
...........Petitioner
05.09.2023
In the matter of:
Application seeking approval for the investment on the project covering the
construction of 01 no. new 33/11 kV Substation alongwith its associated 33 kV and
11 kV line at Sarkada Sitarganj (U.S. Nagar). AND In the matter of:
Managing Director,
Uttarakhand Power Corporation Ltd.,
Victoria Cross Vijeyta Gabar Singh Bhawan,
Kanwali Road, Dehradun.
...........Petitioner
01.09.2023
In the matter of:
Petition under Section 62 and 84 of the Electricity Act, 2003 read with Regulation 50(6) of the Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2018 & 2021 for recovery of under recovered energy charges due to shortfall in energy generation for reasons beyond the control of generating station during the FY 2020-21, FY 2021-22 and FY 2022-23 in respect of Budhil Hydro Power Project (BHEP). AND In the matter of:
M/s Greenko Budhil Hydro Power Pvt. Ltd.
...........Petitioner AND In the matter of:
Uttarakhand Power Corporation Ltd.
...........Respondent
01.09.2023
In the matter of:
Investment Approval for “Increasing Capacity of 132 kV Substation Bazpur from 1x80+1X40 MVA to 2x80 MVA and of 132 kV Substation Ramnagar from (1x20+1x40) MVA to 2x40 MVA”. AND In the matter of:
Power Transmission Corporation of Uttarakhand Limited. (PTCUL)
...........Petitioner
16.08.2023
In the matter of:
Petition seeking to allow approximate cumulative capacity of 246.5 MW to be allotted to eligible applicants against ground mounted solar power plants having capacity size of 20/25/50/100/ 200 kW under the scheme Mukhyamantri Saur Swarojgar Yojna at prefixed tariff of Rs. 4.49/kWh OR as per the gross generic tariff for Solar PV plants decided by the Commission for FY 2023-24 whichever is higher and subsequently fix such gross tariff for a tariff period of three years. AND In the matter of:
Uttarakhand Renewable Energy Development Agency
...........Petitioner AND In the matter of:
Uttarakhand Power Corporation Ltd.
...........Respondent
16.08.2023
In the matter of:
Suo-moto proceedings in the matter of request for seeking approval of revised payment terms for release of gas payments. AND In the matter of:
Uttarakhand Power Corporation Ltd.
M/s Sravanthi Energy Pvt. Ltd.
M/s Gama Infraprop (P) Ltd.
...........Respondents
14.08.2023
In the matter of:
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.07.2023 to 30.09.2023. AND In the matter of:
Uttarakhand Power Corporation Ltd.
...........Petitioner
21.06.2023
Petition No. 23 of 2023
In the matter of:
Application seeking approval of the Commission on the Draft Power Purchase Agreement
between Uttarakhand Power Corporation Limited and UJVN Ltd. for 6.25 MW Canal Bank
Ground Mounted Solar PV Plant at Dhalipur HEP, Uttarakhand.
Petition No. 24 of 2023
In the matter of:
Application seeking approval of the Commission on the Draft Power Purchase Agreement
between Uttarakhand Power Corporation Limited and UJVN Ltd. for 9.50 MW Canal Bank
Ground Mounted Solar PV Plant at Kulhal HEP, Uttarakhand.
Petition No. 25 of 2023
In the matter of:
Application seeking approval of the Commission on the Draft Power Purchase Agreement
between Uttarakhand Power Corporation Limited and UJVN Ltd. for 1.25 MW Canal Bank
Ground Mounted Solar PV Plant near Pashulok Barrage, Rishikesh, Uttarakhand.
In the matter of:
Uttarakhand Power Corporation Ltd.
...........Petitioner AND In the matter of:
UJVN Ltd.
...........Respondent
05.06.2023
In the matter of:
Petition for seeking approval for the investment on the following projects:
(a) Construction of 33 kV line from Generator’s Switching Station at VillageDuguda, Ranikhet (Almora) to 132/33 kV Substation Naini (Ranikhet) and 01
No. 33 kV "BAY" at 132/33 kV Substation Naini (Ranikhet) to evacuate Power
Generated by 03 No. Solar Photovoltaic Power Plant.
(b) Construction of 33 kV line from generator’s Switching Station VillagePatlibagad to 132/33 kV Substation Syalidhar (Almora) to evacuate Power
Generated by 06 No. Solar Photovoltaic Power Plants.
(c) Construction of 33/11 kV Substation alongwith its associated 33 kV line at
Nakot, Tehri (Garhwal).. AND In the matter of:
Managing Director,
Uttarakhand Power Corporation Ltd.,
Victoria Cross Vijeta Gabar Singh Urja Bhawan,
Kanwali Road, Dehradun.
...........Petitioner
12.05.2023
Petition No. 20 of 2023
In the matter of:
Application seeking prior approval of the Commission on the Draft Power Purchase Agreement
for procurement of power between Uttarakhand Power Corporation Ltd. and M/s Adani
Enterprises Ltd. under a Short-Term Power Purchase Agreement.
Petition No. 21 of 2023
In the matter of:
Application seeking prior approval of the Commission on the Draft Power Purchase Agreement
for procurement of power between Uttarakhand Power Corporation Ltd and M/s Tata Power
Trading Company Ltd. under a Short-Term Power Purchase Agreement.
Petition No. 22 of 2023
In the matter of:
Application seeking prior approval of the Commission on the Draft Power Purchase Agreement
for short term between Uttarakhand Power Corporation Ltd and M/s Ambitious Power Trading
Company Ltd. under a Short-Term Power Purchase Agreement. In the matter of:
Uttarakhand Power Corporation Ltd.
...........Petitioner AND In the matter of:
M/s Adani Enterprises Ltd.
M/s Tata Power Trading Company Ltd.
M/s Ambitious Power Trading Company Ltd.
...........Respondent
09.05.2023
In the matter of:
Petition seeking amendment in the UERC (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2021 in compliance of the Electricity (Amendment) Rules, 2022. AND In the matter of:
Uttarakhand Power Corporation Ltd. (UPCL)
...........Petitioner
28.04.2023
In the matter of:
Show Cause Notice-cum-Notice for Personal Hearing under Section 142 read with Section
149 of The Electricity Act, 2003, in the matter of non-compliance to Commission’s
Orders/directions with regard to delay in commissioning of 220 kV Baram Sub-station
and its associated line. AND In the matter of:
Managing Director, Power Transmission Corporation of Uttarakhand Ltd. (PTCUL
...........Respondent
25.04.2023
In the matter of:
Petition seeking approval of capital investment for protection works in
upstream and downstream side at Bin Super Passage of Chilla Power Channel. AND In the matter of:
Managing Director,
UJVN Limited,
“UJJWAL”, Maharani Bagh, GMS Road,
Dehradun.
...........Petitioner
12.04.2023
In the matter of:
Investment approval for DPR for 400/220 kV (2x315 MVA) GIS Substation Landhora and
its associated lines for inclusion in the Transmission Project of PTCUL Transmission Plan
under UTSDIP Scheme under ADB Funding in place of 400/220 kV AIS Substation
Landhora and its associated lines. AND In the matter of:
Power Transmission Corporation of Uttarakhand Limited (PTCUL).
Dehradun.
...........Petitioner
12.04.2023
In the matter of:
Petition seeking approval of capital investment for procurement of one
number 132/11 kV 20 MVA Generator Transformer for Dhalipur Powerhouse. AND In the matter of:
Managing Director,
UJVN Limited,
“UJJWAL”, Maharani Bagh, GMS Road,
Dehradun.
...........Petitioner
12.04.2023
In the matter of:
Petition for approval of capital investment on refurbishment of damaged
Power Channel from Dakpathar Silt Ejector to intake of Dhalipur Power
House. AND In the matter of:
Managing Director,
UJVN Limited,
“UJJWAL”, Maharani Bagh, GMS Road,
Dehradun.
...........Petitioner
03.04.2023
In the matter of:
Determination of additional surcharge in accordance with the provisions of UERC (Terms and
Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising
out of its obligation to supply electricity to the open access consumers for the period April 2023
to September 2023. AND In the matter of:
Uttarakhand Power Corporation Limited. (UPCL)
...........Petitioner
03.04.2023
In the matter of:
Approval of revised DPR for Construction of Separate Building for SLDC at 132 KV Substation, Majra Campus, Dehradun.
AND In the matter of:
Power Transmission Corporation of Uttarakhand Limited (PTCUL)
...........Petitioner
13.03.2023
In the matter of:
Application seeking approval of the Commission for advance and return energy banking to M/s
Uttar Haryana Bijli Vitran Nigam (through Haryana Power Purchase Centre (HPPC)) under an
Energy Banking Agreement with Uttarakhand Power Corporation Ltd.
In the matter of:
Uttarakhand Power Corporation Ltd.
...........Petitioner AND In the matter of:
M/s Uttar Haryana Bijli Vitran Nigam Ltd.
...........Respondent
03.03.2023
In the matter of:
Petition seeking prior approval of the Commission for Advance & Return energy Banking to M/s Arunachal Pradesh Power Corporation Pvt. Ltd. under an Energy Banking Agreement with Uttarakhand Power Corporation Ltd.
AND In the matter of:
Uttarakhand Power Corporation Ltd.
...........Petitioner & In the matter of:
M/s Arunachal Pradesh Power Corporation Pvt. Ltd.
...........Respondent
01.03.2023
In the matter of:
Review/Reconsideration petition filed under Regulation 54 of the UERC (Conduct of Business) Regulations, 2014 for removal of difficulty and review of the Order dated 22.09.2021 passed by UERC in the matter of Hon’ble APTEL Order dated 02.03.2020 in Appeal No. 18 of 2016 pertaining to 22.5 MW SHP of M/s Swasti Power Ltd.
AND In the matter of:
Uttarakhand Power Corporation Ltd. (UPCL),
Victoria Cross Vijeta Gabar Singh Urja Bhawan,
Kanwali Road, Dehradun.
...........Petitioner & In the matter of:
M/s Swasti Power Limited.
...........Respondent
20.02.2023
In the matter of:
Miscellaneous Application filed by Shri Chandrakant Singh Rawat (Innovative Solutions)
seeking deemed generation claims due to late connectivity of its 500 kW Solar Power
Plant with the grid and loss of generation due to outages/interruptions of more than 50
hours in a year.
AND In the matter of:
Mr. Chandrakant Singh Rawat
(Innovative Solutions),
188/1 Vasant Vihar, opp. Electricity Office,
Dehradun.
...........Petitioner & In the matter of:
1. Managing Director, UPCL, Victoria Cross Vijeta Gabar Singh Bhawan,
Kanwali Road, Dehradun.
2. Executive Engineer, Electricity Distribution Division,
Bhagwanpur, UPCL, Haridwar.
...........Respondent
20.02.2023
In the matter of:
Petition filed by UJVN Ltd. Under Section 86(1)(c), (e), (f) and (k) read with Section 30 of the
Electricity Act 2003 and Regulations 41(1) of UERC (Tariff and Other Terms for Supply of
Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations)
Regulations, 2018 seeking permission of the Commission to connect the Petitioner’s Suringad (5
MW) small hydro plant from 33/11 Darati S/s of UPCL.
In the matter of:
Managing Director, UJVN Limited “UJJWAL”, Maharani Bag, GMS Road, Dehradun
...........Petitioner AND In the matter of:
1. Managing Director, Uttarakhand Power Corporation Ltd. (UPCL)
2. Managing Director, Power Transmission Corporation of Uttarakhand Ltd. (PTCUL)
3. M/s Himalaya Hydro Private Limited.
...........Respondent
13.02.2023
In the matter of:
Petition for prior approval of Additional Capital Works on Unit No. 1 of (3x66
MW) Ramganga HEP of UJVN Ltd. under Section 61 and 86 of the Electricity Act,
2003 read with the relevant regulations and guidelines of the Commission. AND In the matter of:
Uttarakhand Power Corporation Ltd. (UPCL)
...........Petitioner
13.02.2023
In the matter of:
Petition for relaxation in balance quantum of Renewable Purchase Obligation of FY 2021-22 not
met to the tune of 25.61 MUs (Non-Solar) and 350.49 MUs (Solar) as per the provisions of UERC
(Compliance of Renewable Purchase Obligation) Regulations, 2010 and application seeking
amendment in the said Regulation in the light of new order of Ministry of Power, GoI issued on
dated 22.07.2022 read alongwith its Corrigendum dated 19.09.2022.
In the matter of:
Uttarakhand Power Corporation Ltd. (UPCL)
...........Petitioner AND In the matter of:
Uttarakhand Renewable Energy Development Agency
...........Respondent
13.02.2023
In the matter of:
Application seeking prior approval of the Commission on the Draft Power Purchase Agreement
for short term between Uttarakhand Power Corp. Ltd. and M/s Tata Power Trading Company
Ltd. (TPTC Ltd.) under an Energy Banking Agreement with Uttarakhand Power Corporation
Ltd.
In the matter of:
Uttarakhand Power Corporation Ltd.
...........Petitioner AND In the matter of:
M/s Tata Power Trading Company Ltd.
...........Respondent
13.02.2023
In the matter of:
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the
consumers for the period from 01.01.2023 to 31.03.2023.
In the matter of:
Uttarakhand Power Corporation Ltd.
...........Petitioner
06.01.2023
In the matter of:
Review/Reconsideration petition filed by Power Transmission Corporation of Uttarakhand Ltd., seeking review of the order dated 14.10.2022 passed in the matter of Waiver of Supervision Charges for upgradation works of 220 kV D/C Mahuakhedaganj-Kashipur including LILO of SEPL by replacement of ACSR Zebra Conductor with high capacity ACCC Conductor to be executed by M/s SEPL as per Commission Order dated 05.03.2021.
AND In the matter of:
Power Transmission Corporation of Uttarakhand Limited
Registered Office: Vidyut Bhawan,
Saharanpur Road, Dehradun.
...........Petitioner AND In the matter of:
M/s Sravanthi Energy Private Limited
Registered Office: 7th Floor, Block -B,
Building Number 9, DLF Cyber City,
DLF Phase III, Gurugram - 122 002,
Haryana, India.
...........Respondent
29.11.2022
In the matter of:
Application seeking approval of the investment on the Construction of 33 kV line (Underground and Overhead Lines) in Haridwar and US Nagar District of Uttarakhand.
AND In the matter of:
Managing Director,
Uttarakhand Power Corporation Ltd.,
Victoria Cross Vijeyta Gabar Singh Bhawan,
Kanwali Road, Dehradun.
...........Petitioner
21.11.2022
In the matter of:
Application seeking approval of the Commission on the draft Power Purchase Agreement for medium term power purchase between Uttarakhand Power Corporation Limited and M/s NTPC Vidyut Vyapar Nigam Ltd. AND In the matter of:
Uttarakhand Power Corporation Ltd.
...........Petitioner and In the matter of:
M/s NTPC Vidyut Vyapar Nigam Ltd.
...........Respondent
15.11.2022
In the matter of:
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2022 to 31.12.2022. AND In the matter of:
Uttarakhand Power Corporation Ltd.
...........Petitioner
11.11.2022
In the matter of:
Petition for approval of Draft Amended Metering Communication & Data Acquisition
Requirements (MCDAR) for Intra-State Power System of Uttarakhand after incorporating
amendments as per CEA (Installation & Operation of Meters) (Amendments),
Regulations, 2019 & 2022 in pursuance to Regulation 8.1 of UERC (State Grid Code)
Regulations, 2016 and Regulation 10 of UERC (Conduct of Business) Regulations, 2014. AND In the matter of:
Power Transmission Corporation of Uttarakhand Ltd.,
‘Vidyut Bhawan’, Majra, Dehradun.
...........Petitioner ANNEXURE-1
11.11.2022
In the matter of:
Petition seeking determination of project specific tariff for 1.5 MW (2 X 750 kW) Dunao Small Hydro Power Station under Section 62 and 86 of the Electricity Act, 2003 read with Regulation 13 of Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Nonconventional and Renewable Energy Sources) Regulations, 2013. AND In the matter of:
Uttarakhand Jal Vidyut Nigam Ltd. …
...........Petitioner & In the matter of:
Uttarakhand Power Corporation Ltd.
...........Respondent
10.11.2022
In the matter of:
Petition seeking utilization of 220 kV S/C dedicated transmission line of M/s Greenko Budhil HEP till 30.11.2022 or commissioning of 400 kV D/c Transmission line, whichever is earlier, for evacuating power from generating stations operating in Ravi Basin, Himachal Pradesh viz. SHP upto 31 MW and from 180 MW Bajoli Holi HEP upto 120 MW, using 2x315 MVA, 400/220/33 kV GIS Pooling Station at Lahal, 220 kV S/C transmission line from Lahal connecting to 220 kV side of S/s at Budhil HEP on the same Terms of Use (Alternative-A) as determined by the Commission vide Order dated 04.12.20202 read with Order dated 30.06.2021. AND In the matter of:
1. Himachal Pradesh Power Transmission Corporation Limited
2. Himachal Pradesh State Electricity Board Limited
3. M/s GMR Bajoli Holi Hydro Power Pvt. Ltd.
...........Petitioners & In the matter of:
1. Uttarakhand Power Corporation Ltd.
2. M/s Greenko Budhil Hydro Power Pvt. Ltd.
3. State Load Dispatch Centre, Uttarakhand (SLDC)
...........Respondents
09.11.2022
In the matter of:
Petition for approval of Provisional Tariff for Vyasi Hydro Power Project (2x60 MW)
under Section 62 and 86 of the Electricity Act, 2003 read with the relevant regulations
and guidelines of the Hon’ble Commission. AND In the matter of:
UJVN Limited,
“UJJWAL”, Maharani Bagh, GMS Road,
Dehradun.
...........Petitioner & In the matter of:
Uttarakhand Power Corporation Ltd.,
Victoria Cross Vijeta Gabar Singh Bhawan,
Kanwali Road, Dehradun
...........Respondent
03.11.2022
In the matter of:
Suo-moto proceedings initiated by the Commission in the matter of Show Cause
Notice issued vide letter dated 27.01.2022 and in the matter of non-compliance of
the Commission’s directions issued during the meeting held on 21.08.2020 in the
Commission’s office for reviewing the status of construction of Bill Collection
Centres.
And In the matter of:
Non-compliance of the Commission’s directions issued during the meeting held
on 28.04.2022 in the Commission’s office for reviewing the progress of capital
works approved by the Commission for UPCL
& In the matter of: Managing Director,
Uttarakhand Power Corporation Ltd.,
Victoria Cross Vijeta Gabar Singh Urja Bhawan,
Kanwali Road, Dehradun.
.........Respondent
19.10.2022
In the matter of:
Petition seeking approval for increasing the Continuous Supply Surcharge (CSS) as approved by the Commission in the Tariff Order for FY 2022-23.
And In the matter of:
Uttarakhand Power Corporation Limited. (UPCL)
.........Petitioner
19.10.2022
In the matter of:
Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising out of its obligation to supply electricity to the open access consumers for the period October 2022 to March 2023.
And In the matter of:
Uttarakhand Power Corporation Limited. (UPCL)
.........Petitioner
14.10.2022
In the matter of:
Waiver of Supervision charges for upgradation works of 220 KV D/C Mahuakhedaganj–Kashipur including LILO of SEPL by replacement of ACSR Zebra Conductor with high capacity ACCC Conductor to be executed by the Petitioner as per UERC order dated 05.03.2021.
In the matter of:
M/s Sravanthi Energy Private Limited
Registered Office: 7th Floor, Block -B,
Building Number 9, DLF Cyber City,
DLF Phase III, Gurugram - 122 002,
Haryana, India.
.........Petitioner AND In the matter of:
Power Transmission Corporation of Uttarakhand Limited
Registered Office: Vidyut Bhawan,
Saharanpur Road, Dehradun.
. .........Respondent
28.09.2022
In the matter of:
Petition filed by Shri Chandrakant Singh Rawat (Innovative Solutions) seeking deemed
generation claims due to late connectivity of its 500 kW Solar Power Plant with the grid
and due to loss of generation because of outages/interruptions of more than 50 hours in
a year.
In the matter of:
Mr. Chandrakant Singh Rawat (Innovative Solutions),
188/1 Vasant Vihar, Opp. Electricity Office,
Dehradun.
.........Petitioner AND In the matter of:
1. Managing Director, UPCL, Victoria Cross Vijeta Gabar Singh Bhawan,
Kanwali Road, Dehradun.
2. Executive Engineer, Electricity Distribution Division,
Bhagwanpur, UPCL, Haridwar.
. .........Respondent
28.09.2022
In the matter of:
Waiver of supervision charges for upgradation works of 220 KV D/C Mahuakhedaganj–
Kashipur including LILO of SEPL by replacement of ACSR Zebra Conductor with high capacity
ACCC Conductor as per UERC order dated 05.03.2021 made by Sravanthi Energy Pvt Ltd under
Section 86 of the Electricity Act, 2003 read with Regulation 40 of the Uttarakhand Electricity
Regulatory Commission (Conduct of Business) Regulations, 2014 and the relevant provisions of
UERC MYT Regulations, 2018.
In the matter of:
M/s Sravanthi Energy Private Limited
Registered Office: 7th Floor, Block -B, Building Number 9, DLF Cyber City, DLF Phase III,
Gurugram - 122 002, Haryana, India
.........Petitioner AND In the matter of:
Managing Director,
Power Transmission Corporation of Uttarakhand Limited (PTCUL),
Vidyut Bhawan, Saharanpur Road, Dehradun, Uttarakhand
. .........Respondent
28.09.2022
In the matter of:
Petition seeking approval of the Commission on Deviation in Power Purchase Costs and Removal
of Difficulty for allowing Recovery of Incremental Power Purchase Cost and compliance thereof to
directives issued under Multi Year Tariff Order.
In the matter of:
Uttarakhand Power Corporation Ltd. .........Petitioner
27.09.2022
In the matter of:
Revision in Miscellaneous Charges as approved vide UERC’s Tariff Order dated
31.03.2022 for FY 2022-23. And In the matter of:
Managing Director,
Uttarakhand Power Corporation Ltd. (UPCL),
VCV Gabar Singh Urja Bhawan,
Kanwali Road, Dehradun .........Petitioner
19.09.2022
In the matter of:
Petition for review of the Commission’s Order dated 22.06.2022 on application for approval of
draft Power Purchase Agreement for short term power purchase between Uttarakhand Power
Corporation Limited and M/s NTPC Vidyut Vyapar Nigam Limited.
In the matter of:
Uttarakhand Power Corporation Ltd. .........Petitioner
12.09.2022
In the matter of:
Petition seeking removal of difficulty in implementation of modified Time of Day metering as
provided in clause 6.1.3.5 of the Tariff Order dated 31.03.2022 for FY 2022-23.
AND In the matter of:
Uttarakhand Power Corporation Ltd.
.........Petitioner
12.09.2022
In the matter of:
Unplanned and irregular load shedding/curtailment of power by
Uttarakhand Power Corporation Limited during the period 01st of March 2022
to 30th June 2022 and being continued till date.
AND In the matter of:
M/s Galwalia Ispat Udyog (P) Limited,
Narayan Nagar Industrial Area,
Bajpur Road, Kashipur,
Udham Singh Nagar.
.........Petitioner & In the matter of:
Managing Director,
Uttarakhand Power Corporation Ltd. (UPCL),
Victoria Cross Vijeta Gabar Singh Urja Bhawan,
Kanwali Road, Dehradun
. .........Respondent
02.09.2022
In the matter of:
Application seeking approval of the Draft Power Purchase Agreement between Uttarakhand
Power Corporation Limited and UJVN Limited for its Suringad-II Small Hydro Power Plant
(2X2.25 MW).
AND In the matter of:
Uttarakhand Power Corporation Ltd.
.........Petitioner AND In the matter of:
UJVN Ltd. .........Respondent
29.08.2022
In the matter of:
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.07.2022 to 30.09.2022.
AND In the matter of:
Uttarakhand Power Corporation Ltd.
.........Petitioner
25.08.2022
In the matter of:
Petition seeking adjustment of tariff for 5 MW Motighat Small Hydro Power Project of M/s Himalaya Hydro Pvt. Ltd., due to additional capital expenditure necessitated due to the catastrophic damage caused to the plant by the unprecedented natural calamity/flood (force majeure event) that occurred on July 2nd, 2018, under Section 61 and 62 of the Electricity Act, 2003 read with Regulation 14(7) of Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2018.
AND In the matter of:
M/s Himalaya Hydro Pvt. Ltd.
.........Petitioner AND In the matter of:
(Uttarakhand Power Corporation Ltd. .........Respondent
25.08.2022
In the matter of:
Petition seeking adjustment of tariff for 5 MW Tanga Small Hydro Power Project of M/s Himalaya Hydro Pvt. Ltd., due to additional capital expenditure necessitated due to the catastrophic damage caused to the plant by the unprecedented natural calamity/flood (force majeure event) that occurred on July 2nd, 2018, under Section 61 and 62 of the Electricity Act, 2003 read with Regulation 14(7) of Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2018.
AND In the matter of:
M/s Himalaya Hydro Pvt. Ltd.
.........Petitioner AND In the matter of:
(Uttarakhand Power Corporation Ltd. .........Respondent
22.08.2022
In the matter of:
Petition seeking grant of permission to connect 33 kV dedicated line from 15
MW Captive Solar Power Plant to the stepdown side of 132/33 kV switchyard
of Kashi Vishwanath Steels Pvt. Ltd. at 33 kV level so that continuous support
essentially required from the grid for reference voltage and frequency for
synchronization of grid tied solar inverters be obtained.
AND In the matter of:
M/s Kashi Vishwanath Steels Pvt. Ltd.,
Narain Nagar Industrial Estate,
Bazpur Road, Kashipur-244713
.........Petitioner AND In the matter of:
(1) Uttarakhand Power Corporation Ltd. (UPCL),
VCV Gabar Singh Urja Bhawan, Kanwali Road, Dehradun
(2) Power Transmission Corporation of Uttarakhand Ltd. (PTCUL),
Vidyut Bhawan, Majra, Dehradun
(3) State Load Dispatch Centre (SLDC),
‘Vidyut Bhawan’, Majra, Dehradun
(4) Uttarakhand Renewable Energy Development Agency (UREDA),
Urja Park Campus, Industrial Area, Patel Nagar, Dehradun .........Respondents
20.07.2022
In the matter of:
Non-compliance of Sub-Section 3 of Section 43 of the Electricity Act, 2003 and
Regulation 3.3.3 (17) & Regulation 3.3.3 (19) of UERC (The Electricity Supply
Code, Release of New Connections and Related Matters) Regulations, 2020.
& In the matter of:
Non-compliance of Commission's directions issued vide Commission's Order dated March 10, 2022 pertaining to delay in release of new L T connections. AND In the matter of:
Uttarakhand Power Corporation Ltd.,
VCV Gabar Singh Bhawan, Kanwali Road,
Dehradun.
20.07.2022
In the matter of:
In the Matter of: Petition to relax/waive or vary the provisions of UERC (Release
of New LT Connections, Enhancement and Reduction of Loads) Regulations,
2007 and UERC (Release of New LT Connections, Enhancement and Reduction
of Loads) Regulations, 2013 whereby the penalty was imposed in the matter of
delay in release of new LT service connections for the period of F.Y. 2008-09 to
F.Y. 2018-19 and upto Aug-2019. [Petition No. 30 of 2020] &
Petition for extension of time for compliance of directions given by Hon'ble
Commission vide order dated 07.01.2020 passed in the matter of
relaxing/waiving or varying the provisions of UERC (Release of New LT
Connections, Enhancement and Reduction of Loads) Regulations, 2007 and
UERC (Release of New LT Connections, Enhancement and Reduction of Loads)
Regulations, 2013 whereby the penalty was imposed in the matter of delay in
release of new L T service connections for the period of FY 2008-09 to FY 2018-19
and upto Aug-2019 and for suspension of Standards of Performance during the
Covid-19 pandemic period and accordingly waive the requirement of
submitting various periodical reports. [Petition No. 20 of 2020]
And In the matter of:
Uttarakhand Power Corporation Ltd.,
VCV Gabar Singh Bhawan, Kanwali Road,
Dehradun. .........Petitioner
20.07.2022
In the matter of:
Investment Approval of:
(a) Work of Construction of 132 kV & 66 kV Bays and installation of 3x20 MVA,
132/66 kV Transformer at 132 kV Substation Simli.
(b) Construction of 66 kV DIC LILa Line of 66 kV Karanprayag-Kothiyalsain line at
132 k V Substation Simli.
And In the matter of:
Power Transmission Corporation of Uttarakhand Limited (PTCUL)
06.07.2022
In the matter of:
Payment of Penalty as per sub-section 3 of Section 43 of the Electricity Act, 2003 and sub-Regulation 12 of Regulation 5 of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007/sub-Regulation 14 of Regulation 5 of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013, Commission’s directions issued vide Order dated 05.07.2016, 09.05.2017 and Commission’s directions issued vide Order dated 17.01.2018.
& In the matter of:
Petition to relax/waive or vary the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013 whereby the penalty was imposed in the matter of delay in release of new LT service connections for the period of F.Y. 2008-09 to F.Y. 2018-19 and upto Aug-2019. [Petition No. 30 of 2020]
And In the matter of:
Petition for extension of time for compliance of directions given by Hon’ble Commission vide Order dated 07.01.2020 passed in the matter of relaxing/waiving or varying the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013 whereby the penalty was imposed in the matter of delay in release of new LT service connections for the period of FY 2008-09 to FY 2018-19 and upto Aug-2019 and for suspension of Standards of Performance during the Covid-19 pandemic period and accordingly waive the requirement of submitting various periodical reports. [Petition No. 20 of 2020]
& In the matter of:
Suo-moto proceedings initiated by the Commission in the matter of non-compliance of the Commission’s directions issued vide letter dated 01.11.2021 pertaining to submission of Periodical Reports as per provisions of the Regulations.
And In the matter of:
Uttarakhand Power Corporation Limited
.........Petitioner
22.06.2022
In the matter of:
Application seeking approval of the Commission on the draft Power Purchase Agreement for short
term power purchase between Uttarakhand Power Corporation Limited and M/s NTPC Vidyut
Vyapar Nigam Ltd.
. In the matter of:
Uttarakhand Power Corporation Limited
.........Petitioner AND In the matter of:
M/s NTPC Vidyut Vyapar Nigam Ltd.
.........Respondent
22.06.2022
In the matter of:
Application seeking approval of the Draft Power Purchase Agreement between Uttarakhand
Power Corporation Limited and UJVN Limited for its Kaliganga-II Small Hydro Power Plant
(2X2.25 MW). In the matter of:
Uttarakhand Power Corporation Ltd.
.........Petitioner AND In the matter of:
UJVN Ltd.
.........Respondent
29.06.2022
In the matter of:
Petition for review of the Commission’s Order dated 31.03.2022 on True up for FY 2020-21,Annual Performance Review for FY 2021-22 and Annual Revenue Requirement for FY 2022-23.. In the matter of:
Uttarakhand Power Corporation Ltd.
.........Petitioner
27.06.2022
In the matter of:
Petition for issuing necessary directions to UPCL to withdraw invoices issued against the
Petitioner imposing 25% additional Temporary Supply Tariff and issue revised invoices under
RTS-5 consumer category. In the matter of:
M/s Dhanshree Agro Products (P) Ltd.
.........Petitioner AND In the matter of:
Uttarakhand Power Corporation Ltd.
.........Respondent
27.05.2022
In the matter of:
Suo-moto proceedings in the matter of applicability of Rate Schedule RTS-4A, Agriculture Allied Activities in light of Hon’ble ATE Order dated 10.02.2022 in Appeal No. 339 of 2017.
In the matter of:
M/s Flex Food Limited & Ors.
.........Petitioner AND In the matter of:
Uttarakhand Power Corporation Ltd.
.........Respondent
09.05.2022
In the matter of:
Petition seeking utilisation of 220 kV S/C Dedicated Transmission Line of M/s Greenko Budhil Hydro Electric Project for evacuating power from Generating Stations operating in Ravi Basin, Himachal Pradesh viz. Small Hydro Electric Projects of upto 31 MW and from Bajoli Holi HEP of upto 120 MW, using 2x315 MVA, 400/220/33 kV GIS Pooling Station at Lahal, 220 kV S/C transmission line (1.8 km) from Lahal connecting to 220 kV side of S/S at Budhil HEP on the same Terms of Use (Alternative-A) as determined by the Commission vide its Order dated 04.12.2020 read with Order dated 30.06.2021.
In the matter of:
1. Himachal Pradesh Power Transmission Corporation Limited
2. Himachal Pradesh State Electricity Board Limited
3. M/s Bajoli Holi Hydro Power Pvt. Ltd.
.........Petitioners AND In the matter of:
1. Uttarakhand Power Corporation Ltd.
2. M/s Greenko Budhil Hydro Power Pvt. Ltd.
3. State Load Dispatch Centre, Uttarakhand (SLDC)
.........Respondents
05.05.2022
In the matter of:
Petition seeking extension of Control Period of the benchmark capital cost & generic tariff as approved by the Commission vide its order dated 11/05/2020, 30/09/2020 and 05/10/2020 till March 2023 for installation of Solar PV Power Plants under the scheme of Mukhyamantri Saur Swarojgar Yojna.
In the matter of:
Uttarakhand Renewable Energy Development Agency
.........Petitioner AND In the matter of:
Uttarakhand Power Corporation Ltd.
.........Respondent
05.05.2022
In the matter of:
Petition under Section 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 seeking extension of time for commissioning of the Solar project of M/s Parihar Constructions.
AND In the matter of:
Petition under Section 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 seeking extension of time for commissioning of the Solar project of Saraswati Devi.
In the matter of:
M/s Parihar Construction
Saraswati Devi
.........Petitioner AND In the matter of:
Uttarakhand Power Corporation Ltd.
Power Transmission Corporation of Uttarakhand Ltd.
Uttarakhand New and Renewable Energy Development Agency .........Respondents
04.05.2022
In the matter of:
Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2022-23 and onwards till reviewed/ revised by the Commission.
26.04.2022
In the matter of:
Petition for Approval of consolidated DPR amounting to Rs. 843.724 Crore funded
through ADB, assuming 90% grant in loan component for transmission projects under
UTSDIP Scheme. AND In the matter of:
Power Transmission Corporation of Uttarakhand Limited (PTCUL)
23.03.2022
In the matter of:
Filing of Miscellaneous Petition, inter alia amongst other grounds concerning refund of
Minimum Demand Charges (MDC)/ Late Payment Surcharge (LPS) charges by illegal
disconnection and for determining whether Minimum Demand Charges/ Late Payment
Surcharge can be imposed, if power supply is disconnected u/s 56(1), without proper and
clear 15 days notice u/s 181 r/w Section 50 of The Electricity Act, 2003. AND
M/s Uttaranchal Iron & Ispat Ltd.
.........Petitioner &
Uttarakhand Power Corporation Ltd.
.........Respondents
23.03.2022
In the matter of:
Petition under Section 86(1)(c), (e), (f) and (k) read with Section 30 of the Electricity Act 2003
and Regulations 41(1) of UERC (Tariff and Other Terms for Supply of Electricity from
Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations,
2018 seeking permission of the Commission to connect the Petitioner’s Suringad (5 MW) small
hydro plant from 33/11 Darati S/s of UPCL. In the matter of:
Managing Director, UJVN Limited “UJJWAL”, Maharani Bag, GMS Road, Dehradun
.........Petitioner AND In the matter of:
1. Managing Director, Uttarakhand Power Corporation Ltd. (UPCL)
2. Managing Director, Power Transmission Corporation of Uttarakhand Ltd. (PTCUL)
3. M/s Himalaya Hydro Private Limited. .........Respondents
22.03.2022
In the matter of:
Determination of additional surcharge in accordance with the provisions of UERC (Terms and
Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising
out of its obligation to supply electricity to the open access consumers for the period April 2022
to September 2022. AND In the matter of:
Uttarakhand Power Corporation Limited. (UPCL)
.........Petitioner
10.03.2022
In the matter of:
Suo-moto proceedings initiated by the Commission in the matter of noncompliance of the Commission’s directions issued vide letter dated 01.11.2021
pertaining to submission of Periodical Reports as per provisions of the
Regulations. & In the matter of:
Petition for extension of time for compliance of directions given by Hon’ble
Commission vide order dated 07.01.2020 passed in the matter of
relaxing/waiving or varying the provisions of UERC (Release of New LT
Connections, Enhancement and Reduction of Loads) Regulations, 2007 and
UERC (Release of New LT Connections, Enhancement and Reduction of Loads)
Regulations, 2013 whereby the penalty was imposed in the matter of delay in
release of new LT service connections for the period of FY 2008-09 to FY 2018-19
and upto Aug-2019 and for suspension of Standards of Performance during the
Covid-19 pandemic period and accordingly waive the requirement of
submitting various periodical reports. AND In the matter of:
Uttarakhand Power Corporation Ltd.,
VCV Gabar Singh Urja Bhawan, Kanwali Road,
Dehradun
.........Petitioner
10.03.2022
In the matter of:
Application seeking prior approval of the Commission on the draft short term Power Purchase
Agreements between Uttarakhand Power Corporation Limited and M/s PTC India Ltd., M/s Tata
Power Trading Company Ltd. and M/s NTPC Vidyut Vyapar Nigam Ltd.
In the matter of:
Uttarakhand Power Corporation Limited
.........Petitioner AND In the matter of:
M/s PTC India Ltd.
M/s Tata Power Trading Company Ltd.
M/s NTPC Vidyut Vyapar Nigam Ltd
...........Respondents
10.03.2022
In the matter of:
Suo-moto proceedings initiated by the Commission in the matter of Noncompliance of the sub-Regulations 3.3.3(15), 3.3.3(16), 3.4.3(10) & 3.4.3(11) of the
UERC (The Electricity Supply Code, Release of New Connections and Related
matters) Regulations, 2020 in the matter of ‘Availability of Three Phase Energy
Meters’.
AND In the matter of:
Uttarakhand Power Corporation Ltd.,
VCV Gabar Singh Urja Bhawan, Kanwali Road,
Dehradun
...........Petitioner
09.03.2022
In the matter of:
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the
consumers for the period from 01.01.2022 to 31.03.2022.
In the matter of:
Uttarakhand Power Corporation Ltd.
.........Petitioner
23.02.2022
In the matter of:
Application seeking approval on the Power Supply Agreements signed between UPCL and
M/s Solar Energy Corporation of India (SECI).
In the matter of:
Uttarakhand Power Corporation Ltd
.........Petitioner AND In the matter of:
M/s Solar Energy Corporation of India.
...........Respondent
11.02.2022
In the matter of:
Suo-moto proceedings initiated by the Commission in the matter of Show Cause Notice issued vide letter dated 27.01.2022 and in the matter of non-compliance of the Commission’s directions issued during the meeting held on 21.08.2020 in the Commission’s office for reviewing the status of construction of Bill Collection Centres.
AND In the matter of:
Managing Director,
Uttarakhand Power Corporation Ltd.,
Victoria Cross Vijeta Gabar Singh Urja Bhawan,
Kanwali Road, Dehradun
...........Respondent
03.02.2022
In the matter of:
Application seeking prior approval of Hon’ble Uttarakhand Electricity Regulatory Commission
on the Power Purchase Agreement to be executed between UPCL & UJVN Ltd for Vyasi HEP
(120 MW).
In the matter of:
Uttarakhand Power Corporation Ltd.
.........Petitioner AND In the matter of:
UJVN Ltd.
...........Respondent
03.02.2022
In the matter of:
Application seeking approval on the two Draft Power Purchase Agreements proposed to be entered
into between UPCL and M/s Sravanthi Energy Pvt. Ltd & M/s Gama Infraprop Pvt. Ltd.
In the matter of:
Uttarakhand Power Corporation Ltd.
.........Petitioner AND
M/s Sravanthi Energy Pvt. Ltd..........................Respondent No. 1
M/s Gama Infraprop Pvt. Ltd. ..........................Respondent No. 2
21.01.2022
In the matter of:
Application seeking prior approval of the Commission on the draft Power Purchase Agreement
between Uttarakhand Power Corporation Limited and M/s PTC India Ltd. on short term basis.
In the matter of:
Uttarakhand Power Corporation Limited
.........Petitioner In the matter of:
M/s PTC India Ltd.
...........Respondent
17.01.2022
In the matter of:
Petition seeking utilisation of 220 kV S/C dedicated Transmission Line of M/s Greenko Budhil
Hydro Electric Project for evacuating power from small hydro projects operating in Ravi Basin,
Himachal Pradesh of upto 26 MW and from Bajoli Holi HEP of upto 60 MW by connecting 2x315
MVA, 400/220/33 kV GIS Pooling Station at Lahal to 220 kV side of S/S at Budhil HEP on the
same Terms of Use (Alternative-A) as determined by the Commission vide its Order dated
04.12.2020 read with Suo-moto Order dated 30.06.2021.
In the matter of:
1. Himachal Pradesh Power Transmission Corporation Limited
2. Himachal Pradesh State Electricity Board Limited
3. M/s Bajoli Holi Hydro Power Pvt. Ltd. .........Petitioner
AND In the matter of:
1. Uttarakhand Power Corporation Ltd.
2. M/s Greenko Budhil Hydro Power Pvt. Ltd.
3. State Load Dispatch Centre, Uttarakhand (SLDC)
03.01.2022
In the matter of:
Application seeking approval for the investment on the project covering the construction
of 03 No. 33/11 kV Substations alongwith their associated 33 kV Line and 33 kV Line
from Solar Power Generator’s Switching S/s Kafaltana to 33/11 kV S/s Deghat.
AND In the matter of:
Uttarakhand Power Corporation Ltd.,
VCV Gabar Singh Bhawan, Kanwali Road,
Dehradun.
.........Petitioner
29.12.2021
In the matter of:
Petition for in-principle approval of capital investment under DRIP-II for strengthening
and up-gradation of 6 Dams/Barrages i.e. Ichari Dam, Maneri Dam, Joshiyara Barrage,
Asan Barrage, Dakpathar Barrage and Virbhadra Barrage of UJVN Ltd. under Section
61 and 86 of the Electricity Act, 2003 read with the relevant regulations and guidelines
of the Commission.
AND In the matter of:
Managing Director,
UJVN Limited,
“UJJWAL”, Maharani Bagh, GMS Road,
Dehradun.
.........Petitioner
14.12.2021
In the matter of:
Petition for in-principle approval of capital investment under DRIP-II for strengthening
and up-gradation of 6 Dams/Barrages i.e. Ichari Dam, Maneri Dam, Joshiyara Barrage,
Asan Barrage, Dakpathar Barrage and Virbhadra Barrage of UJVN Ltd. under Section
61 and 86 of the Electricity Act, 2003 read with the relevant regulations and guidelines
of the Commission.
AND In the matter of:
Managing Director,
UJVN Limited,
“UJJWAL”, Maharani Bagh, GMS Road,
Dehradun.
.........Petitioner
14.12.2021
In the matter of:
Petition under section 79 of the Electricity Act, 2003, read with Article 13 (“Change in Law”) of
the Power Purchase Agreement (“PPA”) dated 19.03.2012 executed between M/s Uttam Sugar
Mills Limited and UPCL.
In the matter of:
M/s Uttam Sugar Mills Ltd.
.........Petitioner
AND In the matter of:
Uttarakhand Power Corporation Ltd.
...........Respondent
09.12.2021
In the matter of:
Suo-Moto proceedings in the matter of clarification sought by Akshay Urja Association regarding
Performance Ratio which is one of the pre-requisites for declaration of commercial operation of
Solar PV Plants.
In the matter of:
Akshay Urja Association,
Uttarakhand Power Corporation Ltd.
Uttarakhand Renewable Energy Development Agency
...........Respondents
09.12.2021
In the matter of:
Petition under Section 142 of the Electricity Act, 2003 against UPCL authorities for nonimplementation and non-compliance of the Order dated 24.11.2020 passed by the Electricity
Ombudsman, Uttarakhand.
In the matter of: (1). Sh. Vivek Aggarwal S/o Mahendra Kumar R/o 09, Astley Hall, Rajpur Road,
Dehradun
.........Petitioner
AND (1). Managing Director, UPCL, Dehradun (2). Executive Engineer, Electricity Distribution Division (Central), 18- EC Road,
UPCL, Dehradun
...........Respondent
01.12.2021
In the matter of:
Petition seeking adjustment of tariff for Vanala Small Hydro Power Project (15 MW) unit of
M/s Him Urja Pvt. Ltd. in terms of the directions contained in Order of the Commission dated
08.07.2016 and also as per Section 61 and 62 of the Electricity Act, 2003 read with Regulation
16(3) & 25 of UERC (Tariff and other terms for Supply of Electricity from Renewable Energy
Sources and non-fossil fuel based Co-generating Stations) Regulation, 2010 as amended from
time to time and Regulation 3 & 4(4) of the UERC (Terms and Conditions for Truing up of
Tariff) Regulations, 2008.
In the matter of:
M/s Him Urja Pvt. Ltd. .........Petitioner
AND
Uttarakhand Power Corporation Ltd. ...........Respondent
29.11.2021
In the matter of:
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the
consumers for the period from 01.10.2021 to 31.12.2021.
In the matter of:
Uttarakhand Power Corporation Ltd. .........Petitioner
29.11.2021
In the matter of:
Petition for in-principle approval of capital investment under DRIP-II for strengthening and up-gradation of 6 Dams/Barrages i.e. Ichari Dam, Maneri Dam, Joshiyara Barrage, Asan Barrage, Dakpathar Barrage and Virbhadra Barrage of UJVN Ltd. under Section 61 and 86 of the Electricity Act, 2003 read with the relevant regulations and guidelines of the Commission.
AND In the matter of:
Managing Director,
UJVN Limited,
“UJJWAL”, Maharani Bagh, GMS Road,
Dehradun. .........Petitioner
26.11.2021
In the matter of:
Petition to the Commission for resolution of matter pertaining to Deviation
Settlement Mechanism (“DSM”) claim for 214 MW (225 MW ISO) for Phase I of
2x225 MW (450 MW ISO) Gas Based Combined Cycle Power Plant at Kashipur,
Uttarakhand filed by M/s Sravanthi Energy Pvt. Ltd. under Section 86 of the
Electricity Act, 2003 read with Regulation 59 of the Uttarakhand Electricity
Regulatory Commission (Conduct of Business) Regulations, 2014 and the
Regulations 13 & 16 of UERC (Deviation Settlement Mechanism and Related
Matters) Regulations, 2017. (Petition No. 36 of 2021) & In the matter of:
Petition for DSM claim by SLDC for 107 MW from 225 MW Gas Based Combined
Cycle Power Plant, at Mahuakhedaganj, Kashipur, District- Udhamsinghnagar,
Uttarakhand filed by M/s Gama Infraprop Pvt. Ltd. (Petition No. 37 of 2021).
AND In the matter of:
M/s Sravanthi Energy Private Limited,
Registered Office: 7th Floor, Block-B, Building Number 9,
DLF Cyber City, DLF Phase III
Gurugram- 122002, Haryana, India .........Petitioner
& In the matter of:
M/s Gama Infraprop Pvt. Ltd.,
Registered Office: M-3 (First Floor),
Hauz Khas, Aurobindo Marg,
New Delhi- 110016, .........Petitioner AND In the matter of:
(1) Managing Director,
Uttarakhand Power Corporation Ltd. (UPCL),
VCV Gabar Singh Urja Bhawan, Kanwali Road, Dehradun
Page 2 of 37
(2) Managing Director,
Power Trans. Corp. of Uttarakhand Ltd. (PTCUL),
Vidyut Bhawan, Majra, Dehradun
(3) Chief Engineer,
State Load Dispatch Centre (SLDC),
Vidyut Bhawan, Majra, Dehradun ...........Respondent
12.11.2021
In the matter of:
Petition for review of the Commission’s Order dated 11.06.2021 passed in Petition no. 21 of 2020
under Section 94(f) of the Electricity Act, 2003 read with Section 114 and Order 47 of the Civil
Procedure Code, 1908. In the matter of:
Shri. Digamber Singh Bisht .........Petitioner AND In the matter of:
Uttarakhand Power Corporation Ltd.,
Uttarakhand Renewable Energy Development Agency, ...........Respondent
Shri Dhirendra Singh Rawat .........Performa Opposite Party
12.10.2021
In the matter of:
Petition for in-principle approval of capital investment under DRIP-II for strengthening
and up-gradation of 6 Dams/Barrages i.e. Ichari Dam, Maneri Dam, Joshiyara Barrage,
Asan Barrage, Dakpathar Barrage and Virbhadra Barrage of UJVN Ltd. under Section
61 and 86 of the Electricity Act, 2003 read with the relevant regulations and guidelines
of the Commission. AND In the matter of:
Managing Director,
UJVN Limited,
“UJJWAL”, Maharani Bagh, GMS Road,
Dehradun. .........Petitioner
05.10.2021
In the matter of:
Determination of additional surcharge in accordance with the provisions of UERC (Terms
and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL
arising out of its obligation to supply electricity to the open access consumers for the period
October 2021 to March 2022. AND
Uttarakhand Power Corporation Limited. (UPCL) .........Petitioner
22.09.2021
In the matter of:
Hon’ble APTEL’s Judgement dated 02.03.2020 in Appeal No. 18 of 2016.
In the matter of:
M/s Swasti Power Ltd ...........Petitioner AND In the matter of:
Uttarakhand Power Corporation Ltd. (UPCL) ...........Respondent
21.09.2021
In the matter of:
Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2021-22 and onwards till reviewed/revised by the Commission. AND In the matter of:
Extension of the Control Period of the benchmark capital cost and generic tariff for the Solar PV Plants allowed to successful bidders by UREDA for development of Solar PV Plants having cumulative capacity of 200 MW and Solar PV Plant developers who have been allowed to execute PPA with UPCL with zero CFA for fulfilment of RPO compliance of UPCL.
17.09.2021
In the matter of:
Application seeking approval of Uttarakhand Electricity Regulatory Commission
(UERC) for investment on the work of construction of 10 nos. 33/11 KV GIS Substations
under Integrated Power Development Scheme (IPDS) Project of Ministry of Power, Govt.
of India. In the matter of:
Uttarakhand Power Corporation Ltd.,
VCV Gabar Singh Bhawan, Kanwali Road,
Dehradun.............Petitioner
02.09.2021
In the matter of:
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.07.2021 to 30.09.2021. In the matter of:
Uttarakhand Power Corporation Ltd............Petitioner
11.08.2021
In the matter of:
Petition seeking approval of the Commission for advance and return banking of power with M/s
GMR Energy Trading Ltd., M/s Arunachal Pradesh Power Corporation Pvt. Ltd., M/s Manikaran
Power Ltd., and M/s PTC India Ltd. under an energy banking arrangement with Uttarakhand
Power Corporation Ltd. In the matter of:
Uttarakhand Power Corporation Ltd............Petitioner
AND In the matter of:
M/s GMR Energy Trading Ltd.
M/s Arunachal Pradesh Power Corporation Pvt. Ltd.
M/s Manikaran Power Ltd.
M/s PTC India Ltd.
…..........Respondents
30.06.2021
In the matter of:
Petition under Section 86(1) (c), (f) and (k) read with Section 30, Section 39(2) (c), Section 40(a) and Section 42(1) of Electricity Act, 2003 seeking directions to Respondents to ensure efficient and effective evacuation of power from the Petitioner’s Motighat (5MW) and Tanga (5MW) small hydro plants using 33/11 kV Darati Sub-station. AND In the matter of:
M/s Himalaya Hydro Private Limited............Petitioner
AND In the matter of:
Uttarakhand Power Corporation Ltd. (UPCL)
....Respondent No. 1
Power Transmission Corporation of Uttarakhand Ltd. (PTCUL)
….Respondent No. 2
UJVN Ltd.
….Respondent No. 3
30.06.2021
In the matter of:
Suo-Moto Order on methodology for payment of transmission charges for using dedicated transmission line of M/s Greenko Budhil HEP by Himachal Pradesh State Electricity Board Ltd., for supply of power from SHPs of Himachal Pradesh till 30.09.2021 based on the minutes of meeting held on 15.01.2021 among Himachal Pradesh Power Transmission Corporation, Himachal Pradesh State Electricity Board Ltd., M/s Greenko Budhil Hydro Power Pvt. Ltd. and Uttarakhand Power Corporation Ltd.
16.06.2021
In the matter of:
Directions issued by the Government of Uttarakhand (GoU) under Section 108 of the
Electricity Act, 2003 for Exemption of consumption security charges for release of
temporary electricity connection at Covid Emergency Hospital established by DRDO at
Dr. Sushila Tiwari Medical College, Haldwani.
14.06.2021
In the matter of:
Petition under Section 86 (1) (a), Section 86(1)(f) read with Section 61(d) seeking directions to State
Load Despatch Centre of Uttarakhand to consider Scheduled Capacity as the Declared Capacity
in accordance with Section 32(2)(a) of the Electricity Act, 2003. AND In the matter of:
M/s Greenko Budhil Hydro Power Pvt. Ltd............Petitioner
AND In the matter of:
Uttarakhand Power Corporation Ltd. (UPCL)
State Load Dispatch Centre, Uttarakhand (SLDC) ... Respondent
11.06.2021
In the matter of:
Petition for issuing necessary directions for fixing the electricity tariffs as per FY 2015-16 for the
allocated Solar Power Plants and 40% additional tariff for the Solar PV plants installed in the
hilly terrain of Uttarakhand.
And In the matter of:
Sh. Digamber Singh Bisht
Sh. Dhirender Singh Rawat...........Petitioner
AND In the matter of:
Uttarakhand Power Corporation Ltd.
Uttarakhand Renewable Energy Development Agency ... Respondent
03.06.2021
In the matter of:
Approval of Capital Investment under Para 11 of the Transmission Licence for Construction of 10X6 MVA, 220/33 kV GIS Substation Baramwari (Rudrapur) & 220 kV D/C line on Single Zebra Conductor from interconnection point of Singoli Bhatwari HEPP to proposed 220 kV Baramwari (Rudrapur) Substation.
And In the matter of:
Power Transmission Corporation of Uttarakhand Limited (PTCUL) ...........Petitioner
02.06.2021
In the matter of:
Petition for recovery of charges collected by UJVN Ltd. for supply of
electricity made to the consumers of the State of Uttarakhand.
And In the matter of:
Uttarakhand Power Corporation Ltd. (UPCL),
VCV Gabar Singh Urja Bhawan,
Kanwali Road, Dehradun...........Petitioner
& In the matter of:
UJVN Limited,
“UJJWAL”, Maharani Bagh,
GMS Road, Dehradun ... Respondent
13.04.2021
In the matter of:
Suo moto proceeding for making consistent the time limits specified in clause (17),
(18), (20), (21), (22), (24) & (27)(c) of Regulation 7.5 under Regulation 10.3 (Power
to Remove of Difficulties) of UERC (State Grid Code) Regulations, 2016 and
Regulation 8(7) under Regulation 16 (Power to Remove Difficulties) of UERC
(Deviation Settlement Mechanism and Related Matters) Regulations, 2017 w.r.t.
CERC (Indian Electricity Grid Code) Regulations, 2010 (IEGC) and CERC
(Deviation Settlement Mechanism and related matters) Regulations, 2014 and
amendments issued from time to time.
And In the matter of:
(1) Managing Director,
Uttarakhand Power Corporation Ltd. (UPCL),
VCV Gabar Singh Urja Bhawan, Kanwali Road, Dehradun
(2) Chief Engineer,
State Load Dispatch Centre (SLDC),
Vidyut Bhawan, Majra,
Dehradun
(3) Managing Director,
Power Transmission Corporation of Uttarakhand Limited,
‘Vidyut Bhawan’, Majra,
Dehradun ..... Respondent
31.03.2021
In the matter of:
Petition to extend the Control Period of the benchmark capital cost and generic tariff as
declared by the Commission vide Order dated 01.02.2019, 18.09.2019 and 23.06.2020 upto
August 2021 for 283 nos. of Solar PV Plants (cumulative capacity of 203.75 MW) and Solar PV
plants developers who have been allowed to execute PPA with UPCL with zero CFA for
fulfilment of RPO compliance of UPCL.
In the matter of:
Uttarakhand Renewable Energy Development Agency ...........Petitioner
And In the matter of:
Uttarakhand Power Corporation Ltd. ... Respondent
23.03.2021
In the matter of:
Determination of additional surcharge in accordance with the provisions of UERC (Terms and
Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising
out of its obligation to supply electricity to the open access consumers for the period April 2021
to September 2021.
And
Uttarakhand Power Corporation Limited (UPCL) ...........Petitioner
17.03.2021
In the matter of:
Petition for seeking carry forward of estimated surplus of 320.62 MU (Non-Solar) and estimated
deficit of 110.28 MU (Solar) Renewable Purchase Obligation of FY 2020-21 as per the provisions of
UERC (Compliance of Renewable Purchase Obligation) Regulation, 2010.
AND In the matter of:
Uttarakhand Power Corporation Ltd. (UPCL)...........Petitioner
AND In the matter of:
Uttarakhand Renewable Energy Development Agency ...Respondent
05.03.2021
In the matter of:
Petition seeking permanent connectivity for 214 MW (225 MW ISO) Phase II of 2x214 MW (450 MW ISO) Gas Based Combined Cycle Power Plant at Kashipur, Uttarakhand without any State transmission charges/losses subject to investment in existing State transmission system (Mahuakheraganj S/s to Kashipur S/s with LILO of SEPL) to be made by Sravanthi Energy Pvt Ltd under Section 86 of the Electricity Act, 2003 read with Regulation 40 of the Uttarakhand Electricity Regulatory Commission (Conduct of Business) Regulations, 2014 and the relevant provisions of UERC MYT Regulations, 2018.
AND In the matter of:
MM/s Sravanthi Energy Private Limited ...........Petitioner
AND In the matter of:
Power Transmission Corporation of Uttarakhand Limited (PTCUL) ...Respondent
25.02.2021
In the matter of:
Compliance of Reports/Plans/Procedures by the Distribution Licensee as per the UERC (Distribution Code) Regulations, 2018.
AND In the matter of:
MSuo-moto proceedings initiated by the Commission in the matter of misleading submission made by the licensee against the compliance of Regulation 6.4 of the UERC (Distribution Code) Regulations, 2018.
AND In the matter of:
Uttarakhand Power Corporation Ltd. (UPCL) ...Respondent
13.01.2021
In the matter of:
Petition filed under Regulation 59 of Uttarakhand Electricity Regulatory Commission
(Conduct of Business) Regulations, 2014 and Regulation 103 & 104 of Uttarakhand
Electricity Regulatory Commission (MYT) Regulations,2018 for permanent
connectivity of M/s Gama Infraprop Pvt. Ltd., for 107 MW from 214 MW Gas Based
Combined Cycle Power Plant, Kashipur at 220 kV S/s Mahuakhedaganj.
AND In the matter of:
M/s Gama Infraprop Pvt. Ltd.
...........Petitioner AND In the matter of:
Power Transmission Corporation of Uttarakhand Limited (PTCUL) ...Respondent No. 1
Uttarakhand Power Corporation Ltd. (UPCL) ...Respondent No. 2
11.01.2021
In the matter of:
Application seeking approval for the investment on the project covering Construction
of 02 Nos. 33/11 kV Sub-Stations along with their associated 33 kV Underground Lines
at Laltaro & Jagjeetpur, Haridwar.
AND In the matter of:
Uttarakhand Power Corporation Ltd.,
Victoria Cross Vijeta Gabar Singh Urja Bhawan,
Kanwali Road, Dehradun.
...........Petitioner
08.12.2020
In the matter of:
Petition seeking approval on the draft plan to pass on the benefit in electricity tariff to the end
consumers of the State.
In the matter of:
Uttarakhand Power Corporation Ltd.
...........Petitioner
08.12.2020
In the matter of:
Application seeking approval of the Commission for investment on Under
grounding of HT & LT Electrical Networks in Haridwar Town under IPDS
Program- a flagship program of Ministry of Power under Govt. of India (GoI).
In the matter of:
Uttarakhand Power Corporation Ltd.,
VCV Gabar Singh Bhawan, Kanwali Road,
Dehradun.
...........Petitioner
04.12.2020
In the matter of:
Petition seeking determination of Term of Use for Utilisation of 220 kV S/c dedicated Transmission line of M/s Greenko Budhil Hydro Electrical Project for evacuation of power from Generating Station operating in Ravi Basin, Himachal Pradesh by connecting 2x315 MVA, 400/220/33 kV GIS Pooling Station at Lahal, Himachal Pradesh to 220 kV side of S/s at Budhil HEP through a 220 kV S/C transmission line from Lahal to Budhil.
In the matter of:
Himachal Pradesh Power Transmission Corporation Limited
Himachal Pradesh State Electricity Board Limited
...........Petitioners AND
Uttarakhand Power Corporation Ltd.
M/s Greenko Budhil Hydro Power Pvt. Ltd.
State Load Dispatch Centre, Uttarakhand (SLDC)
...........Respondents
03.12.2020
In the matter of:
Petition for review of the Tariff Order dated 18.04.2020 with respect to the truing up of Non-Tariff Income for the FY 2018-19.
In the matter of:
Sravanthi Energy Pvt. Ltd.
...........Petitioner AND
Uttarakhand Power Corporation Ltd.
...........Respondent
01.12.2020
In the matter of:
Revision of Order dated 23.07.2020 passed by the District Magistrate, Haridwar, in the matter
of payment of compensation of Rs. 2,35,549/- for damage to trees and Rs. 55,080/- for use of
land ignoring the mandate of law as enshrined in works of Licensee Rules 2006.
In the matter of:
1. Shri Hitler Saini, S/o Late Shri Satish Kumar,
2. Shri Ajay Saini S/o Late Shri Satish Kumar
3. Shri Rajkumar S/o Late Shri Satish Kumar
4. Shri Vishwadeep S/o Late Shri Satish Kumar
5. Smt Vedwati W/o Late Shri Satish Kumar
6. Smt Setho Saini W/o Late Shri Satish Kumar
...........Petitioner AND
1. The Executive Engineer, Power Transmission Corporation of Uttarakhand Ltd.,
220 kV Line Piran Kaliyar, Office, 26, Civil Line, Roorkee.
2. The District Magistrate, Haridwar.
...........Respondent
01.12.2020
In the matter of:
Revision of Order dated 23.07.2020 passed by the District Magistrate, Haridwar, deciding
Khasra No. 44 situated at Village Dheer Majara, Ahatmaal, Tehsil Bhagwanpur as the land
belonging to Gram Sabha and payment of compensation of Rs. 1,91,325 to the Gram Sabha.
In the matter of:
1. Shri Chandra Kiran S/o Shri Jagpal Singh
2. Shri Jagpal Singh S/o Late Shri Malhu Ram
...........Petitioner AND
1. The Executive Engineer, Power Transmission Corporation of Uttarakhand Ltd.,
220 kV Line Piran Kaliyar, Office, 26, Civil Line, Roorkee-247667
2. The District Magistrate, Haridwar-249401
3. Gram Pradhan, Gram Sabha, Hallu Majra, Tehsil Bhagwanpur,
District Haridwar
...........Respondent
20.11.2020
In the matter of:
Application seeking Review under Regulation 54 of UERC (Conduct of Business) Regulations, 2014 read with relevant provisions of the Electricity Act, 2003 for review of the Order dated 18.04.2020 passed by the Commission in the matter of Petition for approval for Revised Aggregate Revenue Requirement for FY 2002-21 alongwith true-up of FY 2018-19 and Annual Performance Review of FY 2019-20.
In the matter of:
Power Transmission Corporation of Uttarakhand Ltd.
...........Petitioner AND
Uttarakhand Power Corporation Ltd.(UPCL)
...........Respondent
11.11.2020
In the matter of:
Petition for review of the Commission’s Order dated 18.04.2020 on True up for FY 2018-19, Annual Performance Review for FY 2019-20 and Annual Revenue Requirement for FY 2020-21.
In the matter of:
Managing Director,
Uttarakhand Power Corporation Ltd.(UPCL)
...........Petitioner
04.11.2020
In the matter of:
Petition under Section 67(4) of the Electricity Act, 2003, in the matter of
dispute regarding release of connection by UPCL to an individual consumer
connected to the electrical network owned & operated by a
developer/builder.
In the matter of:
M/s Hero Realty Pvt. Ltd.,
264, Ground Floor, Okhla Industrial Estate, Phase-3,
New Delhi.
...........Petitioner AND In the matter of:
1. Managing Director,
Uttarakhand Power Corporation Ltd. (UPCL),
VCV Gabar Singh Urja Bhawan, Kanwali Road, Dehradun
2. Executive Engineer,
Uttarakhand Power Corporation Ltd. (UPCL),
Electricity Distribution Division, SIDCUL, Haridwar
3. Shri Suresh Kumar Srivastava
S/o Late Sh. Jagdish Prasad Srivastava,
R/o A-19/601, Haridwar Greens, Haridwar
4. President,
Haridwar Greens Residents’ Welfare Association (HGRWA),
Flat No.-101, Tower A-22, Haridwar Greens, Haridwar.
...........Respondent
29.10.2020
In the matter of:
Application seeking approval of the Commission on the Draft Power Purchase Agreement to be executed between Uttarakhand Power Corporation Limited and Uttarakhand Power Development & Construction Corp. Ltd.
In the matter of:
Uttarakhand Power Corporation Ltd.
...........Petitioner AND In the matter of:
Uttarakhand Power Development & Construction Corp. Ltd. (UPDCCL)
...........Respondent
07.10.2020
In the matter of:
Application for adjudication of dispute between Beta Infratech Private Limited and Uttarakhand
Power Corporation Limited in respect of termination of Power Purchase Agreement dated
01.03.2017 signed between the parties for Procurement of 107 MW of power on long term basis
In the matter of:
M/s Beta Infratech Private Limited
...........Petitioner AND In the matter of:
Uttarakhand Power Corporation Ltd.
...........Respondent
05.10.2020
In the matter of:
Petition to extend the Control Period of the benchmark capital cost and generic tariff as
declared by the Commission vide Order dated 11.05.2020, upto March, 2020 for upcoming
10,000 numbers of Grid connected Solar PV Power Plants of capacity 25 kWp (cumulative
capacity of 250 MW).
In the matter of:
Uttarakhand Renewable Energy Development Agency
...........Petitioner AND In the matter of:
Uttarakhand Power Corporation Ltd.
...........Respondent
30.09.2020
In the matter of:
Extension of the period of applicability of the benchmark capital cost and levellised generic tariff
issued by the Commission for Solar Energy based plants vide Suo-moto Order dated 07.06.2019 in
Petition No. 18 of 2019 (Suo-Moto) upto March, 2021.
22.09.2020
In the matter of:
Determination of additional surcharge in accordance with the provisions of UERC (Terms and
Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising
out of its obligation to supply electricity to the open access consumers for the period October
2020 to March 2021.
AND
Uttarakhand Power Corporation Limited. (UPCL)
...........Petitioner
15.09.2020
In the matter of:
Petition for seeking investment approval on the project for covering the construction of 02 nos. 33/11 kV Substations & their associated 24.30 Kms. 33 kV Line.
AND In the matter of:
Uttarakhand Power Corporation Limited. (UPCL),
V.C.V.G.S. Urja Bhawan, Kanwali Road,
Dehradun.
...........Petitioner
17.09.2020
In the matter of:
Petition seeking increase in ceiling limit of 1 MW applicable to Grid Interactive Rooftop and
Small Solar PV Plants to 2 MW under RE Regulations, 2018 for net metering arrangement.
AND
Petition seeking approval of the Commission for net metering for 2 MW Solar Energy Power
Plant at GE Dehradun.
In the matter of:
Military Engineer Services, Roorkee.
Military Engineer Services, Dehradun .......Petitioners
AND In the matter of:
Uttarakhand Power Corporation Ltd. (UPCL)
Uttarakhand Renewable Energy Development Agency (UREDA) ......Respondents
15.09.2020
In the matter of:
Suo-moto Order on the request of UPCL for determination of Tariff considering subsidy at the rate of 80% for the Solar Projects installed/to be installed under PM-Kusum Yojana.
03.09.2020
In the matter of:
Application seeking amendment in UERC Tariff Regulations, 2018.
AND In the matter of:
Uttarakhand Power Corporation Ltd. (UPCL) ...........Petitioner
29.07.2020
In the matter of:
Application seeking prior approval of the Commission on the draft Power Purchase Agreement
between Uttarakhand Power Corporation Limited and M/s Bhilangana Hydro Power Ltd. for
procuring Non-Solar RE Energy on short term basis.
In the matter of:
Uttarakhand Power Corporation Limited ...............Petitioner
AND In the matter of:
M/s Bhilangana Hydro Power Ltd ......... Respondent
20.07.2020
In the matter of:
Petition seeking approval of the Commission for advance and return banking of power with M/s Arunachal Pradesh Power Corporation Pvt. Ltd., M/s PTC India Ltd., M/s Kreate Energy (I) Pvt. Ltd. and M/s GMR Energy Trading Ltd. under an energy banking arrangement with Uttarakhand Power Corporation Ltd.
In the matter of:
Uttarakhand Power Corporation Limited ..........Petitioner In the matter of:
M/s Arunachal Pradesh Power Corporation Pvt. Ltd.
M/s PTC India Ltd.
M/s Kreate Energy (I) (P) Ltd.
M/s GMR Energy Trading Ltd. ..........Respondents
23.06.2020
In the matter of:
Time extension in scheduled commissioning date of Solar PV Plants to be developed by various developers in the State of Uttarakhand considering disruption due to lockdown on account of coronavirus (COVID-19) pandemic.
19.06.2020
In the matter of:
Determination of additional surcharge in accordance with the provisions of UERC (Terms and
Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising
out of its obligation to supply electricity to the open access consumers for the period April 2020
to September 2020. In the matter of:
Uttarakhand Power Corporation Limited
…Petitioner
19.06.2020
In the matter of:
Deployment of customised Renewable Purchase Obligation Compliance System (RPOCS) Web Tool in Uttarakhand.
09.06.2020
In the matter of:
Application seeking approval for inclusion of soft drink concentrate in seasonal industries
product list. In the matter of:
Uttarakhand Power Corporation Limited
…Petitioner
03.06.2020
In the matter of:
Application seeking approval for investment on the Implementation of Enterprise
Resource Planning (ERP) under Integrated Power Development Scheme (IPDS) of
Ministry of Power, Govt. of India.
AND In the matter of:
Uttarakhand Power Corporation Ltd.,
Victoria Cross Vijeta Gabar Singh Urja Bhawan,
Kanwali Road, Dehradun.
…Petitioner
22.05.2020
In the matter of:
Petition for seeking approval of the Commission for the investment on the
Implementation of Real Time Data Acquisition System (RTDAS) for
SAIFI/SAIDI measurement at 11 kV feeder level of 66 non-SCADA towns of
UPCL under Integrated Power Development Scheme (IPDS) of Ministry of
Power, Govt. of India.
AND In the matter of:
Uttarakhand Power Corporation Ltd.,
Victoria Cross Vijeta Gabar Singh Urja Bhawan,
Kanwali Road, Dehradun.
…Petitioner
11.05.2020
In the matter of:
Extension of the period of applicability of the benchmark capital cost and levellised generic tariff
issued by the Commission for Solar Energy based plants vide Suo-moto Order dated 07.06.2019 in
Petition No. 18 of 2019 (Suo-Moto).
11.03.2020
In the matter of:
Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju-III Small Hydro Power Project of Uttar Bharat Hydro Power Private Ltd.
AND In the matter of:
M/s Uttar Bharat Hydro Power Pvt. Ltd.
..........Petitioner
Uttarakhand Power Corporation Ltd. (UPCL)
..........Respondent No. 1
Power Transmission Corporation of Uttarakhand Ltd. (PTCUL)
..........Respondent No. 2
11.03.2020
In the matter of:
Petition to extend the settlement of Net Energy from billing period to yearly basis on captive use by Rooftop Solar PV generator under the NOC model.
AND In the matter of:
Uttarakhand Renewable Energy Development Agency
..........Petitioner
Uttarakhand Power Corporation Ltd. (UPCL)
..........Respondent
02.03.2020
In the matter of:
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the
consumers for the period from 01.01.2020 to 31.03.2020.
.
AND In the matter of:
Uttarakhand Power Corporation Ltd.
..........Petitioner
07.01.2020
In the matter of:
Petition to relax/waive or vary the provisions of UERC (Release of New LT
Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC
(Release of New LT Connections, Enhancement and Reduction of Loads) Regulations,
2013 whereby the penalty was imposed in the matter of delay in release of new LT
service connections for the period of F.Y. 2008-09 to F.Y. 2018-19 and upto Aug-2019.
AND In the matter of:
Uttarakhand Power Corporation Ltd. V.C.V. Gabar Singh Urja Bhawan, Kanwali Road,
Dehradun.
..........Petitioner
02.12.2019
In the matter of:
Representation/Petition under Section 67(4) of the Electricity Act, 2003, in the
matter of dispute regarding release of connection by UPCL to an individual
consumer connected to the electrical network owned & operated by a
developer/builder/Residential Welfare Association.
AND In the matter of:
M/s Hero Reality Pvt. Ltd.,
In the Matter of:
264, Ground Floor, Okhla Industrial Estate, Phase-3,
New Delhi ..........Petitioner &
(1) Managing Director,
Uttarakhand Power Corporation Ltd. (UPCL),
VCV Gabar Singh Urja Bhawan, Kanwali Road, Dehradun
(2) Executive Engineer,
Uttarakhand Power Corporation Ltd. (UPCL),
Electricity Distribution Division, SIDCUL, Haridwar
(3) Shri Suresh Kumar Srivastava,
S/o Late Sh. Jagdish Prasad Srivastava,
R/o A-19/601, Haridwar Greens, Haridwar ..........Respondents
02.12.2019
In the matter of:
Dispute between M/s Bhilangana Hydro Power Ltd and Power Transmission Corporation of Uttarakhand Limited, relating to ‘component A' that is, regarding to transmission charges for the use of intra-State transmission system for transmission of power from Bhilangana-III to Uttarakhand Power Corporation Ltd. through Tata Power Trading Company Ltd.
AND In the matter of:
M/s Bhilangana Hydro Power Limited (BHPL) ..........Petitioner &
Power Transmission Corporation of Uttarakhand Ltd. (PTCUL) ..........Respondents
15.11.2019
In the matter of:
Application for adjudication of dispute between Beta Infratech Private Limited and UPCL in
respect of termination of Power Purchase Agreement dated 01.03.2017 signed between Parties for
Procurement of 107 MW of power on long term basis from 225 MW (ISO) Gas Based Combined
Cycle Power Project in Village Mahuakhera Ganj, Kashipur, Distt. U.S. Nagar, Uttarakhand.
In the matter of:
M/s Beta Infratech Private Limited
…….…..Petitioner AND In the matter of:
Uttarakhand Power Corporation Ltd. .........Respondent
15.11.2019
In the matter of:
Selection of Developer(s) for setting of 200 MW Aggregate Capacity Grid Connect Solar PV
Power Projects in the Hilly region of Uttarakhand for procurement of power on long term basis
by Uttarakhand Power Corporation Limited (UPCL) through tariff based competitive bidding
process under Type-I project of “Uttarakhand Solar Energy Policy-2013”(Amended -2018).
In the matter of:
M/s Kumar Enterprise
M/s Prakash Enterprise
M/s Joshi Enterprise … Petitioners AND In the matter of:
Uttarakhand Renewable Energy Development Agency (UREDA)
Uttarakhand Power Corporation Ltd. … Respondents
14.11.2019
In the matter of:
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2019 to 31.12.2019.
In the matter of:
Uttarakhand Power Corporation Ltd.
…….…..Petitioner
25.10.2019
In the matter of:
Petition seeking approval for recovery of power purchase cost incurred in excess of the approved power purchase cost for FY 2018-19.
In the matter of:
Uttarakhand Power Corporation Ltd.
…….…..Petitioner
25.10.2019
In the matter of:
Petition for review of the Commission’s Order dated 27.02.2019 on True up for FY 2017-18, Annual Performance Review for FY 2018-19 and Annual Revenue Requirement for FY 2019- 20.
In the matter of:
Uttarakhand Power Corporation Ltd.
…….…..Petitioner
18.10.2019
In the matter of:
APTEL’s Judgement dated 23.04.2019 in Appeal No. 287 of 2015.
s
In the matter of:
M/s Swasti Power Ltd. .......Petitioner
…….…..Petitioner
AND In the Matter of:
Uttarakhand Power Corporation Ltd. .... Respondent
15.10.2019
In the matter of:
Additional Surcharge levied by Uttarakhand Power Corporation Ltd. during the period 01st December 2014 to 31st March 2017 on open access power purchased by M/s Kashi Vishwanath Textile Mill (P) Ltd.
s
In the matter of:
M/s Kashi Vishwanath Textile Mill (P) Ltd.
5th Km Stone, Ram Nagar Road, Kashipur, Udham Singh Nagar.
…….…..Petitioner
AND In the Matter of:
Uttarakhand Power Corporation Ltd. Corporate Head Quarter, Victoria Cross Vijeyta Gabar Singh Urja Bhawan Kanwali Road, Balliwala Chowk, Dehradun.
……...Respondent
09.10.2019
In the matter of:
Petition seeking carry forward of surplus Renewable Purchase Obligation of 139.00 MU (Non-Solar) in FY 2018-19 as per the provisions of UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010.
In the matter of:
Uttarakhand Power Corporation Ltd. … Petitioner
AND In the Matter of:
Uttarakhand Renewable Energy Development Agency (UREDA)
18.09.2019
In the matter of:
Petition to extend the Control Period of the benchmark capital cost and generic tariff as declared by the Commission vide Order dated 07.06.2019, upto October, 2020 for upcoming Solar PV Power Plants (cumulative capacity of 52 MW).
In the matter of:
Uttarakhand Renewable Energy Development Agency … Petitioner
AND In the Matter of:
Uttarakhand Power Corporation Ltd. ... Respondent
17.09.2019
In the matter of:
Petition for approval of Tariff rate revision from 70% CFA to Non CFA tariff rates for small solar
plants, which already have 25 years PPA with UPCL under the “scheme for development of
Grid Interactive Rooftop and Small Solar PV Power Projects-2016” for Residential/Institutional/
Social Sector, published on 29.09.2016, under Jawaharlal Nehru National Solar Mission.
In the matter of:
M/s Akshay Urja Association … Petitioner
AND In the Matter of:
Uttarakhand Power Corporation Ltd.
Uttarakhand Renewable Energy Development Agency (UREDA) … Respondents
17.09.2019
In the matter of:
Petition seeking Review of the order of the Commission dated 10.04.2019 in Petition No. 31 of 2017 seeking determination of project specific Tariff for Tanga Small Hydro Power Project (5 MW) unit of M/s Himalaya Hydro Pvt. Ltd., under Section 94(1)(f) of the Electricity Act, 2003 and Regulation 54 of the UERC (Conduct of Business) Regulation 2014.
In the matter of:
M/s Himalaya Hydro Pvt. Ltd. …Petitioner
AND In the Matter of:
Uttarakhand Power Corporation Ltd. … Respondent
Date of order 02.09.2019
In the matter of:
Application seeking approval of Uttarakhand Electricity Regulatory Commission on the Model Power Purchase Agreement between Uttarakhand Power Corporation Limited and selected bidders for setting of Grid connected Solar PV Power Projects.
In the matter of:
Uttarakhand Power Corporation Limited. (UPCL)
…Petitioner AND In the matter of:
Uttarakhand Renewable Energy Development Agency (UREDA) … Respondent
Date of order 29.08.2019
In the matter of:
Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising out of its obligation to supply electricity to the open access consumers. AND
Uttarakhand Power Corporation Limited. (UPCL)
…Petitioner
Date of order 26.08.2019
In the matter of:
Suo-moto proceeding under the provisions of Section 142 and 146 read with Section 149 of the Electricity Act, 2003 initiated for non-compliance of the Commission’s Order dated 23.03.2018 issued in the matter of
And
Petition under the Regulation 13 of UERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2017 for seeking relaxation of one (1) year in Regulation 1(2) for implementation of Intra-State ABT and Deviation Settlement Mechanism. AND
(1) Chief Engineer,
State Load Dispatch Centre (SLDC),
Vidyut Bhawan, Majra, Dehradun
(2) Managing Director,
Power Trans. Corp. of Uttarakhand Ltd.,
Vidyut Bhawan, Majra, Dehradun
(3) Managing Director,
Uttarakhand Power Corp. Ltd.,
VCV Gabar Singh Urja Bhawan, Kanwali Road, Dehradun
(4) Managing Director,
UJVN Limited,
“UJJWAL”, Maharani Bagh, GMS Road, Dehradun
...Respondents
Date of order 19.08.2019
In the matter of:
Petition seeking approval of the Commission for advance and return banking of power with M/s GMR Energy Trading Ltd., M/s Arunachal Pradesh Power Corporation Pvt. Ltd. and M/s Kreate Energy (I) Pvt. Ltd. under an energy banking arrangement with Uttarakhand Power Corporation Ltd. In the matter of:
Uttarakhand Power Corporation Ltd. …
AND In the matter of:
M/s GMR Energy Trading Ltd.
M/s Arunachal Pradesh Power Corporation Pvt. Ltd.
M/s Kreate Energy (I) (P) Ltd. … Respondents
Date of order 14.08.2019
In the matter of:
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.07.2019 to 30.09.2019. In the matter of:
Uttarakhand Power Corporation Ltd. … Petitioner
Date of Order 13.08.2019
In the matter of:
Suo-moto proceeding in the matter of Gross Violation of the provisions of the Electricity Act, 2003, UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013 and UERC (The Electricity Supply Code) Regulations, 2007. &
Complaint dated 28.02.2018 of Sh. Parshuram S/o late Sh. Palturam, resident of Jagjeetpur, Post Office-Kankhal, Haridwar, Uttarakhand. And In the matter of:
(1) Managing Director,
Uttarakhand Power Corporation of Ltd. (UPCL)
VCV Gabar Singh Urja Bhawan, Kanwali Road,
Dehradun
(2) Sh. Arvind Kumar,
(The then SDO, UPCL, Bahadarabad, Haridwar)
Executive Engineer-Raipur, 359/2, Dharampur, Dehradun
(3) Sh. Sandeep Chauhan,
(The then JE, UPCL, EDSD-Bahadarabad/Jagjeetpur, Haridwar)
O/o Executive Engineer-SIDCUL,
33/11 kV Sub-Station, Sector-8, SIDCUL, Haridwar
...Respondents
Date of order 05.08.2019
In the matter of:
Refund of Additional Surcharge paid to Uttarakhand Power Corporation Ltd. on power purchased through open access during June 2013 to March 2017 by M/s Alps Industries Ltd. In the matter of:
M/s Alps Industries Ltd. 57/2, Industrial Area, Sahibabad,
Ghaziabad-201010 (Uttar Pradesh)
…….…..Petitioner AND In the matter of:
1. Uttarakhand Power Corporation Ltd. Corporate Head Quarter, Victoria Cross Vijeyta Gabar Singh Urja Bhawan Kanwali Road, Balliwala Chowk, Dehradun.
2. Managing Director, Uttarakhand Power Corporation Ltd., Corporate Head Quarter, Victoria Cross Vijeyta Gabar Singh Urja Bhawan Kanwali Road, Balliwala Chowk, Dehradun.
3. Director (Finance) Uttarakhand Power Corporation Ltd., Corporate Head Quarter, Victoria Cross Vijeyta Gabar Singh Urja Bhawan Kanwali Road, Balliwala Chowk, Dehradun.
4. Director (Operation)Uttarakhand Power Corporation Ltd., Corporate Head Quarter, Victoria Cross Vijeyta Gabar Singh Urja Bhawan Kanwali Road, Balliwala Chowk, Dehradun.
5. The Chief Engineer (Distribution), Uttarakhand Power Corporation Ltd. Roshanabad, SIDCUL, Haridwar.
6. The Superintendent Engineer (Distribution), Uttarakhand Power Corporation Ltd. Roshanabad, SIDCUL, Haridwar.
7. The Executive Engineer, (Distribution) Uttarakhand Power Corporation Ltd. Roshanabad, SIDCUL, Haridwar.
……...Respondents
Date of order 01.08.2019
In the matter of:
Application seeking approval of the Commission on the Model Power Purchase Agreement between Uttarakhand Power Corporation Limited and selected bidders for setting of Pine Needle based power plants.
In the matter of:
Uttarakhand Power Corporation Ltd. … Petitioner AND In the matter of:
Uttarakhand Renewable Energy Development Agency (UREDA) … Respondent.
Date of order 29.07.2019
In the matter of:
Petition seeking implementation of Order passed on 10.04.2014 by the Commission for Vanala Small Hydro Power Electric Generating Station (15 MW) unit of M/s Him Urja Pvt. Ltd.
AND
Petition No. 21 of 2019
Petition seeking implementation of Order passed on 21.12.2012 by the Commission for Vanala Small Hydro Power Electric Generating Station (15 MW) unit of M/s Him Urja Pvt. Ltd.
AND
Petition No. 20 of 2019
Petition seeking implementation of Order passed on 17.03.2016 by the Commission for Rajwakti Small Hydro Power Project (4.4 MW) unit of M/s Him Urja Pvt. Ltd.
In the matter of:
M/s Him Urja Pvt. Ltd. … Petitioner
AND
In the matter of:
Uttarakhand Power Corporation Ltd. … Respondent
Date of order 15.07.2019
In the matter of:
Petition seeking review of Impugned Order dated 20.06.2018 in Petition No. 04/2018 passed by the Uttarakhand Electricity Regulatory commission under Section 94(1)(f) of the Electricity Act, 2003.
Date of order 25.06.2019
In the matter of:
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.04.2019 to 30.06.2019.
Date of order 07.06.2019
In the matter of:
Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2019-20 and onwards till reviewed/revised by the Commission.
Date of order 10.04.2019
In the matter of:
Suo moto proceedings initiated by the Commission in the matter of Show Cause Notice issued vide letter dated 18.04.2016 and in the matter of waiver and refund of penalty imposed by the Commission vide its Order dated 01.09.2005 for non-compliance of its directions with respect to Bill Collection System.
AND
In the matter of:
Uttarakhand Power Corporation Ltd. (UPCL) , Victoria Cross Vijeyta Gabar Singh, Urja Bhawan, Kanwali Road, Dehradun. …Petitioner
Date of order 10.04.2019
In the matter of: Payment of Penalty as per sub-section 3 of Section 43 of the Electricity Act, 2003 and sub-Regulation 12 of Regulation 5 of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007/sub-Regulation 14 of Regulation 5 of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013, Commission’s directions issued vide Order dated 05.07.2016, 09.05.2017 and Commission’s directions issued vide Order dated 17.01.2018.
AND
In the matter of: Uttarakhand Power Corporation Ltd. (UPCL), VCV Gabar Singh Urja Bhawan, Kanwali Road, Dehradun. ...Respondent
Date of order 10.04.2019
In the matter of: Application seeking prior approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s Tata Power Trading Company Ltd. for procuring Non-Solar RE Energy on short term basis.
In the matter of: Uttarakhand Power Corporation Limited … Petitioner
AND
In the matter of:
M/s Tata Power Trading Company Ltd. …Respondent
Date of order 10.04.2019
In the matter of: Supplementary Petition seeking adjustment of tariff for Vanala Small Hydro Power Project (15 MW) of M/s Him Urja Pvt. Ltd. as per Section 61 and 62 of the Electricity Act, 2003 read with Regulation 14 & 15 of UERC (Tariff and Other Terms for supply of Electricity from Renewable Energy Sources and Non fossil fuel based Co- generating Stations) Regulations, 2010, as amended from time to time seeking revision of tariff.
In the matter of:
M/s Him Urja Pvt. Ltd. … Petitioner
AND
In the matter of: Uttarakhand Power Corporation Ltd. … Respondent
Date of order 10.04.2019
In the matter of:
Petition seeking determination of project specific tariff for 5 MW Tanga Small Hydro Power Project of M/s Himalaya Hydro Pvt. Ltd. under Section 62 and 86 of the Electricity Act, 2003 read with Regulation 13 of Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Non-conventional and Renewable Energy Sources) Regulations, 2013.
In the matter of: M/s Himalaya Hydro Pvt. Ltd. …Petitioner
AND
In the matter of: Uttarakhand Power Corporation Ltd. …Respondent
Date of order 10.04.2019
In the matter of:
Suo-moto proceeding initiated in the matter of transfer of assets pertaining to 66 kV Substation and Lines from UPCL to PTCUL.
In the matter of: Uttarakhand Power Corporation Limited. (UPCL), VCV Gabar Singh Urja Bhawan, Kanwali Road, Dehradun.
AND
Managing Director,
Power Transmission Corporation of Uttarakhand Ltd., Vidyut Bhawan, Majra, Dehradun. ...Respondents.
Date of order 10.04.2019
In the matter of: Dispute between M/s Bhilangana Hydro Power Limited and Uttarakhand Power Corporation Ltd., regarding non-payment of Open Access Charges by UPCL for supply of non-solar renewable power by M/s Bhilangana Hydro Power Ltd. through Tata Power Trading Company Ltd. in FY 2016-17 and FY 2017-18.
AND
In the matter of: M/s Bhilangana Hydro Power Limited. (BHPL) ….....…Petitioner No. 1
In the matter of: Tata Power Trading Company Ltd. (TPTCL). ….....…Petitioner No. 2
AND
In the matter of: Uttarakhand Power Corporation Ltd. (UPCL) ..……....Respondent
Date of order 10.04.2019
In the matter of: Petition for Investment Approval of construction of Colony at 132 kV Substation Majra Campus Dehradun.
AND
In the matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) ...............Petitioner
Date of order 08.04.2019
In the matter of: Application seeking approval for the investment on the project covering the construction of 03 Nos., 33/11 kV Substations & their associated 33 kV line.
AND
In the matter of: Uttarakhand Power Corporation Limited. (UPCL), VCV Gabar Singh Urja Bhawan, Kanwali Road,
Dehradun. …Petitioner
Date of order 08.04.2019
In the matter of:
Petition seeking permission to set up Solar Power Plant of capacity 50 MW at Village Adhar Mafi, Kujyadi, Dehli in District Almora, Uttarakhand, for sale of electricity by Van Panchayat Adhar Mafi/Adhar Mafi Prabandhan Samiti, Government of Uttarakhand.
In the matter of:
Sh. Nayan Pant, Sarpanch, Van Panchayat Adhar Mafi/ Adhar Mafi Prabandhan Samiti, Almora … Petitioner
AND
In the matter of:
Uttarakhand Power Corporation Ltd.
Uttarakhand Renewable Energy Development Agency (UREDA) … Respondents
Date of order 05.04.2019
In the matter of:
Suo-moto proceedings in the matter of finalization of Station Heat Rate of Gas based Combined Cycle Power Plant of Gama Infraprop Pvt. Ltd. and Sravanthi Energy Pvt. Ltd. located at Kashipur, Uttarakhand
AND
In the matter of:
Uttarakhand Power Corporation Ltd. … Respondent
Date of order 04.04.2019
In the matter of:
Application seeking approval for the investment on the project covering the construction of 05 No. 33/11 KV Substations & their associated 33 KV Line and 06 No. 33 KV Feeders from 220/132/33 KV Substation IIP Mohkampur.
AND
In the matter of: Uttarakhand Power Corporation Limited (UPCL), Victoria Cross Vijeta Gabar Singh Urja Bhawan, Kanwali Road, Dehradun. …Petitioner
Date of order 02.04.2019
In the matter of:Review petition filed under Regulation 54 of the UERC (Conduct of Business Regulations), 2014 for review of the order dated 16.03.2017 passed by the Commission in the matter of determination of Project specific Tariff for 10.5 MW SHP (Sarju-III) on Sarju river at Kapkote, Bageshwar district, Uttarakhand u/s 62 & 86(1)(b) and 86(1)(e) of the Electricity Act, 2003 read with Regulation 13 of UERC (Tariff and other Terms for Supply of Electricity from Non-Conventional and Renewable Energy Sources) Regulations, 2013.
AND
In the matter of: Uttarakhand Power Corporation Ltd. … Petitioner
AND
In the matter of: Uttar Bharat Hydro Power Pvt. Ltd. … Respondent
Date of order 02.04.2019
In the matter of:
Review petition filed under Regulation 54 of the UERC (Conduct of Business Regulations), 2014 for review of the order dated 21.08.2018 passed by the Commission in the matter of determination of Project specific Tariff for 12.6 MW SHP (Sarju-II) on Sarju river at Kapkote, Bageshwar district, Uttarakhand u/s 62 & 86(1)(b) and 86(1)(e) of the Electricity Act, 2003 read with Regulation 13 of UERC (Tariff and other Terms for Supply of Electricity from Non-Conventional and Renewable Energy Sources) Regulations, 2013.
AND
In the matter of:
Uttarakhand Power Corporation Ltd. … Petitioner
AND
In the matter of: Uttar Bharat Hydro Power Pvt. Ltd. … Respondent
Date of order 12.03.2019
In the matter of: Approval of Capital Investments under Para 11 of the Transmission for:
(i) Construction of 2x50 MVA 220/33 kV GIS Substation, Selaqui, Dehradun & its associated LILO of 220 kV Khodri-Jhajhra line at proposed 220/33 kV S/s Selaqui, Dehradun.
(ii) Increasing Capacity of 132 KV Manglore Substation by Procurement, Installation & Commissioning of 132/33 kV, 80 MVA Transformer.
AND
In the matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL)
AND
In the matter of:
Date of order 07.03.2019
In the matter of:
Review Petition filed by UJVN Ltd. under section 94(1) (f) of the Electricity Act, 2003 read with Regulation 54 of UERC (Conduct of Business) Regulations, 2014 seeking review of the Order dated 19.06.2018 read with letter no. 1144 dated 06.11.2018 on Suo moto proceeding regarding handing over of distribution business to UPCL.
AND
In the matter of: UJVN Ltd., "UJJWAL", Maharani Bagh, GMS Road, Dehradun …… Petitioner
AND
In the matter of:
Uttarakhand Power Corporation Ltd. (UPCL), VCV Gabar Singh Urja Bhawan, Kanwali Road, Dehradun ….Respondent
Date of order 05.03.2019
In the matter of:
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.01.2019 to 31.03.2019.
AND
In the matter of:
Uttarakhand Power Corporation Ltd. … Petitioner
Date of order 01.02.2019
In the matter of: Petition to extend the control period of the benchmark capital cost & generic tariff as declared by the Commission vide its order dated 06.09.2018, upto March, 2020 for upcoming Solar PV Power Plants (cumulative capacity of 200 MW).
AND
In the matter of:
Uttarakhand Renewable Energy Development Agency … Petitioner
AND
In the matter of:Uttarakhand Power Corporation Ltd. ... Respondent
Date of order 24.01.2019
In the matter of:
Review Petition filed by M/s Bhilangana Hydro Power Ltd. under section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 54 of UERC (Conduct of Business) Regulations, 2014 seeking review of the Order dated 22.11.2018 passed by the Commission in Petition No. 45 of 2018 in the matter of late Payment Surcharge against payment of Transmission Charges for the alleged dedicated Transmission Network.
AND
In the matter of: M/s Bhilangana Hydro Power Limited ….… Petitioner
AND
In the matter of: Power Transmission Corporation of Uttarakhand Ltd. (PTCUL) …….Respondent
Date of order 21.01.2019
In the matter of:
Application seeking approval for the investment on the project covering laying of 3250 Km. LT AB cable in theft prone and other areas of District Dehradun, Uttarkashi, Pauri, Haridwar, Nainital, US Nagar and Almora.
AND
In the matter of:Uttarakhand Power Corporation Limited (UPCL),Dehradun. …Petitioner
Date of order 15.01.2019
In the matter of:
Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s A B Renewable Energy Pvt. Ltd.
In the matter of:Uttarakhand Power Corporation Ltd. … Petitioner
AND
In the matter of: M/s A. B. Renewable energy Pvt. Ltd. … Respondent
Date of order 14.01.2019
In the matter of:
Petition seeking approval of one time registration fee and annual fee to be collected from obligated entities for registration under Renewable Purchase Obligation Compliance system (RPOCS) in Uttarakhand.
In the matter of: Uttarakhand Renewable Energy Development Agency … Petitioner
Miscellaneous Orders-Year-2018
Date of order 14.12.2018
In the matter of:
Deployment of customised Renewable Purchase Obligation Compliance System (RPOCS) Web Tool in Uttarakhand.
Date of order 22.11.2018
In the Matter of: Dispute between M/s Bhilangana Hydro Power Limited and Power Transmission Corporation of Uttarakhand Limited, regarding Late Payment Surcharge against payment of transmission charges for the alleged dedicated transmission network.
AND In the matter of: M/s Bhilangana Hydro Power Limited. ….....…Petitioner
AND In the matter of: Power Transmission Corporation of Uttarakhand Ltd. (PTCUL) ……....Respondent
Date of order 09.11.2018
In the matter of:
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2018 to 31.12.2018.
In the matter of:
Uttarakhand Power Corporation Ltd. … Petitioner
Date of order 31.10.2018
In the matter of:Application seeking approval of the Commission on the Draft Power Purchase Agreement for short term power purchase between Uttarakhand Power Corp. Ltd. and M/s Mittal Processors (P) Ltd. (MPPL), M/s PTC India Ltd., M/s Tata Power Trading Company Ltd. (TPTCL), M/s Sembcorp Gayatri Power Ltd. (SGPL) and M/s GMR Energy Trading Ltd.
In the matter of:
Uttarakhand Power Corporation Ltd. … Petitioner
And in the matter of:
M/s Mittal Processors (P) Ltd.
M/s PTC India Ltd.
M/s Tata Power Trading Company Ltd.
M/s Sembcorp Gayatri Power Ltd.
M/s GMR Energy Trading Ltd. … Respondents
26.10.2018
In the matter of:Petition No. 34 of 2018
Application seeking approval of the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Aglar Power Ltd. for Rayat SHP.
Petition No. 35 of 2018
In the matter of:
Application seeking approval of the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Aglar Power Ltd. for Lagrasu SHP.
In the matter of:
Uttarakhand Power Corporation Limited …Petitioner
In the matter of:
M/s Aglar Power Ltd. for Rayat SHP and Lagrasu SHP ……Respondent
Date of order 24.09.2018
In the matter of:
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.07.2018 to 30.09.2018.
In the matter of:
Uttarakhand Power Corporation Ltd. … Petitioner
Date of order 17.09.2018
In the matter of:
Petition under section 94(1)(f) of the Electricity Act, 2003 read with Regulation 54 of the UERC (Conduct of Business) Regulations, 2014 for review of the Order dated 17.05.2018 passed by the Commission in the Petition filed by M/s Him Urja Pvt. Ltd. seeking adjustment of tariff.
In the matter of:
M/s Him Urja (P) Ltd. …Petitioner
In the matter of:
Uttarakhand Power Corporation Ltd. … Respondent
Date of order 13.09.2018
In the matter of: Suo-moto proceedings in the matter of Show Cause Notice issued to PTCUL under the provisions of Section 142 read with Section 149 of the Electricity Act, 2003, relating to construction of 132 kV line for M/s Gold Plus Glass Industry Ltd., Roorkee.
In the matter of:
Power Transmission Corporation of Uttarakhand Limited (PTCUL)
Uttarakhand Power Corporation Limited (UPCL)
M/s Gold Plus…………Respondents
Date of order 12.09.2018
In the Matter of:
Application seeking approval for the investment on the project covering the construction of 01 No. 66/33 kV Substation & its 0.60 Km associated 66 kV line.
Application seeking permission to setup Solar Power Plant of capacity 40 MW at Haripura Dam (27.34 MW) and Tumaria Dam (13.50 MW) in District Udham Singh Nagar, Uttarakhand, on Net Metering basis for captive consumption by Department of Irrigation, Government of Uttarakhand.
the matter of:
Irrigation Department, GoUK … Petitioner
In the matter of:
Uttarakhand Power Corporation Ltd.
Uttarakhand Renewable Energy Development Agency (UREDA) … Respondents
Date of order 28.08.2018
In the matter of:
Application seeking approval of the Commission on the Draft Power Purchase Agreement for short term power purchase between Uttarakhand Power Corp. Ltd. and M/s Tata Power Trading Company Ltd. (TPTCL), M/s NTPC Vidyut Vyapar Nigam Ltd. (NTPC VVN Ltd.) and M/s PTC India Ltd.
In the matter of:
Uttarakhand Power Corporation Ltd. … Petitioner
In the matter of:
M/s Tata Power Trading Company Ltd.
M/s PTC India Ltd.
M/s NTPC Vidyut Vyapar Nigam Ltd. … Respondents
Date of order28.08.2018
In the matter of:
Application seeking approval of the Commission on the Power Purchase Agreement executed between Uttarakhand Power Corporation Limited and Uttarakhand Renewable Energy Development Agency (for 10 nos. of Small Hydro Power Plants).
In the matter of:
Uttarakhand Power Corporation Ltd. … Petitioner
In the matter of:
Uttarakhand Renewable Energy Development Agency (UREDA) … Respondent
Date of order 21.08.2018
In the Matter of:
Petition seeking determination of project specific tariff for 12.6 MW Small Hydro Power Project under Section 62 and 86 of the Electricity Act, 2003 read with Regulation 13 of Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Nonconventional and Renewable Energy Sources) Regulations, 2013.
In the matter of:
Uttar Bharat Hydro Power Pvt. Ltd. …Petitioner
In the matter of:
Uttarakhand Power Corporation Ltd. …Respondent
Date of order 14.08.2018
In the matter of:
Application seeking relaxation in UERC (The Electricity Supply Code) Regulations 2007 and in UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013.
In the matter of:
Uttarakhand Power Corporatin Ltd.
Victoria Cross Vijeta Gabar Singh Urja Bhawan,
Date of order 13.08.2018
In the Matter of:
Review Petition on the Commission’s Order dated 21.03.2018 on "True-Up of FY 2016-17, ARR for FY 2017-18 and AFC for FY 2018-19 for UJVN Ltd."
Petition for review of the Commission’s Order dated 21.03.2018 on True up for FY 2016-17, Annual Performance Review for FY 2017-18 and Annual Revenue Requirement for FY 2018-19.
In the matter of:
Uttarakhand Power Corporation Ltd. …Petitioner
Date of order 07.08.2018
In the matter of:
Petition seeking approval of the Commission for advance banking of power with M/s PTC India Limited, M/s Mittal Processors (P) Ltd and M/s Arunachal Pradesh Power Corporation Pvt. Ltd. under a banking arrangement with the Uttarakhand Power Corporation Ltd.
In the matter of:
Uttarakhand Power Corporation Ltd. … Petitioner
In the matter of:
M/s PTC India Ltd.
M/s Arunachal Pradesh Power Corporation Pvt. Ltd.
M/s Mittal Processors (P) Ltd. … Respondents
Date of order 06.08.2018
In the matter of:
Suo-Moto proceedings initiated by the Commission against non-compliance by UPCL of the provisions of UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010 and directions issued by the Commission vide Order dated 15.09.2017 regarding procurement of unmet Solar and Non-Solar RPO for FY 2016-17 alongwith the RPO for FY 2017-18 latest by March, 2018.
In the matter of:
Sh. B. C. K. Mishra
Managing Director,
Uttarakhand Power Corporation Ltd.,
Dehradun. …Respondent
Date of order 23.07.2018
In the matter of:
Application seeking prior approval of Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s Tata Power Trading Company Ltd. for procuring Non-Solar RE Energy on short term basis.
In the matter of:
Uttarakhand Power Corporation Limited … Petitioner
In the matter of:
M/s Tata Power Trading Company Ltd. …Respondent
Date of order 12.07.2018
In the matter of:
Petition filed under Section 86(1)(f) of the Electricity Act, 2003 read with Article 23 of the PPAs, seeking payment of outstanding dues from Uttarakhand Power Corporation Limited for the common evacuation infrastructure constructed for 4x12.5 MW solar projects of ACME Solar Holdings Private Limited, in terms of the power purchase agreements executed between the parties.
In the matter of:
M/s ACME Solar Holdings (P) Ltd.
M/s Devishi Solar Power (P) Ltd.
M/s Devishi Renewable Energy (P) Ltd.
M/s Eminent Solar Power (P) Ltd.
M/s Sunworld Energy (P) Ltd. … Petitioners
In the matter of:
Uttarakhand Power Corporation Ltd. (UPCL)
Power Transmission Corporation of Uttarakhand Ltd. (PTCUL) … Respondents
Date of order 28.06.2018
In the matter of:
Application seeking prior approval of Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s Manikaran Power Limited, M/s Tata Power Trading Company Ltd. & M/s PTC India Ltd. for procuring Non-Solar RE Energy on short term basis.
In the matter of:
Uttarakhand Power Corporation Limited … Petitioner
In the matter of:
M/s. Tata Power Trading Company Ltd.
M/s PTC India Ltd.
M/s Manikaran Power Ltd. …Respondents
Date of order 27.06.2018
In the matter of:
Application under Regulation 50 of the UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2013.
In the matter of:
M/s Distributed Solar Power Association
M/s Amplus Solar Power Pvt. Ltd. … Petitioner
In the matter of:
Uttarakhand Power Corporation Ltd.
Uttarakhand Renewable Energy Development Agency (UREDA) … Respondent
Date of order 20.06.2018
In the matter of:
Petition seeking clarification with regard to the UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2013 or, in the alternative, a specific order of relaxation or permission for establishment of a grid interactive roof-top solar plant with installed solar capacity of 3600 KW on captive consumption basis by M/s Amplus Solar Power Pvt. Ltd. and M/s Asahi India Glass Ltd.
In the matter of:
M/s Amplus Solar Power Pvt. Ltd.
M/s Asahi India Glass Ltd. … Petitioners
In the matter of:
Uttarakhand Power Corporation Ltd.
Uttarakhand Renewable Energy Development Agency (UREDA) … Respondents
Date of order 20.06.2018
In the Matter of:
Application seeking amendment in UERC (The Electricity Supply Code) Regulations, 2007.
Petition for submission of Draft Metering Communication & Data Acquisition Requirements (MCDAR) for Intra-State Transmission System of Uttarakhand developed in pursuance to Regulation 8.1 of UERC (State Gird Code) Regulations, 2016 and Regulation 10 of UERC (Conduct of Business) Regulations, 2014 for approval of the Commission.
In the matter of:
Power Transmission Corporation of Uttarakhand Ltd.,
‘Vidyut Bhawan’, Majra, Dehradun....Petitioner.
Date of order 15.06.2018
In the matter of:
Suo-moto proceedings in the matter of request made by Mr. Digambar Singh Bisht for issuance of appropriate directions for releasing Grant/Subsidy sanctioned by Central Government, payment in accordance with solar Tariff fixed for FY 2015-16 and immediate grid connectivity for allocated solar power plant to Mr. Digambar Singh Bisht.
In the matter of:
Mr. Digambar Singh Bisht ("Developer")
Uttarakhand Power Corporation Ltd. ("UPCL")
Uttarakhand Renewable Energy Development Agency ("UREDA") … Respondents
Date of order 15.06.2018
In the matter of:
Suo-moto proceedings in the matter of request made by Mr. Dhirendra Singh Rawat for issuance of appropriate directions to release Grant/Subsidy sanctioned by Central Government and payment in accordance with solar Tariff fixed for FY 2015-16 for supply of solar energy from allocated grid connected Solar Rooftop power plant.
In the matter of: Mr. Dhirendra Singh Rawat ("Developer")
Uttarakhand Power Corporation Ltd. ("UPCL"
Uttarakhand Renewable Energy Development Agency ("UREDA") … Respondents
Date of order 29.05.2018
In the matter of:
Suo-moto proceedings in the matter of applicability of tariff for the purpose of incentive on account of revised O&M norms in UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2013 and UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations), 2010.
Date of order 21.05.2018
In the Matter of:
Approval for the Capital Investment on the Implementation of Phase-II of IT enablement projects under Integrated Power Development Scheme (IPDS), Ministry of Power (MoP), Government of India (GoI).
n the Matter of:
Uttarakhand Power Corporation Limited. (UPCL), Victoria Cross Vijeyta Gabar Singh Urja Bhawan, Kanwali Road,
Dehradun. …...Petitioner
Date of order 17.05.2018
In the matter of:
Petition seeking adjustment of tariff for Vanala Small Hydro Power Project (15 MW) unit of M/s Him Urja Pvt. Ltd. as per Section 61 and 62 of the Electricity Act, 2003 read with Regulation 14 & 15 of UERC (Tariff and Other Terms for supply of Electricity from Renewable Energy Sources and Non fossil fuel based Co- generating Stations) Regulations, 2010, as amended from time to time seeking revision of tariff.
In the matter of:
M/s Him Urja Pvt. Ltd. … Petitioner
In the matter of:
Uttarakhand Power Corporation Ltd. … Respondent
Date of order 12.04.2018
In the Matter of:
Suo-moto proceedings initiated by the Commission on the representation of M/s India Glycols Ltd. regarding illegal demand of Cross Subsidy from Medium Term Open Access (MTOA) consumers by UPCL.
In the matter of
M/s India Glycols Ltd., A-1, Industrial Area Bazpur Road, Kashipur. .…..Respondent No. 1
M/s Hindustan National Glass Ltd. Malviya Nagar, Virbhadra Rishikesh. .…..Respondent No. 2
M/s Ester India Ltd. Sohan Nagar, Charubeta, Khatima, U.S. Nagar. …..Respondent No. 3
Uttarakhand Power Corporation Limited (UPCL). …..Respondent No. 4
Date of order 02.04.2018
In the matter of:
Application seeking approval on the Surcharge Waiver Scheme for the Domestic, Non-domestic, Private Tubewell and L.T.
Industry Category Consumers.
In the matter of:
Uttarakhand Power Corporation Ltd. … Petitioner
Date of order 23.03.2018
In the Matter of:
Petition filed under Regulation 13 of UERC (Deviation Settlement Mechanism and related matters) Regulations, 2017 for seeking relaxation of one year in Regulation 1(2) for implementation of Intra State ABT and Deviation Settlement Mechanism.
In the Matter of:b>
State Load Despatch Centre (SLDC), Power Transmission Corporation of Uttarakhand Ltd., Vidyut Bhawan, Majra, Dehradun. …….…...Petitioner
In the matter of:
1. Uttarakhand Power Corporation Ltd. (UPCL), Victoria Cross Vijeta Gabar Singh Urja Bhawan, Kanwali Road, Dehradun
Power Transmission Corporation of Uttarakhand Ltd. (PTCUL), Vidyut Bhawan, Majra, Dehradun
Uttarakhand Renewable Energy Development Agency (UREDA), Urja Park Campus, Industrial Area, Patel Nagar, Dehradun.
& Others. ……...Respondents
Date of order 23.03.2018
In the matter of:
Petition seeking approval for increase in existing transaction charges per electricity bill, collected by VLEs (Village Level Entrepreneurs) through M/s CSC e-Governance Service India Ltd and introduction of incentive scheme to VLEs.
In the matter of:
Uttarakhand Power Corporatin Ltd., Victoria Cross Vijeta Gabar Singh Urja Bhawan, Kanwali Road, Dehraudn ………Petitioner
Date of order 13.03.2018
In the Matter of: Petition for approval of "Additional Capital Works amounting to Rs. 44.05 Crore of 4X76 MW Maneri Bhali-II HEP".
In the Matter of: UJVN Ltd., "UJJWAL", Maharani Bagh, G.M.S, Road, Dehradun. …………Petitioner
Date of order 13.03.2018
In the matter of: Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.01.2018 to 31.03.2018.
In the matter of: Uttarakhand Power Corporation Ltd. … Petitioner
Date of order 08.03.2018
In the Matter of: Approval of Capital Investments under Para 11 of the Transmission Licence for laying of OPGW cable under the project "Reliable Communication & Data Acquisition System for 132 kV & above Substations" in PTCUL under PSDF Scheme. And In the Matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) …...Petitioner
Date of order 23.01.2018
In the matter of: Application seeking approval of the Power Purchase Agreement between M/s Himalaya Hydro Pvt. Ltd. and Uttarakhand Power Corporation Ltd.
In the matter of: M/s Himalaya Hydro Pvt. Ltd. …Petitioner
In the matter of: Uttarakhand Power Corporation Limited. …Respondent
Date of order 17.01.2018
In the matter of: Show cause Notice-cum-Notice for Personal Hearing issued to MD, UPCL in the matter of Non-compliance of sub-Regulation 14 of Regulation 5 & sub-Regulation 15 of Regulation 5 of UERC (Release of new LT Connections, Enhancement and Reduction of Loads) Regulations, 2013.
In the matter of: Managing Director, Uttarakhand Power Corporation of Ltd. (UPCL) ...Respondent
Date of order 04.01.2018
In the matter of:
Hon’ble ATE Judgment dated 14.11.2017 in Appeal No. 285 of 2016 & IA No. 585 of 2016 setting aside the Commission’s Order dated 20.09.2016 and remand back of the matter to the Commission to consider the case of the Appellant on merits independently and in accordance with law.
In the matter of:
M/s Dans Energy Pvt. Ltd. .... Petitioner
In the matter of:
Uttarakhand Power Corporation Ltd. …Respondent
Miscellaneous Orders-Year-2017
Date of order 21.12.2017
In the Matter of: Application seeking approval for the investment on the project covering the construction of 01 No. 66/33 KV Substation & 0.60 Km 66 KV Line and 02 No. 33/11 KV Substations & their associated 15.20 Km 33 KV Line.
And In the Matter of: Uttarakhand Power Corporation Limited. (UPCL), Dehradun...Petitioner.
Date of order 18.12.2017
In the matter of:
Clarification Petition under Regulation 59 and 61 read with Regulation 54 of the UERC (Conduct of Business) Regulations, 2014 and Regulation 103, 104 and 105 of MYT Regulations, 2015 in the matter of Tariff Order dated 30.11.2016 passed by the Commission against Tariff Petition filed by M/s GBHPPL u/s 62 and 86(1)(a) of the Electricity Act, 2003 read with the relevant provisions of UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations, 2015 for determination of tariff for supply of power from their 70 MW Hydro Electric Power Project to UPCL.
In the matter of:
Uttarakhand Power Corporation Ltd. … Petitioner
In the matter of:
M/s Greenko Budhil Hydro Power Pvt. Ltd. ... Respondent
Date of order 18.12.2017
In the matter of:
Additional Surcharge levied by Uttarakhand Power Corporation Ltd. during the period 01st December 2014 to 31st of March 2017 on Open Access Power Purchased.
In the matter of:
M/s Kashi Vishwanath Textile Mill (P) Ltd. .…...… Petitioner
In the matter of: Uttarakhand Power Corporation Ltd. (UPCL) …...... Respondent
Date of order 12.12.2017
In the matter of:
Suo-moto proceedings in the matter of application seeking revision of tariff of Mohammadpur and Pathri SHPs of UJVN Ltd. determined by the Commission vide its Order dated 30.11.2016 & 25.05.2017 consequent to the amendment in RE Regulations, 2013.
In the matter of:
Uttarakhand Power Corporation Ltd. … Respondent
Date of order 06.12.2017
In the matter of:
Petition filed under Regulation 59 and 39 of the UERC (Conduct of Business Regulations), 2014 and Regulation 55A, 103, 104 & 105 of MYT Regulation 2015.
In the matter of:
Uttarakhand Power Corporation Limited … Petitioner
In the matter of:
M/s Sravanthi Energy Pvt. Ltd.
M/s Gamma Infraprop Pvt. Ltd.
M/s Beta Infratech Pvt. Ltd. … Respondents
Date of order 01.12.2017
In the Matter of:
Investment Approval of revised DPR of under Construction 220 kV Piran Kaliyar-Puhana (PGCIL) double circuit Line on double circuit Towers.
In the Matter of:
Power Transmission Corporation of Uttarakhand Limited (PTCUL)
Vidyut Bhawan, Near ISBT Crossing, Saharanpur Road,
Majra, Dehradun.
Date of order 28.11.2017
In the matter of:
Suo-moto proceedings in the matter of non-compliance of Commission’s direction issued vide order dated 16.05.2017 regarding the finalization of Station Heat Rate of Gas based Combined Cycle Power Plant of Gama Infraprop Pvt. Ltd. located at Kashipur, Uttarakhand.
li>
In the matter of:
Uttarakhand Power Corporation Ltd. … Respondent
Date of order 24.11.2017
In the matter of:
Suo-moto proceedings in the matter of application under Section 62 and 86 of Electricity Act, 2003 seeking modification of the project specific tariff of 10.5 MW Sarju III SHP of M/s Uttar Bharat Hydro Power Pvt. Ltd. as determined by the Commission vide its Order dated 16.03.2017 consequent to the amendment in RE Regulations, 2013.
In the matter of:
Uttarakhand Power Corporation Ltd. … Respondent
Date of order 22.11.2017
In the matter of:
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2017 to 31.12.2017.
In the matter of
Uttarakhand Power Corporation Ltd. … Petitioner
Date of order 22.11.2017
In the matter of:
Application seeking approval of the Commission on the bulk Power Purchase Agreement to be executed between Uttarakhand Power Corporation Limited and M/s UJVN Limited.
In the matter of:
Uttarakhand Power Corporation Ltd. … Petitioner
In the matter of:
UJVN Ltd. …Respondent
Date of order 22.11.2017
In the matter of:
Petition to extend the benchmark capital cost & generic tariff as decided by the Commission vide Order dated 16.06.2016 upto 31.01.2018 for Grid Interactive Rooftop and Small Solar Power Plants.
In the matter of:
Uttarakhand Renewable Energy Development Agency …Petitioner
In the matter of:
Uttarakhand Power Corporation Ltd. ...Respondent
Date of order 03.11.2017
In the matter of:
Application seeking approval of the Commission on the Draft Power Purchase Agreement executed between Uttarakhand Power Corporation Limited and Uttarakhand Renewable Energy Development Agency.
In the matter of:
Uttarakhand Power Corporation Ltd. … Petitioner
In the matter of:
Uttarakhand Renewable Energy Development Agency (UREDA) … Respondent
Date of order 01.11.2017
In the matter of:
Application seeking approval of the Commission on the Draft Power Purchase Agreement to be executed between Uttarakhand Power Corporation Limited and M/s Avani Bio Energy Pvt. Ltd.
In the matter of:
Uttarakhand Power Corporation Ltd. … Petitioner
In the matter of:
M/s Avani Bio Energy Pvt. Ltd … Respondent
Date of order 24.10.2017
In the matter of:
Petition filed under Section 62 & Section 86(1)(a) of the Electricity Act, 2003, read with the UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations, 2015, as amended till date for determination of tariff for the Control Period from FY 2016-17 till FY 2018-19 for supply of power to UPCL from 428 MW Gas based Kashipur Combined Cycle Power Plant of M/s Sravanthi Energy Pvt. Ltd. at Village Khaikhera, Kashipur, District Udhamsingh Nagar.
In the matter of:
Petition seeking approval of Business Plan for the Control Period starting from FY 2016-17 to FY 2018-19 for supply of 214 MW of power to UPCL from 428 MW Gas based Kashipur Combined Cycle Power Plant of Sravanthi Energy Private Ltd. at Village Khaikhera, Kashipur, District Udhamsingh Nagar, Uttarakhand.
In the matter of:
M/s Sravanthi Energy Pvt. Ltd. … Petitioner
Uttarakhand Power Corporation Ltd. ... Respondent
Date of order 28.09.2017
In the Matter of: Petition seeking investment approval on the project for implementing Integrated Automatic Meter Reading (IAMR) System on 12000 nos. of consumers to be executed on turnkey basis.
And In the Matter of: Uttarakhand Power Corporation Limited. (UPCL), Dehradun. …Petitioner.
Date of order 15.09.2017
In the matter of:
Petition for seeking carry forward of Renewable Purchase Obligation of FY 2016-17 amounting to 787.68 MU (Non-Solar) and 161.32 MU (Solar) as per the provisions of UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010.
In the matter of:
Date of orderUttarakhand Power Corporation Ltd. … Petitioner
In the matter of:
Date of orderUttarakhand Renewable Energy Development Agency (UREDA) … Respondent
Date of order 21.08.2017
Date of orderIn the Matter of: Condonation for delay in implementation of online issuance of NoC to Open Access Customers and submission of Action Plan for implementation of same under the provisions of Regulation 10 of UERC (Conduct of Business) Regulation, 2014.
Date of orderAnd In the Matter of: State Load Despatch Center, Power Transmission Corporation of Uttarakhand Ltd. (PTCUL) Saharanpur Road, Majra, Dehradun. ……..Petitioner
Date of order 21.08.2017
In the matter of:
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.07.2017 to 30.09.2017.
In the matter of:
Uttarakhand Power Corporation Ltd. … Petitioner
Date of order 09.08.2017
In the matter of: Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju-III Small Hydro Power Project of Uttar Bharat Hydro Power Pvt. Ltd.
In the matter of: M/s Uttar Bharat Hydro Power Pvt. Ltd. ..… Petitioner
In the matter of: Uttarakhand Power Corporation Ltd. ..... Respondent
Date of order 03.08.2017
In the matter of:
Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2017-18 and onwards till reviewed/revised by the Commission.
Date of order 03.08.2017
In the matter of:
Petition for review of the Commission’s Order dated 29.03.2017 on True up for FY 2015-16, Annual Performance Review for FY 2016-17 and Annual Revenue Requirement for FY 2017-18.
In the matter of:
Uttarakhand Power Corporation Ltd. …Petitioner
Date of order 18.07.2017
In the matter of:
Application seeking approval of the Commission on the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s RV Akash Ganga Solar Power Ltd.
In the matter of:
Uttarakhand Power Corporation Ltd. … Petitioner
In the matter of:
M/s RV Akash Ganga Solar Power Ltd. … Respondent
Date of order 29.06.2017
In the matter of:
Augmentation of 220 kV Substation SIDCUL Haridwar from 2x80 MVA (132/33 kV)+ 1x50 MVA (220/33 kV) to 2x80 MVA (132/33 kV)+1x50 MVA (220/33 kV)+1x25 MVA (220/33 kV) and construction of 01 No. of 220 kV T/F Bay, 01 No. 33 kV T/F Bay & 02 No. of 33 kV feeder Bay.
In the Matter of:
Power Transmission Corporation of Uttarakhand Limited (PTCUL)
Date of order 27.06.2017
In the matter of:
Petition for seeking prior approval of "Capital Investment for Renovation & Modernisation" of Dhakrani HEP (3 X 11.25 MW) of UJVN Ltd.
Petition seeking approval of the Commission for advance banking of power to Punjab State Power Corporation Ltd. under banking arrangement by Uttarakhand Power Corporation Ltd.
In the matter of:
Uttarakhand Power Corporation Ltd. … Petitioner
Date of order 01.06.2017
In the matter of:
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.04.2017 to 30.06.2017.
In the matter of:
Uttarakhand Power Corporation Ltd. … Petitioner
Date of order 29.05.2017
In the matter of:
Application seeking approval of the Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and UJVN Ltd.
In the matter of:
Uttarakhand Power Corporation Ltd. … Petitioner
AND
In the matter of:
UJVN Ltd. … Respondent
Date of order 25.05.2017
In the matter of:
Review Petition filed under Regulation 54 of UERC (Conduct of Business) Regulations, 2014 for review of the order dated 30th October, 2016 passed by the Commission in the matter of Re-determination of generic tariff for Pathri Small Hydro Generating Station (3X6.8 MW) of UJVN Ltd. under Section 62, 86 and 94(1)(f) of the Electricity Act, 2003 read with the relevant Regulations, Orders and Guidelines of the Commission.
In the matter of:
Review Petition filed under Regulation 54 of UERC (Conduct of Business) Regulations, 2014 for review of the order dated 30th October, 2016 passed by the Commission in the matter of Re-determination of generic tariff for Mohammadpur Small Hydro Generating Station (3X3.1 MW) of UJVN Ltd. under Section 62, 86 and 94(1)(f) of the Electricity Act, 2003 read with the relevant Regulations, Orders and Guidelines of the Commission.
In the matter of:
UJVN Ltd. … Petitioner
In the matter of:
Uttarakhand Power Corporation Ltd. … Respondent
Date of order 25.05.2017
In the Matter of: Misc. Application filed against the shifting of High Tension Line (33 KV) in Prakash Vihar, Haridwar Road, Dehradun under section 67(4) of The Electricity Act, 2003.
In the Matter of: Smt. Anita Gupta & Ors. …….............Petitioners Vs
Secretary (Energy), GoU, Secretariat, Dehradun
Managing Director, UPCL, Dehradun
Sr. Superintendent of Police, Dehradun ………….Respondents
Date of order 23.05.2017
In the matter of:
Suo-moto proceedings in the matter of Office Memorandum issued by UPCL regarding continuation of Continuous Power Supply Surcharge/Additional Surcharge on Power purchased through open access.
In the matter of:
Uttarakhand Power Corporation Ltd.
M/s India Glycols Ltd.
M/s Hindustan National Glass & Industries Ltd.
M/s Asahi India Glass Ltd.
M/s Vista Alps Industries Ltd.
M/s Kashi Vishwanath Textile Mill (P) Ltd.
M/s Air Liquid North India Pvt. Ltd. … Respondents
Date of order 16.05.2017
In the matter of:
Petition to extend the benchmark capital cost & generic tariff as declared by UERC vide its Order dated 16.06.2016, i.e. upto 31.07.2017 for Grid Interactive Rooftop and Small Solar Power Plants.
In the matter of:
Uttarakhand Renewable Energy Development Agency …Petitioner
In the matter of:
Uttarakhand Power Corporation Ltd. ...Respondent
Date of order 16.05.2017
In the matter of:
Application seeking prior approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Mittal Processors Pvt. Ltd. (MPP Ltd.), M/s GMR Energy Trading Ltd. (GMRET Ltd.) and M/s Tata Power Trading Company Ltd. (TPTC Ltd.) for procurement of Non-Solar RE Energy on Short term basis.
In the matter of:
Uttarakhand Power Corporation Ltd. … Petitioner
In the matter of:
M/s Mittal Processors Pvt. Ltd.
M/s GMR Energy Trading Ltd.
M/s Tata Power Trading Company Ltd. … Respondents
Date of order 16.05.2017
In the matter of:
Petition filed under Section 62 & Section 86(1)(a) of the Electricity Act, 2003, read with the UERC (Terms & Conditions for Determination of Tariff) Regulations, 2011 and UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations, 2015 for determination of tariff for FY 2015- 16 & for the Control Period from FY 2016-17 till FY 2018-19 for supply of power to UPCL from 214 MW Gas based Kashipur Combined Cycle Power Plant of M/s Gama Infraprop Pvt. Ltd. at Mahuakhedaganj, Kashipur, District Udhamsingh Nagar.
In the matter of:
Petition seeking approval of Business Plan for the Control Period starting from FY 2016-17 to FY 2018-19 for 214 MW Gas based Kashipur Combined Cycle Power Plant of Gama Infraprop Private Ltd. at Mahuakhedaganj, Kashipur, District Udhamsingh Nagar, Uttarakhand.
In the matter of:
M/s Gama Infraprop Pvt. Ltd. … Petitioner
In the matter of:
Uttarakhand Power Corporation Ltd. ... Respondent
Date of order 15.05.2017
In the matter of: Application seeking approval for the investment for improvement of Bill Collection Facilities of UPCL in lieu of the Order dated 01.09.2005 passed by the Commission.
In the matter of: Uttarakhand Power Corporation Ltd. (UPCL) ...Petitioner
Date of order 09.05.2017
In the matter of: Petition to relax or vary the provisions of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007 and UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013 whereby the penalty was imposed in the matter of delay in release of new LT service connections for the period of FY 2008-09 to FY 2015-16.
In the matter of: Uttarakhand Power Corporation of Ltd. (UPCL) ...Petitioner
Date of order 03.05.2017
In the Matter of: Petition filed under Regulation 37(1) of the UERC(Conduct of Business) Regulations, 2014, Clause 3.2 and 14.A of the Transmission License read with Section 18 of the Electricity Act and other relevant provisions of the Electricity Act, 2003 for amending the terms and condition of the Transmission License of Power Transmission Corporation of Uttarakhand.
In the Matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) Vidyut Bhawan, Near ISBT Crossing, Saharanpur Road, Majra, Dehradun.
Date of order 01.05.2017
In the matter of:
Approval for Construction of Separate Building of SLDC at 132 kV Sub-Station
Majra Campus, Dehradun.
In the Matter of:
Power Transmission Corporation of Uttarakhand Limited (PTCUL)
Date of order 17.04.2017
In the matter of:
Petition to review/reconsider the Order dated January 25, 2017 passed by the Commission in the matter of petition filed by M/s GIPL for amendment of Clause No. 9 relating to "Billing and Payment", Clause No. 1.1.32 relating to "Due Date" and Clause No. 9.4 relating to "Payment Security Mechanism" of Power Purchase Agreement for procurement of 107 MW of Power on Long Term Basis between 225 MW Gas based Combined Cycle Power Plant of Gama Infraprop Pvt. Ltd. at Mahuakhedaganj, Kashipur & Uttarakhand Power Corporation Ltd. (UPCL).
In the matter of:
Uttarakhand Power Corporation Ltd. … Petitioner
In the matter of:
M/s Gama Infraprop (P) Ltd. … Respondent No. 1
M/s Sravanthi Energy Pvt. Ltd. … Respondent No. 2
M/s Beta Infratech Pvt. Ltd. … Respondent No. 3
Date of order 12.04.2017
In the matter of:
Petition filed under Regulation 9, 20, 58, 59, 61 and 62 of the UERC (Conduct of Business Regulations), 2014 and Regulation 49 and 50 of UERC RE Regulation, 2013 for adjudication of dispute and other matter between UPCL and 04 Nos. Solar Power Generators.
In the matter of:
M/s Vivan Solar Pvt. Ltd.
M/s Purshotam Industries Ltd.
M/s Purshotam Ispat
M/s Eastman International … Petitioners
In the matter of:
Uttarakhand Power Corporation Ltd. ... Respondent
Date of order 12.04.2017
In the matter of:
Application seeking approval of the Uttarakhand Electricity Regulatory Commission on the draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Melkhet Power Private Limited.
In the matter of:
Uttarakhand Power Corporation Ltd. … Petitioner
In the matter of:
M/s Melkhet Power Private Ltd. …Respondent-1
Power Transmission Corporation of Uttarakhand Ltd. …Respondent-2
Date of order 06.04.2017
In the matter of:
Approval of Capital Investments under Para 11 of the Transmission Licence involving
following works:
Procurement and Stringing of 132 kV Roorkee-Laksar line by replacing existing Wolf/Panther conductor with ACCC (HTLS) Casablanca conductor.
Procurement and Stringing of 132 kV Roorkee-Manglore line by replacing existing Wolf/Panther conductor with ACCC (HTLS) Casablanca conductor.
Construction of 132/33 kV sub-station, Patanjali Padartha, Haridwar and LILO of 132 kV Chilla-Nazibabad line at 132/33 kVsub-station, Patanjali Padartha,
Haridwar.
Replacement of ACSR wolf conductor in double circuit of Khatima-Pilibhit line by HTLS conductor.
Replacement of ACSR Panther Conductor in 132 kV Sitarganj (PGCIL)-SIDCUL Sitarganj single Circuit line with HTLS
conductor
Replacement of ACSR Panther conductor in first circuit of 132 kV Kichha- Sitarganj Line with HTLS conductor.
In the Matter of:
Power Transmission Corporation of Uttarakhand Limited (PTCUL)
Date of order 06.04.2017
In the Matter of: Capital Investment for the investment on the works covered under centrally funded Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY) of Ministry of Power (MoP), Govt. of India (GoI).
And In the Matter of: Uttarakhand Power Corporation Limited. (UPCL), Victoria Cross Vijeyta Gabar Singh Urja Bhawan, Kanwali Road, Dehradun. …...Petitioner
Date of order 29.03.20017
In the matter of:
Applicability of Rate Schedule RTS-4A: Agriculture Allied Activities on the connection no. 557 issued to M/s Flex Foods Limited at their Mushroom Farm at Chidderwala, Dehradun.
In the matter of:
Uttarakhand Power Corporation Ltd. … Respondent
Date of order 23.03.2017
In the matter of:
Installation of 18 kWp capacity Grid Connected Rooftop Solar Power Plant at Uttarakhand Electricity Regulatory Commission (UERC) building, Dehradun sanctioned by M/s PFC Ltd. under IPDS Programme.
In the matter of:
Uttarakhand Power Corporation Limited (UPCL) ...Respondent
Date of order 16.03.2017
In the Matter of:
Petition seeking determination of project specific tariff for 10.5 MW Small Hydro Power Project under Section 62 and 86 of the Electricity Act, 2003 read with Regulation 13 of Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Nonconventional and Renewable Energy Sources) Regulations, 2013.
In the matter of:
Uttar Bharat Hydro Power Pvt. Ltd. …Petitioner
In the matter of:
Uttarakhand Power Corporation Ltd. …Respondent
Date of order 10.03.2017
In the matter of:
Petition seeking approval of the Commission on the Power Purchase Agreement proposed to be executed between Uttarakhand Power Corporation Ltd. and M/s K. Ramachandra Rao Transmission & Projects Pvt. Limited.
In the matter of:
Uttarakhand Power Corporation Ltd. …Petitioner
M/s K. Ramachandra Rao Transmission & Projects Pvt. Limited ...Respondent
Date of order 08.03.2017
In the Matter of: Application seeking approval for the investment on the following projects:
Construction of 9 Nos. 33/11 kV S/s and their associated lines of 109.40 km.
Construction of 06 No. feeders from 132/33 kV S/s Laltappar.
Augmentation of 11 Nos. 33/11 kV Sub-stations.
And In the Matter of: Uttarakhand Power Corporation Limited. (UPCL), Victoria Cross, Vijeta Gabar Singh Urja Bhawan, Kanwali Road, Dehradun. …….…...Petitioner
Date of order 01.03.2017
In the Matter of: Approval of 09 nos. projects under Capital Investments under Para 11 of the Transmission Licence involving various works of System Improvement.
In the Matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL)
Date of order 17.02.2017
In the matter of: Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited & M/s Beta Infratech Pvt. Ltd.
In the matter of: Uttarakhand Power Corporation Ltd. …Petitioner
In the matter of: M/s Beta Infratech Pvt. Ltd. ...Respondent No. 1
Power Transmission Corporation of Uttarakhand Ltd. ...Respondent No. 2
Date of order 10.02.2017
In the matter of: Petition under Section 62 and Section 86 (1) (a) of the Electricity Act, 2003, read with the UERC (Terms and Conditions for Determination of Tariff) Regulations, 2011 (in short, UERC MYT Regulations, 2011) and UERC (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2015, as amended till date (in short, UERC MYT Regulations, 2015) for determination of tariff for FY 2016-17 and for the Control Period from FY 2016-17, 2017-18 till FY 2018-19 for supply of power to Uttarakhand Power Corporation Limited (UPCL) from 214 MW Gas based Kashipur Combined Cycle Power Plant of Beta Infratech Pvt. Ltd. at Mahuakheraganj, Kashipur, District Udhamsinghnagar, Uttarakhand.
In the matter of: M/s Beta Infratech Pvt. Ltd. … Petitioner
In the matter of: Uttarakhand Power Corporation Ltd. ... Respondent
Date of order 10.02.2017
In the Matter of: Approval of Capital Investments under Para 11 of the Transmission Licence involving following works of System Improvement:
Augmentation of 132 kV S/s Bindal from 2x40 MVA to 3x40 MVA by procurement, installation & commissioning of 132/33 kV, 40 MVA Transformer at 132 kV S/s Bindal, Dehradun.
Augmentation of Transformation capacity from 2x40 MVA to 3x40 MVA by commissioning of 01 no. additional 132/33 kV, 40 MVA Transformer, HV & LV Bay & Oil pit for NIFDES & Construction of 03 Nos. new 33 kV Feeder Bays at 132 kV S/s Jashodharpur, Kotdwar (Pauri Garhwal).
And In the Matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL)
Date of order 07.02.2017
In the Matter of: Approval of 09 nos. projects under Capital Investments under Para 11 of the Transmission Licence involving various works of System Improvement.
In the Matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL)
Date of order 06.02.2017
In the Matter of: Investment Approval for Shifting of 132 kV lines in Dev Sanskriti Vishvavidyalaya Campus for Shri Vedmata Gayatri Trust, Shantikunj, Haridwar.
In the Matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) Vidyut Bhawan, Near ISBT Crossing, Saharanpur Road, Majra, Dehradun.
In the matter of: Uttarakhand Power Corporation Ltd. (UPCL) ........Respondent No. 1
In the matter of: Petition seeking determination of provisional tariff in anticipation of completion of Tanga Small Hydropower Project (5MW) of Himalaya Hydro Pvt. Ltd., as per Regulation 13, sub-clause (2) and Regulation 10, sub-clause (2) (option for fixation of "Project Specific Tariff") of UERC (Tariff and other terms for supply of electricity from non-conventional and renewable energy sources) Regulations, 2013.
In the matter of: M/s Himalaya Hydro Pvt. Ltd. …Petitioner
In the matter of: Uttarakhand Power Corporation Ltd. ...Respondent
Date of order 25.01.2017
In the matter of: Petition filed for amendment of Clause No. 9 relating to "Billing and Payment", Clause No. 1.1.32 relating to "Due Date" and Clause No. 9.4 relating to "Payment Security Mechanism" of Power Purchase Agreement for procurement of 107 MW of Power on Long Term Basis between 225 MW Gas based Combined Cycle Power Plant of Gama Infraprop Pvt. Ltd. at Mahuakhedaganj, Kashipur and Uttarakhand Power Corp. Ltd. (UPCL).
In the matter of: M/s Gama Infraprop (P) Ltd. … Petitioner
In the matter of: Uttarakhand Power Corporation Ltd. ... Respondent
Date of order 16.01.2017
In the matter of: Application seeking approval of the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Uttar Bharat Hydro Power Private Limited.
In the matter of: Uttarakhand Power Corporation Ltd. … Petitioner
In the matter of: M/s Uttar Bharat Hydro Power (P) Ltd. … Respondent
Date of order 16.01.2007
In the matter of: Application seeking approval of the Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Khutani Power Company Private Limited.
In the matter of: Uttarakhand Power Corporation Ltd. … Petitioner
In the matter of: M/s Khutani Power Company (P) Ltd. … Respondent
Date of order 12.01.2017
In the matter of: Petition filed by UPCL to review/reconsider the personal penalty imposed vide Order dated 05th October, 2016 issued by the Commission in the matter of suo-moto proceedings initiated by the Commission against non-compliance by UPCL of the Commission’s Order dated 20.06.2016 for procurement of non-solar RECs equivalent to 7.50% of unmet non-solar RPO up to FY 2015-16.
In the matter of: Uttarakhand Power Corporation Ltd. … Petitioner
Date of order 11.01.2017
In the matter of: Waiver and refund of penalty imposed by the Commission vide its Order dated 01.09.2005.
In the matter of: Uttarakhand Power Corporation Ltd. (UPCL) …Petitioner
Miscellaneous Orders-Year-2016
Date of order 28.12.2016
In the matter of:Targets for Renewable Purchase Obligation of FY 2016-17 & FY 2017-18 in accordance with the UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2013.
Date of order 26.12.2016
In the matter of:Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s Greenko Budhil Hydro Power Pvt. Ltd.
In the matter of: Uttarakhand Power Corporation Ltd. … Petitioner
AND In the matter of:M/s Greenko Budhil Hydro Power Pvt. Ltd. … Respondent
Date of order 23.12.2016
In the matter of:Review Petition filed under Regulation 54 of UERC (Conduct of Business) Regulations, 2014 for review of the order dated 28th October, 2016 passed by the Commission in the matter of Adjudication of dispute under Section 86(1)(f) between Uttar Bharat Hydro Power (P) Ltd. and Uttarakhand Power Corporation Ltd. in respect of 10.5 MW Sarju-III Small Hydro Power Project.
In the matter of: Uttarakhand Power Corporation Ltd. … Petitioner
AND In the matter of:M/s Uttar Bharat Hydro Power (P) Ltd. … Respondent
Date of order 08.12.2016
In the Matter of: Petition seeking approval on the projects covering construction of 16 Nos. 33/11 kV substation and their associated lines of 131.34 Km.
AND In the Matter of: Uttarakhand Power Corporation Limited. (UPCL), Victoria Cross, Vijeyta Gabar Singh Bhawan, Urja Bhawan, Kanwali Road, Dehradun. …….…...Petitioner
Date of order 08.12.2016
In the matter of: Adjudication of dispute under Section 86(1)(f) of the Electricity Act, 2003 between Uttar Bharat Hydro Power Private Limited and Uttarakhand Power Corporation Limited in respect of 12.6 MW Sarju II Hydro Power Project.
In the matter of: M/s Uttar Bharat Hydro Power Pvt. Ltd. ...Petitioner AND In the matter of: Uttarakhand Power Corporation Limited (UPCL) ...Respondent
AND Petition No. 36 of 2016 In the matter of: Relaxation in RE Regulations, 2013 in respect to Sarju-II & Sarju-III SHPs of M/s UBHP Ltd. for restriction of any claim under deemed generation on account of the restraint in evacuation system caused due to allowance of evacuation of power from Sarju-II SHP, till the under constructed 33 kV line between Bageshwar and Kapkote on panther conductor is completed.
In the matter of: Uttarakhand Power Corporation Limited (UPCL) ...Petitioner In the matter of: M/s Uttar Bharat Hydro Power Pvt. Ltd. ...Respondent
Date of order 30.11.2016
In the matter of: Petition under Sections 62 and 86(1)(a) of the Electricity Act, 2003 read with the relevant provisions of UERC (Terms & Conditions for Determination of Tariff) Regulations, 2011, UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations, 2015 for determination of tariff for supply of power from the Petitioner’s 70 MW Hydro Electric power project to UPCL.
AND In the Matter of: Petition seeking approval of the Business Plan under Sections 62 and 86(1)(a) of the Electricity Act, 2003 read with the Regulation 8 of UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations, 2015 and as per order dated 20.11.2015 passed by the Commission.
In the matter of: M/s Greenko Budhil Hydro Power Pvt. Ltd. …Petitioner AND In the matter of: Uttarakhand Power Corporation Ltd. (UPCL) ...Respondent
Date of order 30.11.2016
In the matter of: In the matter of: Petition to determine the project specific tariff of Chamoli extension mini hydro power project of capacity 3 MW on cost plus approach. In the matter of: Uttarakhand Renewable Energy Development Agency … Petitioner AND In the matter of: Uttarakhand Power Corporation Ltd. ... Respondent
Date of Order 30.11.2016
In the matter of:Petition under Sections 62 and 86(1)(a) of the Electricity Act, 2003 read with the relevant provisions of UERC (Terms & Conditions for Determination of Tariff) Regulations, 2011, UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations, 2015 for determination of tariff for supply of power from the Petitioner’s 70 MW Hydro Electric power project to UPCL.
AndIn the matter of:Re-determination of generic tariff for Mohammadpur Small Hydro Generating Station (3 X 3.1 MW) of UJVN Ltd. under Section 62, 86 and 94(1)(f) of the Electricity Act, 2003 read with the relevant Regulations, Orders and Guidelines of Commission. In the matter of: UJVN Ltd. ...Petitioner AndIn the matter of:Uttarakhand Power Corporation Ltd. …Respondent
Date of order 15.11.2016
In the matter of: Application seeking to abolish the Minimum Consumption Guarantee (MCG) on electricity connections issued for PTW in the State of Uttarakhand
In the matter of: Uttarakhand Power Corporation Ltd. … Petitioner
Date of Order 09.11.2016
In the matter of: Petition seeking removal of difficulty in implementing the Prepaid Metering Scheme provided in Tariff Order for FY 2016-17 dated 5th April, 2016.
In the matter of: Uttarakhand Power Corporation Ltd. … Petitioner
Date of Order 09.11.2016
In the matter of: Application seeking prior approval of the Commission on the Draft Power Purchase Agreement for short term power purchase between Uttarakhand Power Corp. Ltd. and M/s Tata Power Trading Company Ltd. (TPTCL), M/s NTPC Vidyut Vyapar Nigam Ltd. (NTPC VVN Ltd.), M/s PTC India Ltd. and M/s GMR Energy Trading Ltd. In the matter of: Uttarakhand Power Corporation Ltd. … Petitioner
Date of Order 28.10.2016
In the matter of: Adjudication of dispute under Section 86(1)(f) between Uttar Bharat Hydro Power (P) Ltd. and Uttarakhand Power Corporation Ltd. in respect of 10.5 MW Sarju III Small Hydro Power Project. In the matter of: M/s Uttar Bharat Hydro Power (P) Ltd. … Petitioner
AND In the matter of: Uttarakhand Power Corporation Ltd. … Respondent
Date of Order 25.10.2016
In the Matter of: Investment Approval for construction of 2x25 MVA, 220/33 kV S/s Baram (Jauljivi) and construction of LILO line of one Circuit 220 kV Dhauliganga- Pithoragarh (PGCIL) line at proposed 2x25 MVA), 220/33 kV S/s Baram (Jauljivi). AND In the Matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) Vidyut Bhawan, Near ISBT Crossing, Saharanpur Road, Majra, Dehradun. .........Petitioner>
Date of Order 05.10.2016
In the matter of:
Application seeking approval of the Commission on the Power Purchase Agreement between:
UPCL and M/s Rajesh Kumar Singh.
UPCL and M/s Pradeep Kumar Bansal.
UPCL and M/s Himalaya Plastic Products.
UPCL and M/s Bhagwati Prasad.
UPCL and M/s Chanchal Singh.
UPCL and M/s SS Engineering (Eligible Consumer) & M/s Amplus Infrastructure Developers Pvt. Ltd. (Third Party Owner).
UPCL and M/s Jain Amar Industries (Eligible Consumer) & M/s Amplus Energy Solution Pvt. Ltd. (Third Party Owner).
UPCL and M/s Raj Kumar (Eligible Consumer) & Sai Yash Solar Systems (Third Party Owner).
In the matter of:
Uttarakhand Power Corporation Ltd. … Petitioner
AND In the matter of:
1. Sh. Rajesh Kumar Singh
2. Sh. Pradeep Kumar Bansal
3. M/s Himalaya Plastic Products
4. Sh. Bhagwati Prasad
5. Sh. Chanchal Singh
6. M/s SS Engineering & M/s Amplus Infrastructure Developers Pvt. Ltd.
7. M/s Jain Aman Industries & M/s Amplus Energy Solution Pvt. Ltd.
8. Sh. Raj Kumar & M/s Sai Yash Solar Systems …Respondents
Date of Order 05.10.2016
In the Matter of: Approval of Capital Investment under Para 11 of the Distribution and Retail Supply License [License No. 2 of 2003] for investment on the Integrated Power Development Scheme Project, Ministry of Power (MoP), Government of India (GoI).
AND In the Matter of: Uttarakhand Power Corporation Limited. (UPCL), Victoria Cross, Vijeyta Gabar Singh Bhawan, Urja Bhawan, Kanwali Road, Dehradun. …...Petitioner
Date of Order 05.10.2016
In the matter of:Suo moto proceedings initiated by the Commission against non-compliance by UPCL of the Commission’s Order dated 20.06.2016 for procurement of non-solar RECs equivalent to 7.50% of unmet non-solar RPO up to FY 2015-16.
In the matter of:Uttarakhand Power Corporation Ltd. … Respondent
Date of Order 05.10.2016
In the matter of:
Application seeking revision of the Renewable Purchase Obligation of FY 2016-17 & FY 2017-18 as per the provisions of the Uttarakhand Electricity Regulatory Commission (Compliance of Renewable Purchase Obligation) Regulations, 2010 read with the Order dated 22 July 2016 of Ministry of Power, GoI.
In the matter of:Uttarakhand Power Corporation Ltd. … Petitioner AND In the matter of:Uttarakhand Renewable Energy Development Agency ... Respondent
Date of Order 04.10.2016
In the matter of:Application seeking prior approval of Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/s Manikaran Power Limited for procuring Non-Solar RE Energy on short term basis. In the matter of:
Uttarakhand Power Corporation Limited … Petitioner
Date of order 20.09.2016
In the matter of:Petition filed under Section 62 and 86(1)(a) of the Electricity Act , 2003, read with the relevant provisions of the Uttarakhand Electricity Regulatory Commission (Terms & Conditions for determination of Multi-Year Tariff) Regulations, 2015 and Chapter VII of UERC (Conduct of Business) Regulations, 2014, for determination of Tariff for supply of power from 96 MW Jorethang Loop Hydro-Electric project of the Petitioner to Uttarakhand Power Corporation Ltd.
In the matter of: M/s Dans Energy Pvt. Ltd. .... Petitioner AND In the matter of: Uttarakhand Power Corporation Ltd. …Respondent
Date of order 20.09.2016
In the matter of:Petition to extend the commissioning Date of 23 Solar PV Power Plants (cumulative capacity 181.40 MW) upto 31 January, 2017.
In the matter of:Uttarakhand Renewable Energy Development Agency (UREDA) .... Petitioner ANDIn the matter of:Uttarakhand Power Corporation Ltd. ... Respondent No. 1 Power Transmission Corporation of Uttarakhand Ltd. ... Respondent No. 2
Date of order 20.09.2016
In the matter of:Petition seeking review of the order of the Commission dated July 8, 2016 in the petition for adjustment of tariff for Vanala SHPs (15 MW) unit of M/s Him Urja Pvt. Ltd. as per Section 61 & 62 of the Electricity Act, 2003.
In the matter of:M/s Him Urja Pvt. Ltd. .... Petitioner And In the matter of:Uttarakhand Power Corporation Ltd. …Respondent
Date of order 20.09.2016
In the matter of:
1. Offence of misleading the electricity consumers of the State by publishing wrongful interpretation of the provisions of the UERC(Release of new LT Connections, Enhancement and Reduction of Loads) Regulations, 2013.
2. Contravention of Regulation 7 of UERC (Release of new LT Connections, Enhancement and Reduction of Loads) Regulations, 2013. And In the matter of:
1. S.S Yadav, Managing Director, UPCL, Dehradun.
2. A.K Agarwal, Director (Operations), UPCL, Dehradun.
3. H.K Gururani, Chief Engineer (Distribution), UPCL, Kumaon Zone, Haldwani.
4. Navin Mishra, Executive Engineer, UPCL, EDD Haldwani (Urban)
5.Nitin Singh Garkhal, Executive Engineer, UPCL, EDD, Ramnagar, Nanital …...Respondents
Date of order 14.09.2016
In the matter of: Petition for seeking prior approval of "Capital Investment for Renovation & Modernisation" of Dhalipur HEP (3 X 17 MW) of UJVN Ltd.
And In the matter of: UJVN Ltd., "UJJWAL", Maharani Bag, GMS Road, Dehradun. ...Petitioner AND
Uttarakhand Power Corporation Ltd. (UPCL), Dehradun ...Respondent 1
Himachal Pradesh State Electricity Board Ltd. (HPSEB Ltd.) Vidyut Bhawan, Kumar House, Shimla (H.P.) ...Respondent 2
Date of order 08.09.2016
In the matter of:
Application seeking approval of the Commission on the Model Power Purchase Agreement between Uttarakhand Power Corporation Limited and Grid Interactive Rooftop and Small Solar PV Power Plant.
In the matter of:
Uttarakhand Power Corporation Limited … Petitioner In the matter of:
Uttarakhand Renewable Energy Development Agency (UREDA) … Respondent
Date of order 06.09.2016
In the matter of:
Application seeking prior approval of the Commission on the Draft Power Purchase Agreement for short term between Uttarakhand Power Corp. Ltd. and M/s Manikaran Power Ltd.
In the matter of:
Uttarakhand Power Corporation Limited … Petitioner
Date of order 05.09.2016
In the matter of:Petition for approval of the ‘Date of Commercial Operation’ (COD) of the damaged/non-functional 8 Small Hydro Power Plants (SHPs) on the date when the SHPs would start operating after renovation & modernisation works.
In the matter of:Uttarakhand Renewable Energy Development Agency … Petitioner AND In the matter of:Uttarakhand Power Corporation Ltd. … Respondent 1
UJVN Ltd. … Respondent 2
Date of order 09.08.2016
In the matter of:
Petition under Section 62 & Section 86(1)(a) of the Electricity Act, 2003, read with the UERC (Terms & Conditions for Determination of Tariff) Regulations, 2011 and UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations, 2015 as amended till date for determination of tariff for the Control Period from FY 2016-17 till FY 2018-19 for supply of power to UPCL from 428 MW Gas based Combined Cycle Power Plant of M/s Sravanthi Energy Private Limited at Village Khaikhera, Kashipur, District Udhamsingh Nagar, Uttarakhand.
In the matter of:M/s Sravanthi Energy Private Limited … Petitioner AND
Uttarakhand Power Corporation Ltd. ... Respondent
Date of order 09.08.2016
In the matter of:Petition filed under Section 62 and 86(1)(a) of the Electricity Act , 2003, read with the relevant provisions of the Uttarakhand Electricity Regulatory Commission (Terms & Conditions for determination of Multi-Year Tariff) Regulations, 2015 and Chapter VII of UERC (Conduct of Business) Regulations, 2014, for determination of Tariff for supply of power from 96 MW Jorethang Loop Hydro-Electric project of the Petitioner to Uttarakhand Power Corporation Ltd.
In the matter of:M/s Dans Energy Pvt. Ltd. .... Petitioner AND In the matter of:Uttarakhand Power Corporation Ltd. …Respondent
Date of order 29.07.2016
In the matter of:23 Petitions filed by UPCL seeking approval of the Commission on the Power Purchase Agreement entered into between:
1. UPCL & M/s Impex India.
2. UPCL & M/s Devishi Renewable Energy Pvt. Ltd.
3. UPCL & M/s Devishi Solar Power Pvt. Ltd.
4. UPCL & M/s PL Solar Renewable Ltd.
5. UPCL & M/s Bindookhadak Solar Projects Pvt. Ltd.
6. UPCL & M/s Haridwar Solar Projects Pvt. Ltd.
7. UPCL & M/s Haridwar Solar Projects Pvt. Ltd.
8. UPCL & M/s Shakumbhari Solar Power Projects Pvt. Ltd.
9. UPCL & M/s Ballupur Solar Projects Pvt. Ltd.
10. UPCL & M/s Bhagwanpur Solar Projects Pvt. Ltd.
11. UPCL & M/s Technique Solaire Invest 1 India Pvt. Ltd.
12. UPCL & M/s PL Sunrays Power Ltd.
13. UPCL & M/s PL Surya Vidyut Ltd.
14. UPCL & M/s Emami Power Ltd.
15. UPCL & M/s Sunworld Energy Pvt. Ltd.
16. UPCL & M/s Eminent Solar Power Pvt. Ltd.
17. UPCL & M/s Chudiala Solar Power Projects Pvt. Ltd.
18. UPCL & M/s A.R. Solar Power.
19. UPCL & M/s Hydro Power Engineers.
20. UPCL & M/s A.R. Solar Power.
21. UPCL & M/s Makin Developers Pvt. Ltd.
22. UPCL & M/s RP Infrapower (P) Ltd.
23. UPCL & M/s Vishal Techno Commerce Ltd. AND In the matter of:Uttarakhand Power Corporation Ltd. … Petitioner AND In the matter of:
1. M/s Impex India
2. M/s Devishi Renewable Energy Pvt. Ltd.
3. M/s Devishi Solar Power Pvt. Ltd.
4. M/s PL Solar Renewable Ltd
5. M/s Bindookhadak Solar Projects Pvt. Ltd.
6. M/s Haridwar Solar Projects Pvt. Ltd.
7. M/s Haridwar Solar Projects Pvt. Ltd.
8. M/s Shakumbhari Solar Power Projects Pvt. Ltd.
9. M/s Ballupur Solar Projects Pvt. Ltd.
10. M/s Bhagwanpur Solar Projects Pvt. Ltd.
11. M/s Technique Solaire Invest 1 India Pvt. Ltd.
12. M/s PL Sunrays Power Ltd.
13. M/s PL Surya Vidyut Ltd.
14. M/s Emami Power Ltd.
15. M/s Sunworld Energy Pvt. Ltd.
16. M/s Eminent Solar Power Pvt. Ltd.
17. M/s Chudiala Solar Power Projects Pvt. Ltd.
18. M/s A.R. Solar Power.
19. M/s Hydro Power Engineers.
20. M/s A.R. Solar Power.
21. M/s Makin Developers Pvt. Ltd.
22. M/s RP Infrapower (P) Ltd.
23. M/s Vishal Techno Commerce Ltd. ..… Respondents
Date of order 27.07.2016
In the Matter of: Investment Approval for Procurement, Erection & Commissioning of 40 MVA, 132/33 kV Transformer and replacing the defective Transformer at 132 /33 kV Sub-station Roorkee.
AND In the Matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) Vidyut Bhawan, Near ISBT Crossing, Saharanpur Road, Majra, Dehradun. .........Petitioner
Date of order 20.07.2016
In the matter of:Application seeking approval of UERC on the Draft Power Purchase Agreement between UPCL & Sravanthi Energy Pvt. Ltd.
In the matter of:Uttarakhand Power Corporation Ltd. …Petitioner AND
M/s Sravanthi Energy Pvt. Ltd. ...Respondent No. 1
Power Transmission Corporation of Uttarakhand Ltd. ...Respondent No. 2
Date of order 19.07.2016
In the matter of: Petition filed under Regulation 27(2) and 41 of the UERC (Terms and Conditions of Intra-State Open Access) Regulations, 2015 read with Regulations, 59 UERC (Conduct of Business) Regulations, 2014 for seeking approval for fixing the cost of ABT check meters.
AND In the matter of: Uttarakhand Power Corporation Ltd. (UPCL) Victoria Cross Vijeta Gabar Singh Bhawan, Kanwali Road, Dehradun. …... Petitioner &
1. M/s BST Textile Mills Pvt. Ltd., Udham Singh Nagar
2. M/s Rukmani Iron Pvt. Ltd., Haridwar
3. M/s Alps Industries Ltd., Haridwar .......Respondents
Date of order 19.07.2016
In the matter of:Application seeking prior approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corp. Ltd. and M/s Manikaran Power Ltd. for procuring Non-Solar RE Energy on short term basis.
In the matter of:Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and Sh. Rakesh Kumar.
In the matter of:Uttarakhand Power Corporation Ltd. … Petitioner AND In the matter of:Sh. Rakesh Kumar … Respondent
Date of order 15.07.2016
In the matter of:Application seeking prior approval of the Commission on the Draft Power Purchase Agreement for short term power purchase between Uttarakhand Power Corp. Ltd. and M/s Tata Power Trading Company Ltd. (TPTCL), M/s PTC India Ltd. & M/s Adani Enterprises Ltd.
In the matter of: Uttarakhand Power Corporation Ltd. … Petitioner
Date of order 13.07.2016
In the matter of:Application seeking approval of the Commission on the Power Purchase Agreement between UPCL and Grid Interactive Rooftop & Small Solar PV Generators under Suryodaya Swarozgar Yozna.
In the matter of:Uttarakhand Power Corporation Ltd. … Petitioner AND In the matter of:Uttarakhand Renewable Energy Development Agency … Respondent
Date of order 11.07.2016
In the matter of: Petition for review of the Order dated 5th April, 2016 issued by the Commission on approval of Business Plan and determination of Multi Year Tariff for the second Control Period FY 2016-17 to FY 2018-19, True up of FY 2014-15 and Annual Performance Review for FY 2015-16 for Power Transmission Corporation of Uttarakhand Ltd.
AND In the matter of:Power Transmission Corporation of Uttarakhand Ltd. …Petitioner AND In the matter of: Uttarakhand Power Corporation Ltd. ...Respondent
Date of order 08.07.2016
In the matter of:Petition seeking adjustment of tariff of Vanala Small Hydro Project (15 MW) unit of M/s Him Urja Pvt. Ltd. as per Section 61 and 62 of the Electricity Act, 2003 read with Regulation 16(3) & 25 of UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010, as amended from time to time and Regulation 3 & 4 (4) of the UERC (Terms & Conditions for Truing Up of Tariff) Regulations, 2008.
In the matter of: M/s Him Urja Pvt. Ltd. … Petitioner AND In the matter of: Uttarakhand Power Corporation Ltd. ... Respondent
Date of order 08.07.2016
In the matter of:Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Avani Bio Energy Pvt. Ltd. (33 kV Grid Sub-station at Kunatta, Pithoragarh, Uttarakhand).
AND
Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Avani Bio Energy Pvt. Ltd. (33 kV Grid Sub-station at Raiagar, Tripuradevi, Pithoragarh, Uttarakhand).
In the matter of: Uttarakhand Power Corporation Ltd. … Petitioner AND
M/s Avani Bio Energy Pvt. Ltd. ... Respondent
Date of order 05.07.2016
In the Matter of: Payment of Penalty as per sub-section 3 of Section 43 of the Electricity Act, 2003 and sub-Regulation 12 of Regulation 5 of UERC(Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2007/ sub-Regulation 14 of Regulation 5 of UERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations, 2013 and Commissions direction dated 29.01.2016.
AND In the matter of: Uttarakhand Power Corporation Ltd. (UPCL), Victoria Cross Vijeyta Gabar Singh Bhawan, Urja Bhawan, Kanwali Road, Dehradun.
Date of order 21.06.2016
In the matter of: Petition for seeking approval of the Commission on Tender Document for Short Term Power Procurement.
In the matter of: Uttarakhand Power Corporation Ltd. … Petitioner
Date of order 20.06.2016
In the matter of: Petition seeking carry forward of Renewable Purchase Obligation for FY 2014-15 amounting to 526.8 MU (Non-Solar) and 2.5 MU (Solar).
AND In the matter of:Petition seeking carry forward of Renewable Purchase Obligation for FY 2015-16 amounting to 699.6 MU (Non-Solar) and 8.1 MU (Solar), as per the provisions of UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010. In the matter of:Uttarakhand Power Corporation Ltd. …Petitioner AND In the matter of:Uttarakhand Renewable Energy Development Agency ...Respondent
Date of order 17.06.2016
In the matter of: Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and UJVN Ltd. (4.5 MW Canal Bank Grid connected Solar PV Plant).
AND
Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and UJVN Ltd. (1 MW Canal Top Grid connected Solar PV Plant).
AND
Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and UJVN Ltd. (7.5 MW Canal Bank Grid connected Solar PV Plant).
AND
Application seeking approval of the Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and UJVN Ltd. (7 MW Canal Bank Grid connected Solar PV Plant). In the matter of: Uttarakhand Power Corporation Ltd. … Petitioner AND In the matter of: UJVN Ltd. ... Respondent
Date of order 16.06.2016
In the matter of: Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2016-17 and onwards till reviewed/revised by the Commission.
Date of order 08.06.2016
In the matter of:Adjudication of dispute under Section 86(1)(f) between Uttar Bharat Hydro Power (P) Ltd. and Uttarakhand Power Corporation Ltd. in respect of 10.5 MW Sarju III Small Hydro Power Project.
In the matter of:M/s Uttar Bharat Hydro Power (P) Ltd. … Petitioner AND In the matter of: Uttarakhand Power Corporation Ltd. … Respondent
Date of order 08.06.2016
In the matter of: Suo-Moto proceedings on non-compliance of Renewable Purchase Obligation (RPO) by UPCL in accordance with UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010 & UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2013.
In the matter of:
1. Sh. S.K. Tamta,
Chief Engineer Level-1 (Comml.),
Uttarakhand Power Corporation Ltd.,
Dehradun.
2. Sh. A.K. Singh,
Chief Engineer (Pro. & Comml.),
Uttarakhand Power Corporation Ltd.,
Dehradun.
3. Sh. Sunil Vaid,
Suprerintending Engineer (Comml.),
Uttarakhand Power Corporation Ltd.,
Dehradun.
4. Sh. Pravesh Kumar,
Executive Engineer (Comml.),
Uttarakhand Power Corporation Ltd.,
Dehradun.
5. Sh. Munish Chandra,
Executive Engineer (Attached to MD),
Uttarakhand Power Corporation Ltd.,
Dehradun.
6. Ms. Sandhya Ojha,
Assistant Engineer (Comml.),
Uttarakhand Power Corporation Ltd.,
Dehradun. …Respondents
Date of order 07.06.2016
In the matter of: Application seeking amendment in UERC (Guidelines for Appointment of Members and Procedures to be followed by the Forum for Redressal of Grievances of the Consumers) Regulations, 2007 as amended from time to time.
AND In the matter of: Uttarakhand Power Corporation Ltd., (UPCL) Victoria Cross Vijeta Gabar Singh Bhawan, Kanwali Road, Dehradun. ......Petitioner
Date of order 17.05.2016
In the Matter of:Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence for investment for Increasing capacity of 220 kV Substation Chamba from 2x25 MVA (220/33 kV) to 1x50 MVA +1x25 MVA (220/33 kV).
In the Matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) ..…Petitioner
Date of order 06.05.2016
In the Matter of: Investment Approval for Implementation of Intra-State ABT Metering Scheme for On-Lining of ABT Meters to be installed at Interface Points for Energy Accounting & Transmission Level Energy Auditing at Power Transmission Corporation of Uttarakhand Ltd (PTCUL).
In the Matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) …Petitioner
Date of order 29.04.2016
In the matter of: Petitions filed under section 61 and 86 of the Electricity Act, 2003 read with the relevant regulations and guidelines of the Commission by UJVN Ltd. for approval of Capital investment for:
(1) Refurbishing of Asan Barrage
(2) Refurbishing of Dakpathar Barrage
(3) Refurbishing of Ichari Dam
(4) Special Repair Works of Civil & Hydro Mechanical Structures for Yamuna Hydel Scheme Stage-I, II Part-I & IV AND In the matter of: UJVN Ltd. Dehradun …....Petitioner AND
Uttarakhand Power Corporation Ltd. (UPCL) ….. Respondent No. 1
Himachal Pradesh State Electricity Board Ltd. (HPSEB Ltd.) Vidyut Bhawan, Kumar House, Shimla (H.P.) ….. Respondent No. 2
Date of order 31.03.2016
In the matter of:Petition to extend the benchmark capital cost and generic tariff as declared by on UERC vide order dated 23-07-2015, i.e. up to 30 Oct, 2016 for 23 Solar PV Power Plants (cumulative capacity of 181.40 MW).
In the matter of: Uttarakhand Renewable Energy Development Agency …Petitioner AND In the matter of: Uttarakhand Power Corporation Ltd. ...Respondent
Date of order 17.03.2016
In the Matter of: Application seeking clarification/elucidation of Order dated 07.01.2016 passed by the Commission directing UREDA to grant accreditation to M/s Him Urja Pvt. Ltd. on their application dated 22.06.2012.
AND In the matter of: Uttarakhand Power Corp. Ltd. (UPCL) ... Petitioner AND In the Matter of: Him Urja Pvt. Ltd. ... Respondent
Date of order 16.03.2016
In the Matter of: Review Petition filed under Regulation 54 of the UERC (Conduct of Business Regulations), 2014 for review of the Order dated 06.01.2016 passed by the Hon’ble UERC in the matter of application seeking removal of difficulty/clarification in the UERC (Release of new HT & EHT Connection Enhancement and Reduction of Loads) Regulations 2008.
In the Matter of: Uttarakhand Power Corporation Limited. (UPCL)
Date of order 26.02.2016
In the Matter of: Suo-moto proceedings initiated by the Commission for non-establishing the Complaint Handling Procedures in accordance with Clause 23.4 of the Distribution and Retail Supply Licence by the Distribution Licensee (UPCL).
AND In the matter of: Uttarakhand Power Corporation Limited. (UPCL)
Date of order 12.02.2016
In the matter of: Petition for approval of “Capital Investment for Renovation & Modernization” of 3x66 MW Ramganga HEP of UJVN Ltd.
AND In the matter of: UJVN Ltd. Dehradun ….... Petitioner
Date of order 12.02.2016
In the matter of: Petition for review of the Commission’s Order dated 30.07.2015 on “Petition for prior approval of Capital Investment for Renovation & Modernization of 3x30 MW MB-I HEP of UJVN Ltd”.
AND In the matter of: UJVN Ltd., Dehradun ......Petitioner AND
Uttarakhand Power Corporation Ltd. (UPCL) .....Respondent
Date of order 12.02.2016
In the matter of: Petition for investment approval of Construction of Colony at 132 kV Substation Majra Campus, Dehradun.
AND In the matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL), Vidyut Bhawan, Near ISBT Crossing, Majra, Dehradun.…. Petitioner.
Date of order 11.02.2016
In the matter of: Review filed by UJVN Ltd. on Commission’s Order dated 13.03.2015 issued in the matter of prior approval of “Capital Investment for Renovation & Modernization of 3x10 MW Kulhal HEP”.
AND In the matter of: UJVN Ltd., Dehradun ....Petitioner AND
Uttarakhand Power Corporation Ltd. (UPCL), Dehradun ....Respondent 1
Himachal Pradesh State Electricity Board Ltd. (HPSEB Ltd.) Vidyut Bhawan, Kumar House, Shimla (H.P.) ....Respondent 2
Date of order 11.02.2016
In the Matter of: Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence for:
1. Increasing capacity of 220 kV S/s Virbhadra Rishikesh from 2x160 MVA (220/132 kV) to 3x160 MVA (220/132kV).
2. Augmentation of 220 kV s/s Jhajhra from 2x40 MVA to 2x80 MVA.
3. Augmentation of Transformer capacity of 132 kV S/s Bhupatwala Haridwar from 2x40 MVA to 3x40 MVA and construction of 03 nos. 33kV bays at 132 kV S/s Bhupatwala Haridwar.
4. System strengthening of 132 kV S/s Kichha. In the Matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) …Petitioner
Date of order 11.02.2016
In the matter of: Petition for determination of levelised tariff for Rooftop and Small Solar PV Power Plant as per the revised subsidy.
In the matter of: Uttarakhand Renewable Energy Development Agency …Petitioner AND
Uttarakhand Power Corporation Ltd. ...Respondent
Date of order 08.02.2016
In the matter of: Application seeking approval of UERC on the Draft Power Purchase Agreement between UPCL & Gama Infraprop (P) Ltd.
In the matter of: Uttarakhand Power Corporation Ltd. …Petitioner AND
M/s Gama Infraprop (P) Ltd. ...Respondent No. 1
Power Transmission Corporation of Uttarakhand Ltd. ...Respondent No. 2
Date of order 29.01.2016
In the matter of: Prior approval of "Capital Investment for Renovation & Modernization of 4 x 36 MW Chilla HEP" of UJVN Ltd..
AND In the matter of: UJVN Ltd., "UJJWAL", Maharani Bagh, G.M.S. Road, Dehradun. .....Petitioner
Date of order 22.01.2016
In the matter of: Petition for Review of the UERC’s Order dated 11.04.2015 on “True-up of FY 2013-14,
Annual Performance Review for FY 2014-15 and Annual Fixed Charges for FY 2015-16 for UJVN Ltd”.
In the matter of: UJVN Ltd. Dehradun.…....Petitioner AND
1. Uttarakhand Power Corporation Ltd. (UPCL)
2. Himachal Pradesh State Electricity Board Ltd. (HPSEB Ltd.), Vidyut Bhawan, Kumar House, Shimla (H.P.)…....Respondents
Date of order 22.01.2016
In the matter of: Application seeking approval of Hon’ble Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and Selected bidders for setting of Grid Connected Solar PV Power Projects.
In the matter of: Uttarakhand Power Corporation Ltd. …Petitioner
AND In the matter of: Uttarakhand Renewable Energy Development Agency ...Respondent
Date of order 19.01.2016
In the matter of: Petition under Section 62 & Section 86(1)(a) of the Electricity Act, 2003, read with the UERC (Terms & Conditions for Determination of Tariff) Regulations, 2011 and UERC (Terms & Conditions for Determination of Multi Year Tariff) Regulations, 2015 for determination of tariff for FY 2015- 16 & for the control period from FY 2016-17 till FY 2018-19 for supply of power to UPCL from 214 MW Gas based Kashipur Combined Cycle Power Plant of Gama Infraprop Pvt. Ltd. At Mahukhedaganj, Kashipur, Dist. Udhamsingh Nagar.
In the matter of:M/s Gamma Infraprop (P) Ltd. … Petitioner AND
Uttarakhand Power Corporation Ltd. ... Respondent No. 1
Power Transmission Corporation of Uttarakhand Ltd. ... Respondent No. 2
Date of order 13.01.2016
In the matter of: Application seeking determination of tariff for FY 2015-16 till FY 2018-19 in respect of Chuzachen Hydroelectric Power located on the rivers Rangpo and Rangli in the East district of Sikkim.
In the matter of: M/s Gati Infrastructure Pvt. Ltd. … Petitioner AND In the matter of:
Uttarakhand Power Corporation Ltd. … Respondent
Date of order 12.01.2016
In the matter of: Petition seeking adjustment of tariff for Motighat Small Hydro Power Project (5 MW) unit of M/s Himalaya Hydro Pvt. Ltd. as per Section 61 and 62 of the Electricity Act, 2003 read with Regulation 15(9) of UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010, as amended from time to time.
In the matter of: Himalaya Hydro Power (P) Ltd. ... Petitioner AND In the matter of: Uttarakhand Power Corporation Ltd. … Respondent
Date of order 07.01.2016
In the matter of:Waiver and refund of penalty imposed by the Commission vide its Order dated 01.09.2005.
In the matter of:Uttarakhand Power Corporation Ltd …Petitioner
Date of order 07.01.2016
In the matter of: Petition filed by M/s Him Urja Pvt. Ltd. under UERC (Compliance of Renewable Purchase Obligation) Regulation, 2010 seeking accreditation and issuance of Renewable Energy Certificates for Rajwakti Generating Station.
In the matter of:M/s Him Urja Pvt. Ltd …Petitioner AND In the matter of:
1. Uttarakhand Electricity Regulatory Commission
2. Uttarakhand Renewable Energy Development Agency
3. Uttarakhand Power Corporation Ltd ... Respondents AND In the matter of:
Appeal No. 193 of 2014
Date of order 06.01.2016
In the matter of: Application seeking removal of difficulties/clarification in the UERC (Release of new HT & EHT Connections, Enhancement and Reduction of Loads) Regulations, 2008.
AND In the matter of:Uttarakhand Power Corporation Ltd. (UPCL) ...Petitioner
Date of order 06.01.2016
In the matter of: Application seeking approval of the Commission on the Power Purchase Agreement between UPCL and Generators.
AND In the matter of:Uttarakhand Power Corporation Ltd., Dehradun ...Petitioner
AND
1. M/s Parvatiya Power Pvt. Ltd.
2. M/s S.R. Solar Energy Park.
3. M/s Om Prakash Agarwal.
4. M/s S.K. Solar Power.
5. M/s Raj Kumar.
6. Shri Ubedur Rehaman-proprietor USA Solar Systems.
7. M/s Sourabh Arora.
8. M/s Ashok Aneja.
9. M/s Anil Kumar Gupta.
10. M/s UJVN Ltd.
11. M/s KLA Foods India Ltd.
12. M/s Puran Chand.
13. M/s Dovetail Woodcrafters Pvt. Ltd. ... Respondents
Date of order 06.01.2016
In the matter of: Order in the matter of Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers for the period from 01.10.2015 to 31.12.2015.
AND In the matter of: Uttarakhand Power Corporation Ltd., Dehradun ...Petitioner
Miscellaneous Orders-Year-2015
Date of order 18.11.2015
In the matter of: Petition for seeking approval for implementation of Domestic Efficient Lighting Program (DELP) for LED bulbs in the state of Uttarakhand under 24 X 7 Power for All.
AND In the matter of: Uttarakhand Power Corporation Ltd., Dehradun ...Petitioner
Date of order 06.11.2015
In the matter of: Application seeking approval of the Commission on the Draft Power Purchase Agreement between UPCL & M/s GMR Chhattisgarh Energy Ltd. In the matter of: Uttarakhand Power Corporation Ltd. … Petitioner AND In the matter of: M/s GMR Chhattisgarh Energy Ltd. … Respondent
Date of order 21.10.2015
In the matter of:Petition filed for adjudication and appropriate direction under Section 86 (1) (f), 94(2) of the Electricity Act, 2003 read with Regulation 20 & 21 of the UERC (Conduct of Business) Regulations, 2014 for adjudication of disputes with licensees and issuance of necessary directions to them.
AND
In the matter of: M/s Swasti Power Limited …Petitioner 111, Road No. 72, Jubilee Hills, Hyderabad
AND
In the matter of:Uttarakhand Power Corporation Limited (UPCL) … Respondent 1
Power Transmission Corporation of Uttarakhand Limited (PTCUL) …Respondent 2
Date of order 21.10.2015
In the matter of: Revision filed under Rule 3 Sub-Rule (3) of The Work of Licensee Rules, 2006 on the Order dated 02.05.2015 issued by the District Magistrate, Udhamsingh Nagar (Uttarakhand), under Rule 3 Sub-Rule 2 of The Work of Licensee Rules, 2006 on the representation of Mr. Suresh Kumar Mittal.
In the matter of:
1. Uttarakhand Power Corporation Ltd., Urja Bhawan, Kanwali Road, Dehradun, Uttarakhand, through its Director (Projects).
2. Executive Engineer (UPCL), EDD, Sitarganj, District-Udhamsingh Nagar, Uttarakhand.….. Revisionists/Petitioners AND
1. District Magistrate/Collector, District-Udhamsingh Nagar, Uttarakhand
2. Suresh Kumar Mittal S/o Late Sh. Mangatram, R/o Ward No. 4, Khatima, Tehsil Khatima, District Udhamsingh Nagar. …….. Respondents
Date of order 14.10.2015
In the matter of: Application seeking approval of the Commission on the PPAs between UPCL and 12 nos. Generators.
In the matter of:Uttarakhand Power Corporation Ltd. … Petitioner AND
1. M/s R.C. Energy
2. M/s Purshotam Industries Ltd.
3. M/s Purshotam Ispat
4. M/s Vivan Solar Pvt. Ltd.
5. M/s Uttar Bharat Hydro Pvt. Ltd.
6. M/s Root Hydrocarbons Ltd.
7. M/s Madhav Infra Projects Ltd.
8. UJVN Ltd.
9. M/s Eastman International.
10. M/s Advika Energies Pvt. Ltd.
11. M/s Redwoods Infrastructure Pvt. Ltd.
12. UJVN Ltd. ... Respondents.
Date of order 09.10.2015
In the matter of:Petition seeking the approval of the Commission for advance banking of power by the UPCL from Haryana Power Purchase Centre/Northern Region Utility, through a trader. In the matter of:Uttarakhand Power Corporation Ltd. … Petitioner
Date of order 09.10.2015
In the Matter of: Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence for investment for:
(i) Strengthening of 132 kV network comprising the works of (a) Extension of 220 kV Sub-station (S/s) Piran Kaliyar (b) Construction of 132 kV LILO of Bhagwanpur-Chudiyala at Piran Kaliyar.
(ii) Construction of 220 kV Piran Kaliyar-Puhana (PGCIL) line. ANDIn the Matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL), Vidyut Bhawan, Near ISBT Crossing, Saharanpur Road, Majra, Dehradun. …Petitioner
Date of order 22.09.2015
In the matter of:Petition under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of the disputes between M/s Swasti Power Ltd. and Uttarakhand Power Corp. Ltd. arising out of the Power Purchase Agreement dated 03.07.2009. In the matter of: M/s Swasti Power Ltd. …Petitioner AND In the matter of: Uttarakhand Power Corporation Ltd. …Respondent
Date of order 21.09.2015
In the matter of: Application seeking approval of the Fuel Charge Adjustment (FCA) for the quarter ending June, 2015 and to adjust the same in the FCA computation for the quarter ending September, 2015. In the matter of: Uttarakhand Power Corporation Ltd. … Petitioner
Date of order 11.09.2015
In the matter of: Grid connectivity for 12.6 MW SHP of M/s Uttar Bharat Hydro Power Pvt. Ltd.
(UBHP), A-2/452, Sector-8, Rohini, New Delhi (suo-moto).
AND In the matter of: Uttarakhand Power Corporation Limited (UPCL) ...Respondent 1
M/s Uttar Bharat Hydro Power Pvt. Ltd. ...Respondent 2
Date of order 09.09.2015
In the matter of:Application seeking approval of the Commission on the Draft Power Purchase Agreement between UPCL & Grid Interactive Rooftop & Small Solar PV Plant under Third Party Model. In the matter of: Uttarakhand Power Corporation Ltd. … Petitioner AND In the matter of: Uttarakhand Renewable Energy Development Agency …. Respondent
Date of order 18.08.2015
In the matter of: Petition filed under Section 86(1) (k) of Electricity Act read with UERC(Terms and Conditions of Intra-State Open Access)Regulations, 2015 AND In the matter of: Indian Energy Regulatory Services, ....Petitioner
T-44, Karampura, New Delhi AND In the matter of:
Uttarakhand Power Corporation Limited (UPCL) ....Respondent 1
Victoria Cross Vijeta Gabar Singh Bhawan, Kanwali Road, Balliwala Chowk, Dehradun
State Load Despatch Centre (SLDC) ....Respondent 2
Vidyut Bhawan, Near ISBT Crossing, Saharapur Road, Majra, Dehradun
Date of order 07.08.2015
In the matter of: Filing of Petition for allowing presentation and acceptance of the Petition for Review of the UERC’s “Order on True-up of FY 2013-14, Annual Performance Review for FY 2014-15 and Annual Fixed Charges for FY 2015-16” dated 11.04.2015, returned by Receiving Officer, UERC. In the matter of:
UJVN Ltd., Dehradun ...Petitioner
Date of order 04.08.2015
In the matter of: Petition to increase the Solar Renewable Purchase Obligation (SRPO) as stipulated by Uttarakhand Electricity Regulatory Commission. In the matter of: Uttarakhand Renewable Energy Development Agency … Petitioner AND
Uttarakhand Power Corporation Ltd. ... Respondent
Date of order 30.07.2015
In the matter of:
Application seeking approval of UERC on the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. & M/s Sravanthi Energy Pvt. Ltd. In the matter of: Uttarakhand Power Corporation Ltd. … Applicant AND In the matter of:M/s Sravanthi Energy Pvt. Ltd. ... Respondent
Date of order 30.07.2015
In the matter of:Petition for prior approval of “Capital Investment for Renovation & Modernization” of MB-I (3x30 MW) HEP of UJVN Ltd. AND In the matter of:UJVN Ltd., Dehradun ...Petitioner
Date of order 23.07.2015
In the matter of:Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Plants to be applicable for FY 2015-16 and onwards till reviewed/revised by the Commission.
Date of order 23.07.2015
In the matter of:
Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence for:
(a) Investment Approval for increasing capacity of 220 kV S/s SIDCUL, Haridwar
from 2x80 MVA (132/33 kV) to 2x80 MVA (132/33 kV)+1x50 MVA (220/33 kV).
(b) Investment Approval for Construction of 132 kV overhead line from 220 kV S/s SIDCUL, Haridwar to 132 kV S/s Jwalapur and construction of 132 kV bays at
both ends.
(c) Investment Approval for construction of 132 kV S/s Chudiyala and LILO line.
(d) Investment Approval for increasing capacity of 132/33 kV S/s Jwalapur from
2x40 MVA to 3x40 MVA. AND In the matter of: Power Transmission Corporation of Uttarakhand Limited. (PTCUL), Vidyut Bhawan, Near ISBT Crossing, Saharanpur Road, Majra, Dehradun. …Petitioner
Date of order 03.07.2015
In the matter of: Petition seeking approval of the Commission on return of banked power by UPCL to Haryana Power Purchase Centre through a trader. In the matter of:Uttarakhand Power Corporation Ltd., Victoria Cross Vijeyta Gabar Singh Bhawan, Kanwali Road, Dehradun. . … Petitioner
Date of order 29.05.2015
In the matter of: Petition seeking determination of project specific tariff for 10.5 MW Small Hydro Power Project under Section 62 and 86 of the Electricity Act, 2003 read with Regulation 13 of Uttaranchal Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Non-conventional and Renewable Energy Sources) Regulations, 2013. In the matter of:Uttar Bharat Hydro Power (P) Ltd ... Petitioner AND In the matter of: Uttarakhand Power Corporation Ltd. …Respondent
Date of order 28.05.2015
In the matter of: Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers during the period from 01.04.2015 to 30.06.2015. AND In the matter of:Uttarakhand Power Corporation Ltd. … Petitioner
Date of order 07.05.2015
In the matter of:Petition for approval of “Capital Investment for Renovation & Modernization” of
Khatima (3x13.8 MW) HEP of UJVN Ltd. AND In the matter of:UJVN Limited Dehradun ...Petitioner
Date of order 28.04.2015
In the matter of:Approval of Capital Investments under Para 11 of the Transmission Licence [Licence No. 1 of 2003].
In the matter of:Power Transmission Corporation of Uttarakhand Limited. (PTCUL), Vidyut Bhawan, Near ISBT Crossing, Saharanpur Road, Majra, Dehradun. …Petitioner AND In the matter of:Misc App. No. 07 of 2015 and Misc Application No. 10 to 13 of 2015 filed by Power Transmission Corporation of Uttarakhand Limited (PTCUL).
Date of order 27.04.2015
In the matter of: Dispute between UJVN Ltd. and Uttarakhand Power Corporation Limited (UPCL)
relating to payments. AND In the matter of:Managing Director, UJVN Ltd., ....Petitioner
“UJJWAL”, Maharani Bagh, G.M.S. Road, Dehradun AND
Managing Director, Uttarakhand Power Corporation Limited (UPCL) .... Respondent
Victoria Cross Vijeta Gabar Singh Bhawan, Kanwali Road, Dehradun
Date of order 20.03.2015
In the matter of:Application seeking approval of the Commission on the draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and selected bidders for setting of Grid Connected Solar PV Power Projects.
In the matter of: Uttarakhand Power Corporation Ltd. …Petitioner
AND
Uttarakhand Renewable Energy Development Agency ...Respondent
Date of order 13.03.2015
In the matter of: Petition for prior approval of “Capital Investment for Renovation & Modernization” of
Kulhal (3x10 MW) HEP of UJVN Ltd. AND In the matter of: UJVN Ltd., Dehradun ….Petitioner
Date of order 04.03.2015
In the matter of:Indemnification of the Petitioner for the loss caused due to delay in commissioning of Transmission/evacuation system and the breach of the provisions of the Transmission Services Agreement by PTCUL. AND In the matter of: M/s Bhilangana Hydro Power Limited. …Petitioner
Date of order 03.03.2015
In the matter of: Revision against the Order dated 27.09.2014 issued by the District Magistrate Udhamsingh Nagar (Uttarakhand), under Rule 3 Sub-Rule 2 of The Work of Licensee Rules, 2006 on the representation of Mr. Suresh Kumar Mittal. AND In the matter of:
1. Uttarakhand Power Corporation Ltd., Urja Bhawan, Kanwali Road, Dehradun, Uttarakhand, through its Managing Director.
2. Executive Engineer (UPCL), EDD, Sitarganj, District-Udhamsingh Nagar, Uttarakhand
….....…….. Revisionist AND
1. District Magistrate/Collector, District-Udhamsingh Nagar, Uttarakhand
2. Suresh Kumar Mittal S/o Late Sh. Mangatram, R/o Ward No. 4, Khatima, Tehsil Khatima, District Udhamsingh Nagar. ……….. Respondents
Date of order 03.03.2015
In the matter of:Petition seeking approval for the investment on the project covering the construction of
14 Nos., 33/11 kV sub-station and their associated lines of 113.70 Km. AND In the matter of: Managing Director, Uttarakhand Power Corporation Limited (UPCL) .... Petitioner
Date of order 27.02.2015
In the matter of:Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from the consumers during the period from 01.01.2015 to 31.03.2015. In the matter of: Uttarakhand Power Corporation Ltd. … Petitioner
Date of order 25.02.2015
In the matter of: Petition under Regulation 40(1) read with Regulation 59 & 62 of Conduct of Business
Regulation, 2014 for seeking post-facto approval regarding Investment on the project
for implementing Integrated Automatic Meter Reading System on 11000 Nos.
Consumers (Industrial Category having load 5 KW and above and Commercial
category having load 10 KW and above) to be executed on turnkey basis. AND In the matter of: Uttarakhand Power Corporation Ltd. (UPCL) …Petitioner
Date of order 23.02.2015
In the matter of: Approval of Capital Investment under Para 11 of the Transmission Licence [Licence No. 1 of 2003]. In the matter of:Power Transmission Corporation of Uttarakhand Limited (PTCUL) …Applicant AND In the matter of:Investment Approval (Change in scope) for Construction of (2x50 MVA) 220/33 kV substation at Piran Kaliyar.
Date of order 10.02.2015
In the matter of: Petitions seeking approval of the Power Purchase Agreements executed by Uttarakhand Power Corporation Ltd with 3 nos. small hydro generators. In the matter of:Uttarakhand Power Corporation Ltd. …Petitioner AND
M/s Regency Yamuna Energy Ltd.
M/s Regency Aquaelectro & Motelresorts Ltd.
M/s Himalaya Hydro Pvt. Ltd ...Respondents
Date of order 02.02.2015
In the matter of: Petition seeking approval for the investment on the SCADA /DMS Project of Dehradun town covered under Part-‘A’ of Restructured-Accelerated Power Development & Reform Program of Ministry of Power, Govt. of India. AND In the matter of: Petition seeking approval for the investment on the Dehradun Project covering the works covered under Part-‘B’ of Restructured-Accelerated Power Development & Reform Program of Ministry of Power, Govt. of India for Reduction of AT&C losses to the extent of 15%. AND In the matter of: Managing Director, Uttarakhand Power Corporation Limited (UPCL) Victoria Cross Vijeta Gabar Singh Bhawan, Kanwali Road, Dehradun .... Petitioner
Date of order 30.01.2015
In the matter of: Approval of Capital Investment under Para 11 of the Transmission Licence [Licence No. 1 of 2003]. In the matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) …Applicant AND In the matter of: Investment Approval (Change in scope) for Construction of 2x20 MVA 132 kV GIS substation at Lohaghat
Date of order 22.01.2015
In the matter of: Approval of Capital Investment under Para 11 of the Transmission Licence [Licence No. 1 of 2003].
In the matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) …Applicant AND In the matter of: Investment Approval for construction of well foundations and tower protection work at different locations of 220 kV double circuit twin Zebra transmission line from 220 kV sub-station Dehradun (PTCUL) to 400 kV sub-station Sherpur, Dehradun of PGCIL.
Date of order 21.01.2015
In the matter of: Proceeding initiated in the Commission’s Order dated 08.07.2014 under section 142 of the Electricity Act, 2003 for non-compliance of the provisions of the section 67 & 68 of the Electricity Act, 2003 in the matter of M/s Birla Tyres, Unit II, Khedimubarakpur, Laksar Haridwar. AND In the matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) .... Respondent
Date of order 09.01.2015
In the matter of: Processing of Tender for purchase of Renewable Energy Power for the period from December 2014 to March 2015. In the matter of: Uttarakhand Power Corporation Limited (UPCL) …Applicant
Miscellaneous Orders-Year-2014
Date of order 26.12.2014
In the matter of: Approval of Capital Investment under Para 11 of the Transmission Licence [Licence No. 1 of 2003].
In the matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) …Applicant AND In the matter of: Investment Approval (Change in scope) for Construction of 132 KV GIS substation Bageshwar with 6x5 MVA 132/33 KV Transformer Capacity (Revised DPR under REC-II Scheme).
Date of order 22.12.2014
In the matter of: Petition to waive the token Penalty of Rs. 10000 imposed on MD, UPCL under section 142 of the Electricity Act, 2003 vide Order dated 09.09.2014 in the matter of non-compliance of the Commission’s Order dated 26.04.2014 on the review petition filed by UPCL on Commission’s Order dated 05.05.2014 on the application seeking of releasing additional 6 MVA load of 33 kV to M/s Birla Tyres, Unit-II, Khedimubarak, Lakshar, Haridwar. AND In the matter of: Director (Project), Uttarakhand Power Corp. Ltd. ....Petitioner
Date of order 19.12.2014
In the matter of: Application seeking approval of the Commission for the investment on the project covering the works covered under Part-‘B’ of Restructured-Accelerated Power Development & Reform Program of Ministry of Power, Government of India for reduction of AT&C losses to the extent of 15%. AND In the matter of: Managing Director, Uttarakhand Power Corporation Limited (UPCL) .... Petitioner
Victoria Cross Vijeta Gabar Singh Bhawan, Kanwali Road, Dehradun
Date of order 28.11.2014
In the matter of: Suo-moto proceedings initiated by the Commission for non-issuance of NOC by UPCL for Open Access.
AND In the matter of:Petition filed by M/s Kashi Vishwanath Steel Ltd, Narain Nagar Industrial Estate, Kashipur with regard to removal of difficulty under Regulation 58 of UERC (Terms and Condition of Intra-State Open Access) Regulations, 2010...................Petitioner AND Uttarakhand Power Corporation Ltd. (UPCL)..............Respondent
Date of order 17.11.2014
In the matter of:Application under Section 42(2) of the Electricity Act, 2003 read with Regulation 58 of the UERC (Terms and Conditions of Intra-State Open Access) Regulations, 2010 for clarification on the aspect of payment for under-drawal. AND In the matter of:Shree Cement Ltd. Bangur Nagar, Post Box No. 33, Beawar-305901 (Raj) ...Petitioner AND
Managing Director, Uttarakhand Power Corporation Limited (UPCL), Victoria Cross Vijeta Gabar Singh Bhawan, Kanwali Road, Dehradun. …Respondent
Date of order 17.11.2014
In the matter of: Withdrawal of Show-Cause notices dated March 12, 2013 in pursuance to Judgment dated October 01, 2014 of the Hon’ble Appellate Tribunal for Electricity in Appeal Nos. 112, 130 & 136 of 2014. In the matter of:
1. M/s Birla Tyres Kesoram Industries.
2. M/s Gujarat Ambuja Exports Ltd.
3. M/s Sidharth Papers Ltd. (Unit-2)
4. M/s Siddheshwari Paper Udyog Ltd.
5. M/s Century Pulp and Paper Mill
6. M/s Shree Shyam Pulp and Board Mill
7. M/s India Glycols Ltd.
8. M/s BAHL Paper Mills Ltd.
9. M/s Hanung Toys & Textiles Ltd. …Respondents
Date of order 07.11.2014
In the matter of: Petition seeking amendment in the PPA dated 30.11.2010 executed between M/s Birahi Ganga Hydro Power Ltd. and UPCL in accordance with the provisions of UERC (Tariff and other Terms for Supply of Electricity from Non-Conventional and Renewable Energy sources) Regulations, 2010, Removal of difficulty (First) Order 2010 and CERC (Terms and Conditions of Tariff) Regulations, 2014. In the matter of: M/s Birahi Ganga Hydro Power Ltd. …Petitioner AND Uttarakhand Power Corporation Ltd. ...Respondent ANDPetition No. 21 of 2014 In the matter of:Application seeking approval of the 11 Power Purchase Agreements entered into between UPCL & 11 nos. RE generators. In the matter of:Uttarakhand Power Corporation Ltd. ... …Petitioner AND
1. M/s Metro Frozen Fruits & Vegetables Pvt. Ltd
2. M/s Birahi Ganga Hydro Power Ltd.
3. M/s Gunsola Hydro Power Generation (Pvt.) Ltd.
4. M/s Chamoli Hydro Power Pvt. Ltd.
5. M/s Swasti Power Ltd.
6. M/s Rai Bhadur Narain Singh Sugar Mills Ltd.
7. M/s Rishiganga Power Corporation Ltd.
8. M/s RV Akash Ganga Infrastructure Ltd.
9. M/s Uttam Sugar Mills Ltd.
10. M/s Lakshmi Sugar Mills Co. Ltd.
11. M/s Jay Ace Technologies Ltd. ... Respondents.
Date of order 07.11.2014
In the matter of: Application seeking review of the Tariff Order dated 10.04.2014 on the Annual Performance Review and Tariff petition of UPCL for FY 2014-2015. AND In the matter of: Uttarakhand Power Corporation Ltd. ….Petitioner
Date of order 07.11.2014
In the matter of: Petition seeking clarification on various issues for implementation of "Uttarakhand Grid Interactive Rooftop and Small SPV Power Plants Scheme". In the matter of: Uttarakhand Renewable Energy Development Agency …Petitioner AND In the matter of: Uttarakhand Power Corporation Ltd. ...Respondent
Date of order 07.10.2014
In the matter of: Application seeking approval of Hon’ble UERC for the investment on the projects covering the construction of 22 No. 33/11 kV Substation, 6 No. Feeders for 132/33 kV Substation Simli and their associated lines of 319 Km. AND In the matter of: MD, Uttarakhand Power Corporation Limited (UPCL) .... Petitioner
Date of order 12.09.2014
In the matter of: Petition seeking carry forward of Renewable Purchase Obligation for FY 2012-13 and FY 2013-14 as per the provisions of UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010. In the matter of: Uttarakhand Power Corporation Ltd. … Petitioner
Date of order 12.09.2014
In the matter of: Petition seeking interference of UERC on the wrongful & impugned decision by Uttarakhand Power Corporation Ltd. (UPCL) regarding cost sharing of Rajstar/Gangani Sub Station as per MoU signed by UPCL & Regency Gangani Energy Pvt. Ltd. on 23rd July, 2009. In the matter of: M/s Regency Gangani Energy Pvt. Ltd. … Petitioner AND In the matter of: Uttarakhand Power Corporation Ltd. ... Respondent
Date of order 11.09.2014
In the matter of: Petition seeking post facto approval of the Fuel Charge Adjustment (FCA) charged from the consumers for the period from 01.07.2014 to 30.09.2014. AND In the matter of: Uttarakhand Power Corporation Ltd. … Petitioner
Date of order 09.09.2014
In the matter of:Petition filed by Uttarakhand Power Corporation Limited seeking review of the Order dated April 10, 2014 passed by the Commission determining the tariff of Vanala SHP having capacity of 15 MW.
In the matter of:Uttarakhand Power Corporation Ltd. …Petitioner AND In the matter of:M/s. Him Urja Pvt. Ltd. …Respondent
Date of order 09.09.2014
In the matter of:Petition seeking approval of the Commission for the investment on the project covering construction of 44.1 Km., 33 kV line to connect 7 Nos. 33/11 kV Substation to 220/33 kV Substation Jhajhara. AND In the matter of: Uttarakhand Power Corporation Limited (UPCL) .... Petitioner
Date of order 09.09.2014
In the matter of: Notice issued to MD, UPCL under Section 142 of the Electricity Act, 2003 in the matter of non-compliance of the Commission’s Order dated 24.06.2014 on the Review Petition filed by UPCL on Commission’s Order dated 05.05.2014 on the application seeking approval of releasing additional 6 MVA load (Total of 20 MVA) on supply voltage of 33 kV to M/s Birla Tyres, Unit-II, Khedimubarakpur, Laksar, Haridwar. AND In the matter of:Managing Director, Uttarakhand Power Corporation Limited (UPCL) .... Respondent
Date of order 21.08.2014
In the matter of:Notice issued to MD, UPCL under Section 43(3) of the Electricity Act, 2003 for violation of the provisions of Section 43(1) of the Electricity Act, 2003 in pursuance to the Commission’s Order dated 08.07.2014 on the review Petition filed by UPCL on Commission’s Order dated 05.05.2014 on the Application seeking approval of releasing additional 6 MVA load (Total of 20 MVA) on Supply Voltage of 33 kV to M/s Birla Tyres , Unit-2, Hardwar. AND In the matter of:MD, Uttarakhand Power Corporation Ltd. …Respondent
Date of order 11.07.2014
In the matter of:Petition seeking waiver of per day Penalty imposed by the Commission vide order dated January 22, 2014 for non-compliance of directions issued vide Order dated September 11, 2013. AND
In the matter of: Managing Director, Uttarakhand Power Corporation Limited (UPCL) ... Petitioner
Date of order 08.07.2014
In the matter of: Review Petition filed by UPCL on Commission’s Order dated 05.05.2014 on the Application seeking approval of releasing additional 6 MVA load (Total of 20 MVA) on Supply Voltage of 33 kV to M/s Birla Tyres, Unit-2, Hardwar. AND In the matter of:Uttarakhand Power Corporation Limited (UPCL) ....Petitioner & 1. M/s Birla Tyres, Unit-II, Khedi Mubarakpur, Laksar, Haridwar .... Respondent 1
2. Power Transmission Corporation of Uttarakhand Limited (PTCUL) .... Respondent 2
Date of order 20.06.2014
In the matter of: Application seeking recovery of claim in respect of Deemed Generation under Section 44 (A) of the UERC (Tariff and Other Terms for Supply of Electricity from Non-conventional and Renewable Energy Sources) Regulations, 2012 and as amended by UERC’s Tariff Regulations of 2013. AND In the matter of: M/s Himalaya Hydro Pvt. Ltd. … Petitioner AND
Uttarakhand Power Corporation Ltd. ... Respondent No. 1
Power Transmission Corporation of Uttarakhand Ltd. ... Respondent No. 2
Date of order 20.06.2014
In the matter of:Application seeking approval for the Investment on the project covering (i) releasing of 2,500 electricity connections for Private Tube-wells (ii) installation of double metering (iii) shifting of 3 phase meters outside the premises of the consumers (iv) installation of compact sub-station and (v) replacement of mechanical meters with electronic meters. AND In the matter of: MD, Uttarakhand Power Corporation Limited (UPCL) .... Petitioner
Date of order 10.06.2014
In the matter of: Review Petition on the Order dated 16.01.2014 issued by Hon’ble UERC in the matter of Non-compliance of UERC (Release of New HT & EHT Connections, Enhancement and Reduction of Loads) Regulations, 2008 and in the matter of M/s Gold Plus Glass Industry Ltd. Thithola (Roorkee) and Uttarakhand Power Corporation Ltd. AND In the matter of: Power Transmission Corporation of Uttarakhand Limited (PTCUL) .... Petitioner
1. M/s Gold Plus Glass Industry Ltd. Thithola (Roorkee) .... Respondent 1
2. Uttarakhand Power Corporation Limited (UPCL) .... Respondent 2
Date of order 28.05.2014
In the matter of: Petition filed by M/s Him Urja Pvt Ltd. under UERC (Compliance of Renewable Purchase Obligation) Regulation, 2010 seeking accreditation and issuance of Renewable Energy Certificates for Rajwakti Generating Station.
Date of order 26.05.2014
In the matter of:Sh. S. K Tamta, Chief Engineer (Commercial), UPCL.
Date of order 16.05.2014
In the matter of: Application for seeking review/reconsideration on the Commission’s Order dated
28.02.2014 issued in the matter of approval of Investment in the project for implementing
Integrated Automatic Meter Reading System on 11000 nos. consumers.
AND In the matter of:
MD, Uttarakhand Power Corporation Limited (UPCL), ....Petitioner
Victoria Cross Vijeta Gabar Singh Bhawan, Kanwali Road, Dehradun
Date of order 05.05.2014
In the matter of:Petition seeking approval of the Draft Power Purchase Agreement between Uttarakhand Power Corporation Ltd. and M/s Super Hydro Electric Pvt. Ltd. AND In the matter of:
Uttarakhand Power Corporation Ltd. Petitioner
AND In the matter of:M/s Super Hydro Electric Pvt. Ltd. Respondent No. 1
Power Transmission Corporation Uttarakhand Ltd. Respondent No. 2
Date of order 23.04.2014
In the matter of:Petition under provision of the Regulation 68 read with Regulation 74 of UERC (Conduct of Business) Regulations, 2004 to reconsider/review the order dated 22.01.2014 passed by UERC in the matter of Suo-moto proceedings initiated by the Commission for non-compliance by UPCL of UERC (Tariff and Other Terms for Supply of Electricity from non-conventional and Renewable Energy Sources) Regulations, 2010 and UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010 and non-compliance of directions issued vide the Commission’s Order dated 11.09.2013. AND In the matter of: Uttarakhand Power Corporation Limited (UPCL) ...Petitioner AND In the matter of: Uttarakhand Renewable Energy Development Agency ...Respondent
Date of order 10.04.2014
In the matter of:Application in pursuance to Show-Cause notice no. UERC/6/TF-142/12-13/2013/1720 dated March 12, 2013. AND In the matter of:Declaring the Petitioner Company being captive user as Cogeneration outside the purview of the "Obligated Entity" as defined under UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010. AND In the matter of:M/s Birla Tyres Kesoram Industries ....Petitioner AND In the matter of:
1. M/s Gujarat Ambuja Exports Ltd.
2. M/s Sidharth Papers Ltd. (Unit-2)
3. M/s Siddheshwari Paper Udyog Ltd.
4. M/s Century Pulp and Paper Mill
5. M/s Shree Shyam Pulp and Board Mill
6. M/s India Glycols Ltd.
7. M/s BAHL Paper Mills Ltd.
8. M/s Hanung Toys & Textiles Ltd. …Petitioners AND In the matter of:Uttarakhand Renewable Energy Development Agency ...Respondent
Date of order 10.04.2014
In the matter of:Petition filed by M/s Him Urja (P) Ltd. seeking determination of tariff of Vanala SHP of 15 MW Capacity. AND In the matter of:Him Urja Pvt. Ltd. …Petitioner AND In the matter of:Mtarakhand Power Corporation Ltd. …Respondent
Date of order 10.04.2014
In the matter of:Application filed by M/s Rai Bahadur Narain Singh Sugar Mills Ltd., Haridwar in the matter of misc petition under UERC (Tariff & Other Terms for Supply of Electricity from Renewable Energy Sources and Non-fossil fuel based Co-generating Stations) Regulation, 2010 repealed by UERC (Tariff & Other Terms for Supply of Electricity from Renewable Energy Sources and Non-fossil fuel based Co-generating Stations Regulation, 2013 for relief/relaxation against normative Energy Charge Non-fossil fuel based Cogeneration of Power (Bagasse Based) plant. AND In the matter of:in the matter of Urgency application for hearing of above referred misc Petition filed by M/s Rai Bahadur Narain Singh Sugar Mills Ltd., Haridwar AND In the matter of:M/s Rai Bahadur Narain Singh Sugar Mills Ltd. … Applicant AND
Uttarakhand Power Corporation Ltd. ... Respondent
Date of order 03.04.2014
In the matter of:Application seeking approval of the Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation and M/s Regency Gangani Energy Pvt. Ltd. AND In the matter of:Uttarakhand Power Corporation Ltd. … Petitioner AND In the matter of:M/s Regency Gangani Energy Pvt. Ltd. ... Respondent
Date of order 27.03.2014
AND
Petition under Section 86(1)(f) of the Electricity Act,2003, for adjudication of dispute between M/s PTC India Ltd., Swasti Power Engineering Ltd., Uttarakhand Power Corporation Ltd. and Punjab State Power Corporation Ltd.
AND In the matter of:PTC India Ltd. …Petitioner
AND In the matter of:M/s Swasti Power Engineering Ltd. ...Respondent No. 1
Uttarakhand Power Corporation Ltd. ...Respondent No. 2
Punjab State Power Corporation Ltd. ...Respondent No. 3
Date of order 27.03.2014
In the matter of:Application seeking approval of the Uttarakhand Electricity Regulatory Commission on the Draft Power Purchase Agreement between Uttarakhand Power Corporation and M/s Super Hydro Electric Pvt. Ltd. AND In the matter of:Uttarakhand Power Corporation Ltd. … Petitioner AND In the matter of:M/s Super Hydro Electric Pvt. Ltd. ... Respondent No. 1
Power Transmission Corporation Uttarakhand Ltd. ... Respondent No. 2
Date of order 27.03.2014
In the matter of:Dispute between M/s Bhilangana Hydro Power Limited and Power Transmission Corporation of Uttarakhand Limited regarding illegal and incorrect bills for monthly transmission charges and invocation of letter of credit. AND In the matter of:M/s Bhilangana Hydro Power Limited. …Petitioner AND In the matter of:Power Transmission Corporation of Uttarakhand Ltd. ...Respondent No. 1
State Load Dispatch Centre. ...Respondent No. 2
Date of order 27.03.2014
Application filed by M/s Swasti Power Engineering Ltd. for condonation of delay in filing of the Petition for determination of Project Specific Tariff in respect of Bhilangana 22.5 MW HEP in accordance with UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010.
AND In the matter of:M/s Swasti Power Engineering Ltd. … Applicant AND
Uttarakhand Power Corporation Ltd. ... Respondent
Date of order 26.03.2014
In the matter of:
1) Notice under section 142 read with section 146 of the Electricity Act, 2003 and in
the matter of Non-compliance of Commission’s Directions issued vide Order
dated 01.02.2013.
2) Notice under section 142 of the Electricity Act, 2003 in the matter of violation of
Regulation 5(13) of UERC (Release of New LT Connections, Enhancement and
Reduction of Loads) Regulations, 2007.
3) Investigation of LT New Connection report of EDD-Kashipur and EDDRudrapur
for FY 2011-12 through an independent agency. AND
1. Sh. S.S. Yadav, MD, UPCL .…Respondent 1
2. Sh. Pradeep Kumar, EE(D), EDD-Rudrapur .…Respondent 2
3. Sh. Shishir Srivastava, the then EE(D), EDD-Kashipur .…Respondent 3
Date of order 19.03.2014
In the matter of: Application seeking relaxation of the provisions of the UERC (Tariff and Other Terms for Supply of Electricity from Non-conventional and Renewable Energy Sources) Regulations, 2010 and UERC (Tariff and Other Terms for Supply of Electricity from Non-conventional and Renewable Energy Sources) Regulations, 2013 in accordance with Section 61, 62 and 86(1)(e) of the Electricity Act, 2003 and Regulation 49& 50 of UERC (Tariff and Other Terms for Supply of Electricity from Non-conventional and Renewable Energy Sources) Regulations, 2013. AND In the matter of:
M/s Birahi Ganga Hydro Power Ltd.
M/s Himalaya Hydro Pvt. Ltd.
M/s Rishiganga Power Corp. Ltd. … Petitioners AND
Uttarakhand Power Corporation Ltd. ... Respondent
Date of order 13.03.2014
In the matter of: Non-Compliance by Obligated Entities under UERC (Tariff and Other Terms for Supply of Electricity from non-conventional and Renewable Energy Sources) Regulations, 2010 and UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010. AND In the matter of:
M/s Tata Motors Pvt Ltd., M/s Purti Textiles, M/s Mahalxmi Polypack Ltd., M/s Air Liquide India Ltd., M/s Rana Bar Ltd., M/s Rana Industries Ltd., M/s Bhavani Industries Ltd., M/s Amul Auto Components Pvt Ltd., Haridwar, M/s Mahabal Auto Pvt. Ltd., M/s Amul Auto Components Pvt Ltd., Unit-II, Pantnagar, M/s U.P. Bone Mills Pvt. Ltd., M/s Amul Auto Components Pvt. Ltd., Unit-II, Haridwar, M/s Sundram Fasteners Ltd., M/s Shriram Foundary Ltd., M/s Mantri Metallic Pvt. Ltd., M/s Shri Grinding Cement Ltd., M/s Ganesha Echosphere Ltd., M/s Ambuja Cement, M/s India Glycols Ltd., M/s Rockman Industries Ltd., M/s Asahi India Glass Ltd., M/s Hindustan National Glass and Industries Ltd., M/s Jaypee Roorkee Cement, M/s DVS Industries Ltd., M/s Rojee Tasha Stamping Ltd., M/s Bajaj Motors Ltd., M/s Anusuya Auto Press Parts Pvt. Ltd., M/s Autocomp Corporation Panes Pvt. Ltd., M/s Shivani Locks Pvt. Ltd., M/s Dali & Samir Engineering Pvt. Ltd., M/s Everest Industries Ltd., M/s Amul Auto Components Pvt Ltd., Pantnagar, M/s Pashupati Polytex Ltd., M/s Pashupati Laminators Ltd., M/s Syndicate Auto Components, M/s Sona Somic, M/s Time Technoplast Ltd., Unit-I, M/s Time Technoplast Ltd., Unit-II, M/s Hindustan Zinc Ltd., Pantnagar, M/s Hindustan Zinc Ltd., Haridwar
...Respondents
Date of order 13.03.2014
In the matter of:
Notice under Section 142 of the Electricity Act, 2003 in the matter of Non-compliance of the Commission’s Directions with regard to the electricity theft caught by departmental Vigilance on 26.05.2012 in Sarverkhera area of EDD-Kashipur (Udham Singh Nagar). In the matter of:
Uttarakhand Power Corporation Limited (UPCL),
Urja Bhawan, Kanwali Road, Dehradun
Date of order 11.03.2014
AND
Non-compliance of Commission’s directions with regard to Commercial Performance
Monitoring of the licensee including submission of monthly periodical reports in the
prescribed formats by UPCL and Commission’s Order dated 04.03.2013. AND In the matter of: Uttarakhand Power Corporation Limited (UPCL), Urja Bhawan, Kanwali Road,
Dehradun AND In the matter of:
1. Shri A.K. Johri, the then MD, UPCL
2. Shri Anil Kumar, the then Executive Director (Commercial), UPCL and
at present Director (Operations), UPCL … Respondent
Date of order 10.03.2014
In the matter of:Notice under Section 142 of the Electricity Act, 2003 in the matter of Non-compliance of
Commission’s Directions. AND In the matter of:Non-compliance of the Orders of Consumer Grievance Redressal Forums (CGRF) In the matter of:Uttarakhand Power Corporation Limited (UPCL), Urja Bhawan, Kanwali Road,
Dehradun
Date of order 28.02.2014
In the matter of: Application seeking approval for investment on the project for implementing
Integrated Automatic Meter Reading (IAMR) System. AND In the matter of:Uttarakhand Power Corporation Ltd. (UPCL),
Urja Bhawan, Kanwali Road, Dehradun
Date of order 28.02.2014
In the matter of:Approval of Capital Investments under Para 11 of the Transmission and Bulk Supply Licence [Licence No. 1 of 2003]. In the matter of:Power Transmission Corporation of Uttarakhand Limited. (PTCUL)
Vidyut Bhawan, Near ISBT Crossing, Saharanpur Road, Majra,
Dehradun. …Petitioner
AND In the matter of: Petitions No.1 of 2014 to Petition No. 9 of 2014 filed by Power Transmission Corporation of Uttarakhand Limited (PTCUL).
Date of order 24.01.2014
In the matter of:Non-compliance of Commission’s Order dated 02.04.2013 in the matter of delay in release of new connections to BSNL.
AND
Managing Director, Uttarakhand Power Corporation Ltd. (UPCL): Respondent
Date of order 23.01.2014
In the matter of: Non-compliance of UERC (The Electricity Supply Code) Regulations, 2007 with regard to ‘Additional Security Deposit’.
AND
Managing Director, Uttarakhand Power Corporation Ltd. (UPCL): Respondent
AND
Executive Engineer, Urban Distribution Division (South), UPCL, Dehradun: Respondent
Date of order 22.01.2014
In the matter of:Suo-moto proceedings initiated by the Commission for non-compliance by UPCL of UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010 & UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010 and non-compliance of directions issued vide the Commission’s Order dated September 11, 2013. AND
Uttarakhand Power Corporation Ltd. … Respondent AND
Uttarakhand Renewable Energy Development Agency ... Respondent
Date of order 16.01.2014
In the matter of: Representation of M/s Bhilangana Hydro Power Ltd. seeking clarification in the matter of impact on accreditation of its 24 MW Bhilangana-III HEP on participation in tender process invited by distribution licensees for procurement of RE Power to meet their Renewable Purchase Obligation. AND
M/s Bhilangana Hydro Power Ltd. V/s
Uttarakhand Renewable Energy Development Agency
Date of order 16.01.2014
In the matter of: Non-compliance of UERC (Release of New HT & EHT Connections, Enhancement and Reduction of Loads) Regulations, 2008. AND
M/s Gold Plus Glass Industry Limited, Thithola (Roorkee) V/s
Uttarakhand Power Corporation Ltd. (UPCL)
Power Transmission Corporation of Uttarakhand Ltd. (PTCUL)
Date of order 16.01.2014
in the matter of Suo-moto proceedings initiated by the Commission for non-compliance by UPCL of Section 59 of the Electricity Act, 2003 read with Regulation 5 of UERC (Standard of Performance) Regulations, 2007.
AND
Uttarakhand Power Corporation Limited.
Date of order 08.01.2014
In the matter of: Application filed by UPCL for approval of procurement of 200 MW (+/- 20%) power on Medium term basis with respect to Guidelines for Determination of Tariff by Bidding Process by Distribution Licensee as notified by MoP Govt. of India vide No. 23/11/2004-R&R dated 19.01.2005 and its amendments from time to time. AND
Uttarakhand Power Corporation Limited.
Miscellaneous Orders-Year-2013
Date of order 21.11.2013
In the matter of: Non-Compliance of Commission’s directions in the matter of Energy loss report of furnace feeders in the State. AND
Petition under provisions of the Regulation 20 read with Regulation 74 of UERC (Conduct of Business) Regulations, 2004 to reconsider and recall the ex-parte order dated 07.05.2013 and Non-compliance of Commission’s directions in the matter of Energy loss report of furnace feeders in the State. AND
Shri A.K. Johri, the then Managing Director (MD), Uttarakhand Power Corporation Ltd., Dehradun.
Date of order 04.10.2013
In the matter of:Applications filed by Renewable Energy Generators seeking determination of project specific tariff. AND
M/s Birahi Ganga Hydro Power Ltd.
M/s Rishiganga Power Corp. Ltd.
M/s Himalaya Hydro Pvt. Ltd. ……..Petitioner AND
Uttarakhand Power Corporation Ltd. ……Respondent
Date of order 03.10.2013
In the matter of: Clarification on the date of applicability of Tariff as directed vide the Commission’s Order dated April 05, 2013.
Date of order 26.09.2013
In the matter of: Determination of Average Pooled Cost of Power Purchase (APPC) for the financial year 2013-14 for fulfilment of requirement specified under UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010.
Date of order 16.09.2013
In the matter of:Approval in deviation in guidelines for Short term procurement of power by Distribution licensee through tariff based bidding process issued by MoP dated 15.05.2012.
Date of order 11.09.2013
In the matter of:Suo-moto proceedings initiated by the Commission for non-compliance by UPCL under UERC (Tariff and Other Terms for Supply of Electricity from non- conventional and Renewable Energy Sources) Regulations, 2010 and UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010 AND
UPCL
Date of order 08.07.2013
In the matter of: Application in pursuance to Show-Cause notice no. UERC/6/TF-142/12-13/2013/1720 dated March 12, 2013. AND In the matter of: Declaring the Petitioner Company being captive user as Cogeneration outside the purview of the "Obligated Entity" as defined under UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010. AND In the matter of: M/s Birla Tyres Kesoram Industries Versus
Uttarakhand Renewable Energy Development Agency
Date of order 14.06.2013
In the matter of:Non-compliance of Order dated 05.10.2012 of CGRF (Kumaon Zone) issued on the review petition No. 10/2012 of UPCL in the matter of Sh. Chaan Singh Jeena.
Date of order 14.06.2013
In the matter of: Uttarakhand Power Corporation Limited’s proposal seeking approval of the Commission for scheduled load shedding in the State of Uttarakhand u/s 23 of the Electricity Act, 2003. 14.06.2013
in the matter of Non-compliance of the Commission’s directions with regard to a news published on 23.01.2013 in a Hindi news paper ‘Amar Ujala’, in the matter of Shri Chamu Singh Mahara.
Date of order 14.06.2013
In the matter of:Non-compliance of the Commission’s Order dated 10.01.2013 in the matter of violation of Standards of Performance Regulations and Licence Conditions by UPCL with regard to the complaint of Smt. Geeta Bisht.
Date of order 23.05.2013
In the matter of: Approval of Capital Investment under Para 11 of the Transmission Licence [Licence No. 1 of 2003] AND in the matter of Application No.772/MD/PTCUL/UERC dated 07.05.2012 for approval of PS (EHV) financed by PFC filed by Power Transmission Corporation of Uttarakhand Limited.
Date of order 08.05.2013
In the matter of: Application seeking Determination of Tariff for projects specific tariff AND
M/s Birahi Ganga Hydro Power Ltd.
M/s Himalaya Hydro Pvt. Ltd.
M/s Rishiganga Power Corp. Ltd. AND
Uttarakhand Power Corporation Ltd.
Date of order 07.05.2013
In the matter of: Non-compliance of Commission’s directions in the matter of Energy loss report of furnace feeders in the State. And Managing Director, Uttarakhand Power Corporation Ltd., Dehradun
Date of order 29.04.2013
In the matter of: Petition No. 11 of 2012 Approval of Capital Investment under Para 11 of the Transmission Licence [Licence No. 1 of 2003] & Application No.43/Director (Project)/PTCUL/UERC dated 05.01.2013 for investment approval of 220 kV Ghansali substation and other associated lines & bay works submitted by Power Transmission Corporation of Uttarakhand Limited.
AND
Petition No. 20 of 2012
Dispute between M/s Bhilangana Hydro Power Limited (Bhilangana-III SHP) and Power Transmission Corporation of Uttarakhand Ltd., regarding the obligation to make payment of additional transmission charges for the alleged dedicated transmission network
Date of order 05.04.2013
Order in the matter of Order in the matter of: Suo-moto proceedings initiated by the Commission on the representation of M/s Rai Bahadur Narain Singh Sugar Mills Ltd., Laksar, Haridwar regarding tariff charged by UPCL. Corrigendum on dated 3rd Oct 2013.
Date of order 03.10.2013
Order in the matter of Order in the matter of: Suo-moto proceedings initiated by the Commission on the representation of M/s Rai Bahadur Narain Singh Sugar Mills Ltd., Laksar, Haridwar regarding tariff charged by UPCL. Corrigendum on dated 3rd Oct 2013. 05.04.201303.10.2013
Date of orde 02.04.2013
Order in the matter of Non-compliance of Commission’s Regulations and Licence Conditions by Uttarakhand Power Corporation Limited (UPCL) with regard to complaint filed by Superintending Engineer (E), Bharat Sanchar Nigam Limited (BSNL), Dehradun in the matter of inordinate delay in releasing new connections.
Date of order 04.03.2013
Order in the matter of Non-compliance by UPCL (Distribution Licensee) of Commission’s directions with regard to Commercial Performance Monitoring of the licensee including submission of monthly periodical reports in the prescribed formats in the matter.
Date of order 20.02.2013
Order in the matter of Approval of Capital Investment under Para 11 of the Transmission Licence [Licence No. 1 of 2003] and in the matter of Application No. 582/PTCUL/MD/UERC dated 17.04.2012 for approval of PS (EHV) REC-VIII filed by Power Transmission Corporation of Uttarakhand Limited.
Date of order 01.02.2013
Order in the matter of Minutes of Meeting dated 24.08.2012 and order dated 01.01.2013 of the Commission on non-compliance of the Commission’s directions issued to UPCL.
Date of order 16.01.2013
Order on Approval of Capital Investment under Para 11 of the Transmission Licence [Licence No. 1 of 2003]
Date of order 10.01.2013
Order on non-compliance of Standards of Performance Regulations and Licence Conditions by UPCL
Date of order 08.01.2013
Order on petition filed by UPCL for review of Commission's Order dated 17.12.2012
Date of order 08.01.2013
Order on Review Petition on the Petition filed by UPCL seeking determination of tariff of its Vanala SHP
Date of order 08.01.2013
Order in the matter of Non-compliance of UERC (State Grid Code) Regulations, 2007 and the Commission’s directions by SLDC
Date of order 01.01.2013
Order in the matter of Non-compliance of the Commission’s directions by UPCL with regard to MoM dated 24.08.2012
Miscellaneous Orders-Year-2012
Date of order 21.12.2012
in the matter of Petition filed by M/s. Him Urja (P) Ltd. seeking determination of tariff of its Vanala SHP.
Date of order 19.12.2012
Order in the matter of Approval of Capital Investment under Para 11 of the Transmission Licence [Licence No. 1 of 2003]. AND in the matter of Application No. 931/PTCUL/MD/UERC dated 29.05.2012 for approval of SI (Transmission) Scheme filed by Power Transmission Corporation of Uttarakhand Limited
Date of order 19.12.2012
in the matter of Order in the matter of Approval of Capital Investment under Para 11 of the Transmission Licence [Licence No. 1 of 2003]. AND in the matter of Application No. 581/PTCUL/MD/UERC dated 17.04.2012 for approval of PS (EHV) REC-VII filed by Power Transmission Corporation of Uttarakhand Limited.
Date of order 19.12.2012
Order in the matter of Suo-moto proceedings initiated by the Commission for non-compliance by UPCL under UERC (Tariff and Other Terms for Supply of Electricity from non- conventional and Renewable Energy Sources) Regulations, 2010 and UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010 and also on the Petition filed by UPCL for revision of Renewable Purchase Obligation due to difficulties faced in procurement of power from renewable power producers by it.
Date of order 17.12.2012
Order in the matter of Dispute between M/s Swasti Power Engineering Limited and Uttarakhand Power Corporation Limited arising out of the Power Purchase Agreement dated 03.07.2009.
Date of order 11.12.2012
Order in the matter of dispute between M/s Bhilangana Hydro Power Limited (Bhilangana-III SHP) and Power Transmission Corporation of Uttarakhand Ltd., regarding the obligation to make payment of additional transmission charges for the alleged dedicated transmission network.
Date of order 04.12.2012
Order on approval of PS (EHV) REC-VI filed by Power Transmission Corporation of Uttarakhand Limited
Date of order 06.09.2012
Order in the matter of Application for review of the Commission’s Order dated 14.02.2012 on the petition filed by M/s R.V. Akash Ganga Infrastructure Limited seeking amendments in Power Purchase Agreement executed on 21.08.2010 with UPCL.
Date of order 03.09.2012
Order in the matter of Representation made by M/s. Sravanthi Energy Pvt. Ltd. for refund of Supervision charges of Rs. 45.32 Lac paid to Power Transmission Corporation of Uttarakhand Ltd.
Date of order 03.08.2012
Order on Bhilangana-III & UPCL reg. obligation to make payment of additional transmission charges for augmentation work
Date of order 18.06.2012
Order on Application filed by UPCL seeking approval for the investment on the project covering installation of capacitor banks on 11 kV at 33 & 11 kV substations
Date of order 12.06.2012
In the matter of M/s Bhilangana Hydro Power Ltd. Versus Uttarakhand Renewable Energy Development Agency (Respondent) and in the matter of: Representation of M/s Bhilangana Hydro Power Ltd. for REC Accreditation of Bhilangana–III project under Regulation 9 (3) of the UERC (Compliance of Renewable Purchase Obligation) Regulation, 2010
Date of order 29.05.2012
OOrder in the matter of Determination of Average Pooled Cost of Power Purchase (APPC) for the financial year 2012-13 for fulfilment of requirement specified under UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010
Date of order 25.05.2012
Order in the matter of Petition No. 14 of 2012 filed by UPCL regarding waiver and refund of penalty imposed by the Commission vide its Order dated 11.08.2005
Date of order 02.05.2012
PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY
Date of order 30.04.2012
in the matter of Approval of Capital Investment under Para 11 of the Transmission and Bulk Supply Licence [Licence No. 1 of 2003]
AND In the matter of Power Transmission Corporation of Uttarakhand Limited 7-B, Lane No. 1, Vasant Vihar Enclave Dehradun AND In the matter ofApplication No. 522/MD/PTCUL/UERC dated 07/04/2012 filed by Power Transmission Corporation of Uttarakhand Limited in connection with protection of 15 nos. tower foundations of 132 kV Bindal-Majra Double Circuit line.
Date of order 16.03.2012
In the matter of Representation made by M/s Sravanthi Energy Private Limited regarding treatment of start up power from UPCL and commercial treatment of infirm power and also clarification sought by UPCL on the issue of start up power for testing and pre commissioning activities And UPCL
Date of order 13.03.2012
In the matter of Determination of charges applicable on the customers seeking open access to intra State transmission and/or distribution system in accordance with UERC (Terms and Conditions of Intra State Open Access) Regulations, 2010
Date of order 14.02.2012
In the matter ofClarification sought by UPCL on levy of 15% Surcharge on Continuous Process Industries vide their letter no. 145/UPCL/COM dated 21.01.2012.
Date of order 14.02.2012
In the matter ofM/s. R.V. Akash Ganga Infrastructure Limited reg. amendments in the Power Purchase Agreement dated 21.08.2010 executed with UPCL in accordance with the provisions of UERC (Tariff and Other Terms for Supply of Electricity from Non-conventional and Renewable Energy Sources) Regulations, 2010 and also Removal of Difficulty (First) Order, 2010 dated 28.10.2010.
Date of order 13.02.2012
In the matter of Uttarakhand Power Corporation Limited’s Petition seeking Commission’s approval on Average Pooled Cost of Power Purchase (APPC) for the financial year 2011-12 for fulfillment of requirement specified under UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010
Miscellaneous Orders-Year-2011
Date of order 23.12.2011
In the matter of Petition no. 07 of 2011 dated 13.10.2011 filed by Uttarakhand Renewable Energy Development Agency and Determination of Fees and Charges under Regulation 6.4 and 12.1 of UERC (Compliance of Renewable Purchase Obligation) Regulation, 2010.
Date of order 12.12.2011
In the matter of the matter of Approval of Capital Investment under Para 11 of the Transmission and Bulk Supply License [License No. 1 of 2003] and Application No. 813/PTCUL/MD/UERC dated 18.05.2009 for approval of PS (EHV) REC-V filed by Power Transmission Corporation of Uttarakhand Limited
Date of order 08.12.2011
Order on non compliance of Commission's Regulations & Directions & Action plan on Commercial Performance, Safety and Consumer Complaints
Date of order 29.11.2011
In the matter of non compliance of Commission's Regulations & Directions & Action plan on Commercial Performance, Safety and Consumer Complaints December 08, 2011
Extension of applicability of following Regulations for a period upto 30.04.2012, unless reviewed earlier or extended further, beyond their present period of applicability:
1. UERC (Terms & Condition for Determination of Generation Tariff) Regulations, 2004
2. UERC (Terms & Condition for Determination of Transmission Tariff) Regulations, 2004
3. UERC (Terms & Condition for Determination of Distribution Tariff) Regulations, 2004 EnglishHindi
Date of order 24.11.2011
In the matter ofin the matter of Application No. 946/PTCUL/MD/UERC dated 03.07.2009 for approval of PS (EHV) REC-IV filed by Power Transmission Corporation of Uttarakhand Limited
Date of order 21.10.2011
Commission's order for investment on construction of steel bridge across Dakpathar-Dhakrani Power Channel
Date of order 18.10.2011
In the matter of application seeking approval of UERC for declaring the Food Processing Industry as seasonal industry under clause-4 of the Rate Schedule RTS-7 to the Tariff Order for the FY 2011-12
Date of order 22.09.2011
Order in the matter of M/s Chamoli Hydro Power Private Limited.
Date of order 20.09.2011
In the matter of the matter of M/s RBNS Sugar Mills
Date of order 08.08.2011
Order on Additional Surchargeto meet the fixed cost of UPCL arising out of its obligation to supply together with re-determination of cross subsidy surcharge
Date of order 08.07.2011
In the matter ofthe matter of Evacuation of Power of Bhilangana Hydro Power Project -III
Date of order 17.03.2011
In the matter of
Order on UPCL initiatives for providing better consumers services for Meter Reading, Billing and Collection
Date of order 25.02.2011
In the matter ofNon-compliance of the Commission’s directions on the complaint of Shri Pradeep Datta, Executive Director, M/s Datt Infrastructure & Services Ltd., 12-D, Race Course Dehradun regarding tapping of 33kV independent feeder of Dev Bhoomi Industrial Estate, Pohana-Iqbalpur Road, Roorkee
Miscellaneous Orders-Year-2010
Date of order 29.11.2010
Order on Intra State Open Access Charges
Date of order 27.10.2010
Order on Amendment in Tariff of Debal and Loharkhet Small Hydro Power Projects
Date of order 15.10.2010
UERC(Conduct of Business) Regulations (Removal of Difficulties) (First) Order, 2010 EnglishHindi
Date of order 06.10.2010
Order on Application filed by UPCL seeking approval of the Commission for the investment on the project covering the works covered under RAPDRP including Non-RAPDRP areas for the development of integrated and unified solutions & in the matter of UPCL.
Date of order 06.10.2010
Order on Non-compliance of the Commission’s directions for not submitting the investigation report on damage of household appliances in Drona Vatika Gujrara, Dehradun
Date of order 06.10.2010
Order on
Complaint filed by Sh. Manohar Singh Rawat against Electricity Officers in Munsiyari Division and Pithoragarh
Date of order 05.10.2010
Order on
Excessive delay in release of connection of Bajpur Co-operative Sugar Factory Ltd., Bajpur, Udham Singh Nagar
Date of order 01.10.2010
Order on Intervener Application of M/s Swastik Solvent Products (India) Ltd., District-Rampur and in the matter of Sh. Ranjit Singh & Other Vs. UPCL & Others
Date of order 01.10.2010
Order in the matter of Shri Ranjit Singh & Others Vs. UPCL & Others
Date of order 16.09.2010
Order on Restriction of Over-drawal of Power by UPCL from the Grid based on the CERC (Unscheduled Interchange Charges and related matters) (Amendment) Regulations, 2010
Date of order 16.09.2010
Order on Investment on Project covering the construction of new 33 kV Double Circuit Line from 33 kV Sub-station Ghansali to Pipaldali Junction Point including dismantling of existing single circuit line
Date of order 20.08.2010
Order in the matter of Sh. Ranjit Singh & Other Vs. UPCL & Others
Date of order 19.08.2010
Order in the matter of the Investment on the project covering the construction of 05 Nos. new 33/11 Substations & their associated lines
Date of order 25.05.2010
Order in petition filed by Sh. Ranjit Singh
Date of order 23.04.2010
Order in Complaint filed by Sh. Manohar Singh Rawat
Date of order 18.04.2010
Order inScheduled Load Shedding
Date of order 08.04.2010
Order in Approval of additional load of 4 MVA to Birla Tyres, Haridwar by releasing power load of 14 MVA on supply voltage of 33 kV
Date of order 31.03.2010
Order on the matter of waiver of token penalties imposed by the Commission in the Tariff Order for the FY 2009-10 for late submission of ARR/Tariff filings by licensees and the generating company
Date of order 18.02.2010
Order in the matter of Violation of provisions of Indian Electricity Rules, 1956 and Commission’s directions on providing proper neutral grounding, earthing and protective system
Date of order 18.01.2010
Order on Power Cut
Miscellaneous Orders-Year-2009
Date of order 30.12.2009
Order in Determination of Final Tariff for Maneri Bhali Stage II Large Hydro Power Project u/s 62(1)(a) and 86 of the Electricity Act, 2003
Date of order 30.12.2009
Order inApplication of Vanala Small Hydro Project of 15 MW in District Chamoli for grant of permission of Open Access for carrying electricity from Vanala SHP to outside the State of Uttarakhand.
Date of order 30.12.2009
Order inApplication of Swasti Power Engineering Limited in respect of its Bhilangana Hydro Power Project (BHPP) (3 x 7.5 MW) generating station for grant of open access for evacuation of power upto the CTU/ Grid.
Date of order 15.12.2009
Order in Electrocution of Sh. Usman, Dehradun on 09.09.2009
Date of order 22.11.2009
Order in Application for Approval of the Commission for the Investment on the Project covering the Construction of 16 new 33 & 11 kV Sub-Stations and their Associated Lines
Date of order 22.11.2009
Order in One-Time Checking & Correction of Metering System of KCC Consumers and Monthly Monitoring of their Billing MRI Data
Date of order 22.10.2009
Order inViolation of Provisions of IE Rules 1956 and Proper Neutral Grounding, Earthing and Protective System
Date of order 22.10.2009
Order in Electrocution of Sh. Bhagwant Lal, Village- Aholi Sunar (Syali), Almora on 13-14.08.2008
Date of order 31.08.2009
Order in Complaint filed by Shri A.S. Bisht with regard to Routing of LT Line at a very low height
Date of order 17.08.2009
Order inComplaint filed by Shri M.S. Bisht, Haridwar and Wrong Reporting in Division Wise Monthly Report on Release of New Connections
Date of order 20.06.2009
Order in Power Cut -
Order
Annexures
Date of order 10.06.2009
Interim Order on Vanala SHP of 15 MW for grant of permission of Open Access for carrying Electricity.
Date of order 18.05.2009
Order on Works Charges for Enhancement or Reduction of Contracted Load for HT & EHT Connections to be charged by the Distribution Licensee
Date of order 06.03.2009
Order on Payment of Security Deposit and Additional Security Deposit by way of Bank Guarantee or Letter of Credit
Date of order 23.01.2009
On Review Petition of Commission's Order dated 18-03-2008 for FY 2007-08 & FY 2008-09
Miscellaneous Orders-Year-2008
Date of order 23.12.2008
Order onNon-compliance of Section 59 of Electricity Act, 2003 and Regulation 5 of the UERC (Standards of Performance) Regulations, 2007
Date of order 05.12.2008
Order onfinalisation of Clause 6 of RTS-7
Date of order 27.10.2008
Order on Earthed Terminal and Installation & Maintaining records of Test Results
Date of order 27.10.2008
UERC's Order on Neutral Grounding Earthing System
Date of order 20.10.2008
UERC's order in the matter of Show cause notice dated 05.09.2008 in the matter of non compliance of regulation of the UERC (The Electricity Supply Code) Regulations 2007 on Periodical Testing of Meters
Date of order 15.10.2008
In the matter of Complaint filed by Dr. Sarla Raman, for payment of compensation for delay in restoration of supply and replacement of burnt meter by UPCL.
Date of order 24.07.2008
UERC's Order on Penalties imposed by UPCL on industries for excess usage of power during the restricted period effective from 31.12.2007 to 15.02.2008.
Date of order 14.05.2008
Commission’s order dated 30.8.2007 regarding waiver of late payment surcharge for recovery of electricity arrears outstanding against PTW consumers.
Date of order 25.04.2008
Order on Application seeking waiver of compensation payable by UPCL as per sub-regulation (3.3.4) of regulation 3.3 of the UERC (The Electricity Supply Code) Regulations, 2007.
Date of order 01.04.2008
Suo-moto proceedings for investigation of billing details of industrial consumers about 35 BHP of UPCL.
Date of order 29.03.2008
Order on Power Overdraw by UPCL from grid when grid frequency is below 49.5 Hz.
Date of order 09.01.2008
Application seeking extension of time of submission of Aggregate Revenue Requirement and Tariff Proposal for FY 2008-09
Miscellaneous Orders-Year-2007
Date of order 26.12.2007
UPCL Proposal, seeking approval of the Commission on scheduled load shedding with immediate effect in the State of Uttarakhand for the period up to 15th January, 2008.
Date of order 23.10.2007
In the Matter of approval of Capital Investment under Para 11 of the Transmission and Bulk Supply License [License No. 1 of 2003].
Date of order 30.08.2007
in the matter of application seeking approval of the Commission regarding introduction of Scheme of waiver of Late Payment Surcharge for recovery of electricity arrears outstanding against Private Tube-well/Pump Set Agriculture Consumers.
Date of order 17.08.2007
Order on Show Cause Notice dated 13.04.2007 regarding supply of electricity to Industrial consumers on selective basis
Date of order 27.07.2007
In the matter ofRate of Interest payable on Security Deposit of consumers.
Date of order 15.05.2007
No scheduled power cuts shall be allowed in the State except in the event of any direction in this regard from RLDC till concept paper is finalized.
Date of order 24.04.2007
In the matter ofApplication seeking review of the Commission’s Order dated 22-12-2006 imposing penalty u/s 142 of the Electricity Act, 2003 for non-compliance of Commission’s directions for implementing ToD tariff in the State.
Date of order 30.03.2007
Application filed by Shri B.M. Verma, Chairman and Managing Director on behalf of UPCL, seeking time for complying with UERC (Release of New LT Connection Enhancement, and Reduction of Loads) Regulations, 2007.
Date of order 09.01.2007
In the Matter of Non compliance of Commission’s order for ToD meter in the State and hearing in the matter held on 20.12.2006.
Miscellaneous Orders-Year-2006
Date of order 22.12.2006
In the Matter of Show Cause Notice dated 01.12.2006 issued to Shri B. M. Verma S/o Late Shri Walaiti Ram R/o 220, Vasant Vihar, Phase-II, Dehradun regarding non compliance of Commission’s Orders for implementing ToD tariffs in the State.
Date of order 18.09.2006
The Commission has decided to get the issue of defective bills, investigated through an independent expert agency under section 128 of the Electricity Act, 2003
Date of order 17.03.2006
The Commission directs the committee and its member to ensure no delays in ongoing statutory investigation regarding some discrepancies in accounting of substantial surpluses accruing to Uttaranchal Power Corporation Ltd. (UPCL).
Date of order 21.02.2006
Notice to UPCL to show cause why action should not be initiated against it for its failure to comply with orders of the Redressal Forum dated 14/17.12.2005 for refund of excess amount realised from consumers, after 20.09.2003.
Date of order 20.02.2006
in the matter of Penalty imposed by UPCL and demanded by the Executive Engineer, Distribution Division (Rural) Dehradun for use of Electricity by the Petitioner during peak hours.
Miscellaneous Orders-Year-2005
Date of order 07.12.2005
Final opportunity to UJVNL to submit tariff proposals along with detailed data on its costs for Generation tariff of UJVNL's plants.
Date of order 28.11.2005
Detailed investigation of the issue of the surplus earned by the distribution licensee investigated under Section 128 of the Electricity Act, 2003.
Date of order 10.11.2005
In the matter ofPaper on “Approach to Initial Tariff for Generating Stations with capacity upto 1 MW” circulated on 08.09.2005 and in the matter of Tariff determination for hydro generating stations having installed capacity upto 1 MW.
Date of order 10.11.2005
In the matter of Paper on “Approach to Initial Tariff for New Hydro Generating Stations with capacity above 1 MW and upto 25 MW” and in the matter of Tariff determination for hydro generating stations having installed capacity above 1 MW and upto 25 MW.
Date of order 01.09.2005
in the matter of Show cause notice dated 30-05-2005 under sections 142 and 146 of the Electricity Act, 2003 and in the matter of Non-compliance of directions pertaining to arrangements for collection of bills of domestic consumers.
Date of order 11.08.2005
In the matter of Non compliance by UPCL of provisions of Section 55 of the Electricity Act, 2003 and UPCL’s Application under Section 55 of the Electricity Act, 2003 dated 26.05.2005.
Date of order 11.04.2005
Reject of petitioner application of M/s Arpit Steel and others V/s UPCL.
Date of order 08.04.2005
Transfer of Petition No 3,5,7 of 2003 for hearing & disposal by the Commission to CGRF, Garhwal Zone, D.Dun and Commission passed an interim order on the petitions & UPCL challenged the orders of the Commission & filed writ petition.
Date of order 24.01.2005
Admit of PTCUL's ARR petition for FY. 2005-06.
Date of order 19.01.2005
Admit of UPCL's ARR petition for FY. 2005-06
Miscellaneous Orders-Year-2004
Date of order 31.12.2004
Final opportunity to UPCL to submit its ARRs and tariff proposals for the years 2004-05 and 2005-06 alongwith requisite information in accordance with the distribution and transmission tariff regulations by 15.01.2005.
Date of order 28.01.2004
To get a fair and accurate report on compliance of Commission’s directions listed out in Chapter-7 of the Commission's Tariff Order dated 08.09.2003 of UPCL, Constitution of Experts Committee & committee submit report to the Commission by 31-01-2005.
Date of order 25.10.2004
Interim Order in the matter of Wrong application of electricity tariff by UPCL to Defence Bulk Consumers and in the matter of Commander Works Engineer (Hills), Military Engineer Services & Uttaranchal Power Corporation Ltd.
Date of order 11.10.2004
Clubbing of UJVNL's applications as decided in the proceedings already initiated by Commission vide its order dated 31.08.2004 and the information summoned shall be produced before the Commission by 26.10.2004.
Date of order 31.08.2004
UJVNL to submit its tariff proposals of 09 plants latest by 15.09.04 along with detailed data on its costs in accordance with the regulations already notified in the formats already sent vide Commission’s letter no 37/UERC/UJVNL dated 23.01.04.
Date of order 09.08.2004
Recovery of charges exceeding the tariff for domestic consumers.
Date of order 12.07.2004
in the matter of Change in the adhoc power purchase rate of 37 paise/unit fixed in Tariff order dated 8th September 2003.
Date of order 09.07.2004
in the matter of Suomoto proceedings initiated with respect to meter reading, billing and collection from Domestic Consumers.
Date of order 04.06.2004
in the matter of Approval of capital investment under clause 11 of Transmission and Bulk Supply Licensee and Distribution and Retail Supply License.
Date of order 04.06.2004
in the matter of Misc. Applications No. 1 & 2 of 2004 dated 05 -04-2004 filed by Uttaranchal Jal Vidyut Nigam Ltd, Dehradun seeking recall and stay of Commission’s Order dated 19.03.2004.
Date of order 17.05.2004
in the matter of Misc. Applications dated 15-09-2003 (No. 24/2003) and dated 29-09-2003 (No.27/2003) filed before the Commission by Uttaranchal Jal Vidyut Nigam Ltd, Dehradun.
Date of order 19.03.2004
in the matter of Sale of electricity generated by the generating units of Uttaranchal Jal Vidyut Nigam Ltd. and which is surplus to the requirement of consumers of Uttaranchal State.
Date of order 13.02.2004
in the matter of Approval of capital investment under para 11 of Transmission and Bulk Supply Licensee and Distribution and Retail Supply Licensee.
Date of order 09.02.2004
Interim Order in the matter of recovery of charges exceeding the tariff for domestic consumers.
Date of order 27.01.2004
in the matter of Levy and realization of independent feeder charges by Uttaranchal Power Corporation Ltd from M/S Ace Glass Containers Pvt. Ltd ,the petitioner.
Date of order 22.01.2004
in the matter of Approval of capital investment under clause 11 of Transmission and Bulk Supply Licence and Distribution and Retail Supply Licence.
Date of order 09.01.2004
Order on Late Payment Surcharge of Private Tubewell/ Pump set consumers
Miscellaneous Orders-Year-2003
Date of order 15.10.2003
Interim Order on preliminary objection raised by UPCL on constitution & Jurisdiction of the Commission.
Date of order 20.03.2003
Interim Order on Petition No. 07 of 2003 of M/s Kotdwar Steel Ltd. & others and M/s UPCL & others. 2003
Date of order 20.03.2003
Interim Order in the matter of: M/S Amrit Varsha Udyog Ltd. Kotdwar and 11 Others Vs UPCL & others.
Date of order 15.01.2003
Order on unjustified levy of independent feeder surcharge
Disclaimer: While every care has been taken to ensure the accuracy of information furnished in this website, UERC does not accept any responsibility or liability for any damage or loss to any person for the result of any action taken on the basis of this information. However, UERC shall be obliged if errors/omissions are brought to its notice for carrying out corrections in the next update.
Best Viewed in Chrome. Best Resolution to view 1280*768 Pixel